Solicitation
GRCA 257282 - Replace Wastewater Plant at South Ri
Department of the Interior · National Park Service
A newer version of this notice was posted Nov 16, 2026. See the latest version.
AI summary Beta
Summary of the version posted Nov 10, 2026. The notice was amended Nov 16, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 44 of 56 attachments weren't read (Sol_140P2026R0101_Amd_0003.pdf, B09_Amendment_03_SF30_0003.pdf and 42 more). Check the attachments on SAM.gov.
The National Park Service (NPS), Denver Service Center, wants a general contractor to build a new 0.65 million-gallon-per-day (MGD) membrane bioreactor wastewater treatment plant at Grand Canyon South Rim Village, under solicitation 140P2026R0101. It is open to all businesses (full and open competition), with a response due date of December 18, 2026, 3:00 PM Mountain, and Amendment 0009 says a later amendment will set a new date. Construction is more than $10,000,000 and must finish within 1,095 days after notice to proceed.
Who can bid (4)
- Current, active SAM.gov registration when the offer is submitted From B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf
- Bid guarantee with the offer: SF 24 bid bond or another suitable guarantee under the bid guarantee provision From B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf
- Firms that helped develop the design or specifications for this project cannot bid or receive any part of the award From B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf
Show all 4Show fewer
- Named key personnel (project manager, job site superintendent, quality control manager, safety manager) and key trade firms (process, mechanical/plumbing, electrical, civil) that cannot be swapped without approval
How to submit: Email only, to the contracting officer, the contract specialist and CS_DSC_Proposal_Submission@nps.gov, with the solicitation number, park project number and 'email x of x' in the subject line. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
- Serious: Bid bond now, performance and payment bonds after award. You need a surety to issue an SF 24 bid bond with your offer and then performance and payment bonds on a project over $10,000,000, which is hard for newer small firms. From B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf
- Serious: Wastewater plant experience and 40% self-performance. Past projects must be comparable wastewater plant work, and prime experience counts only when the firm self-performed at least 40% of the contract cost, so a thin record will score poorly. From B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf
- Worth checking: Funding not yet available. The requirement is unfunded for now; award will happen only if and when funds become available. From B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf
Show all 8Show fewer
- Worth checking: Conformed specifications still to come. Amendment 0009 says a conformed set of specifications and drawings with all question answers will be released in mid-December 2026, so pricing may rest on changing documents. From Sol_140P2026R0101_Amd_0009.pdf
- Worth checking: Questions were due Oct 29, 2026. Check the amendments for the agency's answers. From Sol_140P2026R0101_Amd_0008.pdf
- Worth checking: Liquidated damages for late completion. Finishing late costs $5,856.43 for each calendar day of delay. From B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf
- Worth checking: Remote park site with seasonal limits. The plan must cover winter weather, access limits, high-visitor periods, staging space and commute distances at the South Rim. From B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf
- Minor: Registration closed Sep 11, 2026. If registering was required to take part, ask the contracting officer whether late registration is allowed. From Sol_140P2026R0101_Amd_0004.pdf
Read from the notice and 12 attachments. 44 of 56 not read. Show which files.
