Solicitation
Operations and Maintenance (O&M) Services for the SBIWTP
International Boundary and Water Commission: US-Mexico
A newer version of this notice was posted Nov 18, 2026. See the latest version.
AI summary Beta
Summary of the version posted Nov 13, 2026. The notice was amended Nov 18, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 27 of 39 attachments weren't read (Attch. 34 SBIWTP O&M Site Visit oct14_26.pdf, Attch. 33 O&M Services Price Workbook (blank template).xls and 25 more). Check the attachments on SAM.gov.
INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO (IBWC) wants a contractor to run and maintain the South Bay International Wastewater Treatment Plant near San Ysidro, California, under request for proposals (RFP) 191BWC26R0009. No set-aside is used. The response due date is January 6, 2027, 2:00 PM Mountain. Work is firm-fixed-price (FFP: one set price) for a base year starting June 1, 2027, plus four option years.
Who can bid
- Experience operating and maintaining wastewater treatment plants of 25 million gallons per day or greater, with contracts similar in scope and magnitude (priced at 85% of the estimated cost and above) From 191BWC26R0009 OM SBIWTP Services.pdf
- Request SharePoint access and sign a nondisclosure agreement (NDA) to see the controlled unclassified information (CUI) attachments, including the O&M manual and security plan
Things to watch (7)
- Serious: Large-plant experience needed to score well. Past contracts count as similar in size only if they cover plants of 25 million gallons per day or more, and similar in magnitude only at 85% or more of the estimated cost, which is hard for a small business to show. From 191BWC26R0009 OM SBIWTP Services.pdf
- Worth checking: Controlled documents need access request and NDA. The O&M manual and security plan are controlled unclassified information; you must request access and sign a nondisclosure agreement before you can read them and price the work.
- Worth checking: Irrevocable letter of credit clause listed. The clause list includes an irrevocable letter of credit clause; the section that says whether a bidder must supply one was not in the text read here, so check the full solicitation. From 191BWC26R0009 OM SBIWTP Services.pdf
Show all 7Show fewer
- Worth checking: Plant is being expanded during the contract. Construction by a separate design-build team runs through 2030, and new requirements will come through contract changes, so scope and workload can shift. From FY27 SBIWTP OM PWS REV 1 10.19.26.pdf
- Worth checking: Zero-flow and border flow conditions. Flows come from Mexico and can stop for days or surge; the contractor must keep the biological process stable and request pay through a contract modification process. From FY27 SBIWTP OM PWS REV 1 10.19.26.pdf
- Minor: The site visit was Oct 14, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From 191BWC26R0009 0001.pdf
- Minor: Two addresses for the plant. The background section gives 2995 Clearwater Way and the place of performance paragraph gives 2995 Dairy Mart Road; confirm the site address with the contracting officer. From FY27 SBIWTP OM PWS REV 1 10.19.26.pdf
Read from the notice and 12 attachments. 27 of 39 not read. Show which files.
- 191BWC26R0009 0002.pdf (read)
- 191BWC26R0009 0001.pdf (read)
- 191BWC26R0009 OM SBIWTP Services.pdf (read)
- FY27 SBIWTP OM PWS REV 1 10.19.26.pdf (read)
- Attah. 01 PWS SBIWTP O&M Services.pdf (read)
- Attch. 19 SOO_V2_06192018.pdf (read)
- Attch. 27 SD.I.10031-M-2 Background Investigation Procedures for SBIWTP Contractor Personnel.pdf (read)
- Attch. 28 Temporary_Dewatering_Narrative.pdf (read)
- Attch. 30.b. FSP ANNEX D MONTHLY SBIWTP (2026).pdf (read)
- Attch. 30.a. FSP ANNEX A SBIWTP (2026).pdf (read)
- Attch. 30.c. FSP ANNEX D ANNUAL SBIWTP(2026).pdf (read)
- Attch. 04 Order No. R9-2021-0001 as amended R9-2026-0005.pdf (read)
- Attch. 34 SBIWTP O&M Site Visit oct14_26.pdf: not summarized: open it on SAM.gov
- Attch. 33 O&M Services Price Workbook (blank template).xls: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 17 SBIWTP Map.pdf: not read (it couldn't be opened): open it on SAM.gov
- Attch. 20 SOUTH BAY SPILL PREVENTION AND RESPONSE PLAN October 2024.pdf: not summarized: open it on SAM.gov
- Attch. 15 NIST.SP.800-171r3.pdf: not summarized: open it on SAM.gov
- Attch. 24 OEP-SBIWTP(2026).pdf: not summarized: open it on SAM.gov
- Attch. 22 MX- Norma004_Semarnat_2002_english version.pdf: not summarized: open it on SAM.gov
- Attch. 10 Monthly Chemical Dosage 2025 to 2026.pdf: not summarized: open it on SAM.gov
- Attch. 04.a. GiantKelpVariance_09.11.26.pdf: not summarized: open it on SAM.gov
- Attch. 09 SBIWTP Capital Project List as of September 2025.pdf: not summarized: open it on SAM.gov
- Attch. 08 IBWC SBIWTP - Asset Maintenance Schedule.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 23 LAB SAMPLING QTY.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 06 IBWC SBIWTP Asset Registry 2024.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 02 FY26 SBIWTP O&M QASP.pdf: not summarized: open it on SAM.gov
- Attch. 18 NIST.FIPS.199.pdf: not summarized: open it on SAM.gov
- Attch. 05 List-of-Permits.pdf: not summarized: open it on SAM.gov
