Solicitation
Operations and Maintenance (O&M) Services for the SBIWTP
International Boundary and Water Commission: US-Mexico
AI summary Beta
This summary may miss requirements: 28 of 40 attachments weren't read (Attch. 34 SBIWTP O&M Site Visit oct14_26.pdf, Attch. 33 O&M Services Price Workbook (blank template).xls and 26 more). Check the attachments on SAM.gov.
The International Boundary and Water Commission: US-Mexico (USIBWC) wants a contractor to operate and maintain the South Bay International Wastewater Treatment Plant (SBIWTP) in the San Diego area, solicitation 191BWC26R0009. No set-aside is used. The response due date is January 6, 2027, 2:00 PM Mountain. The firm-fixed-price (FFP: one set price, whatever the work costs) contract runs one base year from June 1, 2027, plus four one-year options.
Who can bid (4)
- At least 5 relevant U.S. contracts for comparable plants (Class V under California rules) and five Past Performance Questionnaires From 191BWC26R0009-0003.pdf
- Request SharePoint access by January 4, 2027 to upload a proposal From 191BWC26R0009-0003.pdf
- Sign a non-disclosure agreement (NDA) and request SharePoint access to see the controlled unclassified information (CUI) documents
Show all 4Show fewer
- Key personnel named in the proposal with resumes, an organizational chart and a plant staffing plan From 191BWC26R0009-0003.pdf
How to submit: Upload to the USIBWC's secure Microsoft SharePoint site only; request access by email to the contracting officer; email, fax, mailed or hand-delivered proposals are not accepted. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
From the version posted Nov 18, 2026.
- Serious: Five relevant U.S. contracts and five questionnaires required. A business needs at least five relevant U.S. plant contracts of its own; a subcontractor's experience does not stand in for the prime's. Failing to provide questionnaires is rated negatively. From 191BWC26R0009-0003.pdf
- Worth checking: Proposals go in only through SharePoint, with a separate access deadline. Access requests are due January 4, 2027, only two requests per vendor are honored, and late uploads are not accepted. From 191BWC26R0009-0003.pdf
- Worth checking: Controlled documents need access and a non-disclosure agreement. Some solicitation documents (the O&M manual, security plan and others) are marked CUI and come only through controlled links.
Show all 8Show fewer
- Worth checking: Plant expansion work continues during the contract. Construction by a separate design-build team runs through the contract term, and the O&M contractor must coordinate shutdowns, tie-ins and commissioning. New O&M duties are added by contract modification. From FY27 SBIWTP OM PWS REV 1 10.19.26.pdf
- Worth checking: Flows from Mexico are unpredictable, including zero flow. The plant may see heavy debris, spills and days with no influent. Extra costs go through the contract modification request process. From FY27 SBIWTP OM PWS REV 1 10.19.26.pdf
- Worth checking: Background investigation for every worker, forms due within two calendar days. Each contract employee must return background forms and a fingerprint card within two calendar days of contacting the security office, and attend PIV card (federal ID card) appointments. From Attch. 27 SD.I.10031-M-2 Background Investigation Procedures for SBIWTP Contractor Personnel.pdf
- Minor: Questions were due Oct 7, 2026. Check the amendments for the agency's answers. From 191BWC26R0009-0003.pdf
- Minor: The site visit was Oct 14, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From 191BWC26R0009-0003.pdf
Read from the notice and 12 attachments. 28 of 40 not read. Show which files.