- B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf (read)
- Sol_140P2026R0101_Amd_0009.pdf (read)
- B09_Amendment_09_SF_30_0009.pdf (read)
- Sol_140P2026R0101_Amd_0008.pdf (read)
- Sol_140P2026R0101_Amd_0007.pdf (read)
- B09_Amendment_07_SF_30_0007.pdf (read)
- Sol_140P2026R0101_Amd_0006.pdf (read)
- B09_Amendment_06_SF_30_0006.pdf (read)
- Sol_140P2026R0101_Amd_0005.pdf (read)
- B09_Amendment_05_SF_30_0005.pdf (read)
- Sol_140P2026R0101_Amd_0004.pdf (read)
- B09_Amendment_04_SF30_0004.pdf (read)
- Sol_140P2026R0101_Amd_0003.pdf: not summarized: open it on SAM.gov
- B09_Amendment_03_SF30_0003.pdf: not summarized: open it on SAM.gov
- Sol_140P2026R0101_Amd_0002.pdf: not summarized: open it on SAM.gov
- B09_Amendment_02_SF30_0002.pdf: not summarized: open it on SAM.gov
- Sol_140P2026R0101_Amd_01.pdf: not summarized: open it on SAM.gov
- B09_Amendment_01_SF30_01.pdf: not summarized: open it on SAM.gov
- Sol_140P2026R0101.pdf: not summarized: open it on SAM.gov
- B09_Amendment_01_GRCA257282_CD_Specifications_June2025_01.pdf: not summarized: open it on SAM.gov
- B09_Amendment_01_RCA257282_Access_Road_100P_Final_CD_Specifications_01.pdf: not summarized: open it on SAM.gov
- B09_Amendment_09_Answers_to_Questions_0009.pdf: not summarized: open it on SAM.gov
- B09_Amendment_07_Answers_to_Questions_0007.pdf: not summarized: open it on SAM.gov
- B09_Amendment_07_GRCA257282_FinalCD_Addendum_07_0007.pdf: not summarized: open it on SAM.gov
- B09_Amendment_06_GRCA_25782_Site_Visit_Sign_in_Sheet_0006.jpeg: not read (the AI doesn't read this file type yet): open it on SAM.gov
- B09_Amendment_06_B08_Att_13_Solit_PSP_Vol_II_SubKPlan_0006.docx: not summarized: open it on SAM.gov
- B09_Amendment_06_GRCA257282_FinalCD_Addendum_06_0006.pdf: not summarized: open it on SAM.gov
- B09_Amendment_06_Answers_to_Questions_0006.pdf: not summarized: open it on SAM.gov
- B09_Amendment_05_Answers_to_Questions_0005.pdf: not summarized: open it on SAM.gov
- B09_Amendment_05_GRCA257282_FinalCD_Addendum_02_SCADA_wSeal_0005.pdf: not summarized: open it on SAM.gov
- B09_Amendment_05_GRCA257282_FinalCD_Addendum_04_0005.pdf: not summarized: open it on SAM.gov
- B09_Amendment_05_GRCA257282_FinalCD_Addendum_05_0005.pdf: not summarized: open it on SAM.gov
- B09_Amendment_05_GRCA_Final_Individual_Specs_0005.zip: not read (the AI doesn't read this file type yet): open it on SAM.gov
- B09_Amendment_03_Answers_to_Questions_0003.pdf: not summarized: open it on SAM.gov
- B09_Amendment_03_GRCA257282_FinalCD_Addendum_03_Compiled_wSeal_0003.pdf: not summarized: open it on SAM.gov
- B09_Amendment_02_What_Evaluators_Will_Ask_for_Each_Factor_2_0002.pdf: not summarized: open it on SAM.gov
- B09_Amendment_02_GRCA_257282_SR_WWTP_PreBid_Mtg_presentation_(8-11-26)_FINAL_0002.pdf: not summarized: open it on SAM.gov
- B09_Amendment_02_GRCA_257282_Precon_SignIn_0002.pdf: not summarized: open it on SAM.gov
- B08_Att_03_GRCA257282_100P_FinalCD_Addendum_1.pdf: not summarized: open it on SAM.gov
- B08_Att_04_GRCA257282_Geotechnical_Recommendation_TM_May2025.pdf: not summarized: open it on SAM.gov
- B08_Att_09_Solit_PSP_Vol_I_PastPerf_REQD.pdf: not summarized: open it on SAM.gov
- B08_Att_10_Solit_PSP_Vol_II_BidBond.pdf: not summarized: open it on SAM.gov
- B08_Att_13_Solit_PSP_Vol_II_SubKPlan_REQD_RELEASED_v2_Mar25.pdf: not summarized: open it on SAM.gov
- B08_Att_08_Solit_PSP_Vol_I_Exp_REQD.pdf: not summarized: open it on SAM.gov
- B08_Att_11_Solit_PSP_Vol_II_Equals.pdf: not summarized: open it on SAM.gov
- B08_Att_12_Solit_PSP_Vol_II_GenRefs.pdf: not summarized: open it on SAM.gov
- B08_Att_07_GRCA_257282_Price_Schedule.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- B09_Amendment_01_GRCA257282_Access_Road_100P_Final_CD_DRAWINGS_01.pdf: not summarized: open it on SAM.gov
- B08_Att_06_Wage_Determination_(1).pdf: not summarized: open it on SAM.gov
- B08_Att_01c_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part3.pdf: not summarized: open it on SAM.gov
- B08_Att_01a_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part1.pdf: not summarized: open it on SAM.gov
- B08_Att_01b_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part2.pdf: not summarized: open it on SAM.gov
- B08_Att_01d_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part4.pdf: not summarized: open it on SAM.gov
- B08_Att_01e_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part5_1.pdf: not summarized: open it on SAM.gov
- B08_Att_01e_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part5.pdf: not summarized: open it on SAM.gov
- B08_Att_05_Hazardous_Materials_Investigation_Report_South_Rim_WWTP.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Build a new 0.65 MGD membrane bioreactor wastewater treatment plant at the existing South Rim plant site, with utility connections, site power, electrical, instrumentation and controls, support buildings and process systems
- Demolish and remove the existing plant after the Government accepts the new one; the old plant stays in operation by NPS staff until then
- Build a compost facility (CLIN 0020) and improve and extend the access road to the facility (CLIN 0040)
- Start up and commission the plant, train operators, and give a 12-month operational support period (CLIN 0030)
- Site work: grading, paving, fencing and relocating existing storage
- Two priced options: Option A radon gas testing and Option B active radon mitigation system
- Protect natural, cultural and historic resources during work in a remote national park location
- Price as firm-fixed-price (FFP: one set price) with a separate schedule of values for each line
- Contract type
- Firm-fixed-price (FFP) construction, 4 base lump-sum lines plus 2 priced options
- Period of performance
- February 1, 2027 to February 1, 2030; complete within 1,095 days after notice to proceed, which is assumed to be February 1, 2027
- Place of performance
- Grand Canyon National Park, South Rim Village, Arizona
- Estimated value
- Magnitude of construction: more than $10,000,000 (the notice's size range, not a price)
- How they'll choose
- Best value tradeoff: the contracting officer weighs technical factors, past performance and price. Non-price factors combined are about equal in importance to price.
- Offers due
- December 18, 2026, 3:00 PM Mountain (from the version posted Nov 10, 2026; amended since)
- How to submit
- Email only, to the contracting officer, the contract specialist and CS_DSC_Proposal_Submission@nps.gov, with the solicitation number, park project number and 'email x of x' in the subject line
- Page limits
- Factor 1 technical experience: 13 pages (prime narrative 8 pages; 5 pages per key subcontractor). Factor 2 technical approach: 8 pages (the schedule chart is not counted). Factor 3 management approach: 5 pages. Email attachments 38 MB each; each email 100 MB.