- 191BWC26R0009-0003.pdf (read)
- 191BWC26R0009 0002.pdf (read)
- 191BWC26R0009 0001.pdf (read)
- 191BWC26R0009 OM SBIWTP Services.pdf (read)
- FY27 SBIWTP OM PWS REV 1 10.19.26.pdf (read)
- Attah. 01 PWS SBIWTP O&M Services.pdf (read)
- Attch. 19 SOO_V2_06192018.pdf (read)
- Attch. 30.c. FSP ANNEX D ANNUAL SBIWTP(2026).pdf (read)
- Attch. 28 Temporary_Dewatering_Narrative.pdf (read)
- Attch. 30.b. FSP ANNEX D MONTHLY SBIWTP (2026).pdf (read)
- Attch. 30.a. FSP ANNEX A SBIWTP (2026).pdf (read)
- Attch. 27 SD.I.10031-M-2 Background Investigation Procedures for SBIWTP Contractor Personnel.pdf (read)
- Attch. 34 SBIWTP O&M Site Visit oct14_26.pdf: not summarized: open it on SAM.gov
- Attch. 33 O&M Services Price Workbook (blank template).xls: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 17 SBIWTP Map.pdf: not summarized: open it on SAM.gov
- Attch. 04 Order No. R9-2021-0001 as amended R9-2026-0005.pdf: not summarized: open it on SAM.gov
- Attch. 20 SOUTH BAY SPILL PREVENTION AND RESPONSE PLAN October 2024.pdf: not summarized: open it on SAM.gov
- Attch. 15 NIST.SP.800-171r3.pdf: not summarized: open it on SAM.gov
- Attch. 24 OEP-SBIWTP(2026).pdf: not summarized: open it on SAM.gov
- Attch. 22 MX- Norma004_Semarnat_2002_english version.pdf: not summarized: open it on SAM.gov
- Attch. 10 Monthly Chemical Dosage 2025 to 2026.pdf: not summarized: open it on SAM.gov
- Attch. 04.a. GiantKelpVariance_09.11.26.pdf: not summarized: open it on SAM.gov
- Attch. 09 SBIWTP Capital Project List as of September 2025.pdf: not summarized: open it on SAM.gov
- Attch. 08 IBWC SBIWTP - Asset Maintenance Schedule.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 23 LAB SAMPLING QTY.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 06 IBWC SBIWTP Asset Registry 2024.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 02 FY26 SBIWTP O&M QASP.pdf: not summarized: open it on SAM.gov
- Attch. 18 NIST.FIPS.199.pdf: not summarized: open it on SAM.gov
- Attch. 05 List-of-Permits.pdf: not summarized: open it on SAM.gov
- Attch. 11 Canyon Collector Daily Inspection template- MAR 2025.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 25 Client Authorization Letter.docx: not summarized: open it on SAM.gov
- Attch. 05 List-of-Permits.docx: not summarized: open it on SAM.gov
- Attch. 02 FY26 SBIWTP O&M QASP.docx: not summarized: open it on SAM.gov
- Attch. 16 Plans Drawings Request Instructions.docx: not summarized: open it on SAM.gov
- Attch. 29 Screw Press Map and Drawings.pdf: not summarized: open it on SAM.gov
- Attch. 07 FY26 IBWC Condition Assessment Report.pdf: not summarized: open it on SAM.gov
- Attch. 12 2025 NPDES ANNUAL BIOSOLIDS REPORT.pdf: not summarized: open it on SAM.gov
- Attch. 26 Past Performance Questionnaire.pdf: not summarized: open it on SAM.gov
- Attch. 01A SOM SUBMITTAL REGISTER SBIWTP O&M 2026.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 21 Wage Determinations CA20240001 07.26.2024.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Run and maintain the whole SBIWTP: the plant, five canyon collectors (diversion structures catching border flows), two pump stations, two junction boxes and the land and ocean outfall lines
- Operate the plant's controls system (SCADA) and meet the monitoring and reporting duties under the plant's discharge permit (NPDES permit, issued by the California Regional Water Quality Control Board)
- Do preventive maintenance and repairs on plant equipment, including extra upkeep when heavy rain or debris hits the headworks screens
- Work with the Government's design-build team (PDB: progressive design-build) building the plant expansion from 25 to 50 million gallons per day (MGD), including shutdown plans and equipment commissioning
- Be ready to respond to spills, border flow events and periods of zero influent flow
- Meet security, background investigation, quality management and safety requirements
- Send the reports listed in the submittal register (Attachment 01A)
- Contract type
- Firm-fixed-price (FFP); Request for Proposals (RFP); a rated order under the Defense Priorities and Allocations System
- Period of performance
- Base year June 1, 2027 to May 31, 2028, then four option years running to May 31, 2032 (5 years in all). Each year has two line items, 25MGD and 10MGD, each QTY 12.0 EA.