What they'll judge offers on
- Factor 1: Technical Experience (relevant wastewater plant projects, prime and key subcontractors)
- Factor 2: Technical Approach (construction, commissioning, schedule, risks, resource protection)
- Factor 3: Management Approach (capacity, roles, safety, quality, communication)
- Factor 4: Key Personnel Experience (project manager, construction superintendent, quality control manager, key trades)
- Factor 5: Past Performance
- Factor 6: Small Business Participation
- Price: checked for fairness and reasonableness, with all options added in
What to include when you submit
- Send two volumes as separate email attachments: Volume I (technical proposal) and Volume II (business and price proposal)
- Factor 1: up to five relevant projects completed in the last eight years for the prime firm, with value, dates, role, owner contact, and schedule and budget adherence for each
- Factor 1: each key subcontractor doing most of the treatment process and civil work sends a 5-page narrative with up to three projects from the last five years
- Factor 1: prime experience counts only as a general contractor managing multiple subcontractors while self-performing at least 40% of the contract cost, excluding materials
- Factor 2: a project-specific critical path schedule that shows completion assuming notice to proceed on February 1, 2027, with float and seasonal limits
- Factor 4: resumes for the project manager, construction superintendent and quality control manager, and the firms for the four key trades (process, mechanical/plumbing, electrical, civil)
- Factor 5: send each reference a Past Performance Questionnaire (PPQ), include copies in Volume I, and add a narrative on any less-than-satisfactory past performance; a CPARS evaluation may replace the PPQ
- Factor 6: all bidders send small business participation documentation; small business primes get the maximum credit
- Volume II: signed SF 1442, acknowledgment of every amendment, Section B price schedule with a schedule of values for each line, SF 24 bid bond (or other bid guarantee), Section K representations, and the General References form
- Large businesses must also send a small business subcontracting plan
- Questions go by email to the contracting officer and contract specialist only
After award, you must have
- Performance and payment bonds after award, in the time stated in the offer (the clause 52.228-15 is incorporated; the amounts were not in the text read) From B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf:
…from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the…
Not in the notice text
- Most of the solicitation text, 9 amendments' answers to questions, the drawings, specifications and the price schedule were attached but not read; check them on SAM.gov.
- Whether the September 16, 2026 site visit was required is in the site visit section that was left out of the text read here.
- The Davis-Bacon wage determination (Attachment 06) is attached but not read, so the wage rates are unconfirmed; the clause on construction wage rates is listed.
- Bonding amounts and the bid guarantee amount are not in the text read.
- The new response due date, the question timeline and the conformed specifications are promised in a later amendment.
- The Government's detailed estimate beyond 'more than $10,000,000' is not given.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 10, 2026
- Notice type
- Solicitation
- Office
- DSC Contracting Services Division, Denver, CO
- Product/service code
- Y1ND · Construction of Sewage and Waste Facilities
- Business type
- Energy, fuel & utilities (FedReady's grouping, from NAICS 221320)
- Versions
12 versions have been posted, newest first.
- Nov 16, 2026 · Amendment 0009Due Dec 18, 2026
- Nov 10, 2026 · Amendment 0008 (this version)Due Dec 18, 2026 (changed)
- Oct 28, 2026 · Amendment 0007Due Nov 18, 2026
- Oct 27, 2026 · Amendment 0006Due Nov 18, 2026
- Oct 16, 2026 · Amendment 0005Due Nov 18, 2026 (changed)
- Sep 18, 2026 · Amendment 0004Due Nov 2, 2026
- Sep 3, 2026 · Amendment 0003Due Nov 2, 2026
- Sep 2, 2026 · Amendment 0002Due Nov 2, 2026
- Aug 11, 2026 · Amendment 0001Due Nov 2, 2026
- Aug 7, 2026 · SolicitationDue Nov 2, 2026
- Aug 1, 2026 · Special NoticeDate Nov 2, 2026
- Jul 31, 2026 · SolicitationDue Nov 2, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- Operations and Maintenance (O&M) Services for the SBIWTPThe International Boundary and Water Commission: US-Mexico (USIBWC) wants a contractor to operate and maintain the South Bay International Wastewater Treatment Plant (SBIWTP) in…
- Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant UpgradesSolicitation 6973GH-27-R-00005 is a total small business set-aside: only small businesses can bid.
- Rosebud Lift Station ConstructionThe Indian Health Service (IHS), Division of Engineering Services in Seattle, wants a contractor under solicitation 75H70127R00007 to remove and replace the sewage lift station…
- Wilson Lake Sewage Lagoon Project (Minooka and Lucas Parks), USACE Kansas CityThe U.S. Army Corps of Engineers, Kansas City District, plans a total small business set-aside invitation for bid (IFB: a sealed-bid solicitation) for sewer upgrades at Minooka…