- Place of performance
- South Bay International Wastewater Treatment Plant, 2995 Clearwater Way, San Diego, California (SAM.gov lists San Ysidro, CA)
- Estimated value
- Not stated
- How they'll choose
- Technical proposals are rated first (Exceptional, Good, Acceptable, Marginal, Unacceptable); the price of the highest technically rated offeror is then checked to be fair and reasonable, and if it is not, the next one is checked
- Offers due
- January 6, 2027, 2:00 PM Mountain (MST)
- How to submit
- Upload to the USIBWC's secure Microsoft SharePoint site only; request access by email to the contracting officer; email, fax, mailed or hand-delivered proposals are not accepted
What they'll judge offers on
- Factor 3: relevant company experience, at least 5 relevant U.S. contracts for plants of Class V under the California Code of Regulations (Title 23, Division 3, Chapter 26); similar in magnitude means priced at 85% of the estimated cost and above
- Factor 4: key personnel resumes, organizational chart and plant staffing plan
- Factor 7: past performance, five Past Performance Questionnaires (PPQs: forms past customers fill in)
- Factors 2 and 6: also take in extra relevant plant experience from outside the U.S. (no more than three such projects); they can only raise a rating
- Price: checked for fairness; the names of Factors 1 and 5 are in the part of the solicitation not read
What to include when you submit
- Request SharePoint access by email to Philip.johnson@ibwc.gov with the company name, the authorized representative, the uploader's email and a contact phone number; requests are due no later than 1/4/2027 at 12:00 PM MDT
- Only two access requests per vendor will be honored; the SharePoint link must not be shared
- Send two volumes as separate PDF files named [OfferorName]_Vol_[I/II]_[ProposalType].pdf: Volume I Technical Proposal, Volume II Pricing and Business Proposal
- Keep cost or price information out of the technical volume
- Show at least 5 relevant U.S. contracts under Factor 3 and send five Past Performance Questionnaires under Factor 7; document that the questionnaire requests were sent
- A subcontractor's experience does not replace the prime's minimum of five contracts
- For a new joint venture, either all members together show 5 relevant contracts, or one member alone shows 5 U.S. contracts; explain the benefit to the Government, each partner's role, which company employs each key person, and how partners share project management
- For a joint venture, include the Joint Venture Agreement as an appendix to the proposal
- Outside-U.S. plant experience is optional, limited to three projects, and must compare the foreign permit and regulatory rules to those of this project
- Fill in the contractor's contract administrator (name, address, telephone, email) in provision L.03
- Acknowledge all amendments
After award, you must have
- All contractor personnel at the plant must meet USIBWC background investigation rules From Attch. 27 SD.I.10031-M-2 Background Investigation Procedures for SBIWTP Contractor Personnel.pdf:
Treatment Plant (SBIWTP) are required to meet the background investigation…
Current contractor
No incumbent is named. The PWS says an incumbent contractor must support transition during the last 60 days of the contract; no previous contract number is given.
Not in the notice text
- The full Section L and Section M (page limits for each volume, Factors 1, 2, 5 and 6, and the price proposal instructions) are in parts of the solicitation not read; the SF 33 shows Section L on pages 18-26 and Section M on pages 27-38
- The key personnel requirements in PWS section 4.2 and the security requirements in section 4.6 were not read
- Attached but not read: the NPDES permit, condition assessment report, QASP, asset registry, wage determination CA20240001, price workbook (Attachment 33), Past Performance Questionnaire (Attachment 26), site visit file (Attachment 34) and others
- Amendment 0002's question-and-answer text could not be read
- No dollar value is given for the contract
- The wage determination (CA20240001) is attached but was not read, so the Service Contract Labor Standards wage rates are not confirmed
- Whether a bid bond or other bonding is required is not stated in the text read
Notice details
Notice type, codes, versions and files
- Posted
- Nov 18, 2026
- Notice type
- Solicitation
- Office
- Internat. Boundary and Water Comm., El Paso, TX
- Product/service code
- M1ND · Operation of Sewage and Waste Facilities
- Business type
- Energy, fuel & utilities (FedReady's grouping, from NAICS 221320)
- Versions
4 versions have been posted, newest first.
- Nov 18, 2026 · Amendment 0001 (this version)Due Jan 6, 2027
- Nov 13, 2026 · AmendmentDue Jan 6, 2027
- Oct 20, 2026 · AmendmentDue Jan 6, 2027
- Sep 25, 2026 · SolicitationDue Jan 6, 2027
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- GRCA 257282 - Replace Wastewater Plant at South RiSolicitation 140P2026R0101: the National Park Service (Denver Service Center) wants a contractor to build a new wastewater treatment plant at the South Rim Village, Grand Canyon…