- Attch. 11 Canyon Collector Daily Inspection template- MAR 2025.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 25 Client Authorization Letter.docx: not summarized: open it on SAM.gov
- Attch. 02 FY26 SBIWTP O&M QASP.docx: not summarized: open it on SAM.gov
- Attch. 05 List-of-Permits.docx: not summarized: open it on SAM.gov
- Attch. 16 Plans Drawings Request Instructions.docx: not summarized: open it on SAM.gov
- Attch. 29 Screw Press Map and Drawings.pdf: not summarized: open it on SAM.gov
- Attch. 07 FY26 IBWC Condition Assessment Report.pdf: not summarized: open it on SAM.gov
- Attch. 12 2025 NPDES ANNUAL BIOSOLIDS REPORT.pdf: not summarized: open it on SAM.gov
- Attch. 26 Past Performance Questionnaire.pdf: not summarized: open it on SAM.gov
- Attch. 01A SOM SUBMITTAL REGISTER SBIWTP O&M 2026.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 21 Wage Determinations CA20240001 07.26.2024.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Full operation and maintenance (O&M) of the plant, its five canyon collectors (diversion structures), two pump stations, two junction boxes and the land and ocean outfalls
- Routine O&M for 25 million gallons per day (MGD) of treatment, plus a second priced line for the added 10 MGD (35 MGD in total today)
- Monitoring and reporting under the plant's discharge permit (NPDES: the federal wastewater discharge permit), and coordination with labs and regulators
- Ongoing coordination with the design-build team that is expanding the plant to 50 MGD, including shutdown reviews and commissioning support
- Plans for spills, border flow events and periods of zero incoming flow
- 60-day phase-in and transition from the current contractor; a Transition Plan is due within 15 calendar days of award
- Pricing: 10 firm-fixed-price lines, each QTY 12.0 EA (base year and four option years, each for 25 MGD and for 10 MGD)
- Background investigations for all contractor staff, safety plans and a quality control program
- Contract type
- Firm-fixed-price (FFP)
- Period of performance
- Base year June 1, 2027 to May 31, 2028, plus four option years through May 31, 2032 (about 5 years in all)
- Place of performance
- San Ysidro, CA, USA (SAM.gov). The work statement places the plant at 2995 Dairy Mart Road, San Diego, CA 92154.
- Estimated value
- Not stated
- How they'll choose
- Best-rated technical offer first: offers get adjectival ratings, then the price of the highest technically rated offeror is checked for being fair and reasonable. No price trade-offs are made.
- Offers due
- January 6, 2027, 2:00 PM Mountain (from the version posted Nov 13, 2026; amended since)
What they'll judge offers on
- Factor 1: relevant past contracts, judged on size, scope, magnitude and complexity
- Factor 2: past performance, supported by past performance questionnaires
- Price: checked only for fairness and reasonableness, for the highest technically rated offeror
What to include when you submit
- Send relevant past contracts for Factor 1 and past performance questionnaires for Factor 2 (Amendment 0002's answers say a minimum of five of each, for comparable plants inside the United States)
- Each project submission names the entity that did the work, its role and duties, and how the work relates to this requirement (per Amendment 0002's answers)
- A joint venture must show each member's relevant contracts and questionnaires; a subcontractor's experience does not replace the minimum five contracts (per Amendment 0002's answers)
- Acknowledge each amendment and complete the price workbook (Attachment 33, blank template attached but not read)
- To see controlled unclassified information (CUI) documents, request SharePoint access and sign a nondisclosure agreement
After award, you must have
- All contractor personnel at the plant must pass the IBWC's background investigation requirements From Attch. 27 SD.I.10031-M-2 Background Investigation Procedures for SBIWTP Contractor Personnel.pdf:
All Contractor personnel working at the South Bay International Wastewater…
Current contractor
No incumbent is named. The work statement says the incumbent contractor keeps full responsibility for plant operations during a 60-day phase-in, so a current contractor exists.
Not in the notice text
- Most of Sections L (proposal instructions) and M (evaluation) were not in the text read here, so page limits, file formats, how to submit and the factor order are unconfirmed; check them on SAM.gov.
- Amendment 0002's questions and answers couldn't be fully read here; check them on SAM.gov for the experience minimums and joint venture rules.
- Key staff requirements (work statement section 4.2) and certification or license needs are in the part of the work statement that was not read.
- Attached but not read: the quality assurance surveillance plan, wage determination CA20240001, past performance questionnaire, price workbook, permit list, condition assessment and the October 14, 2026 site visit file.
- Whether the October 14, 2026 site visit is required, and the question deadline, are not stated in the text read.
- The Service Contract Labor Standards clause is listed and a wage determination is attached but not read, so the wage rates are unconfirmed.
- No dollar estimate for the contract is given.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 13, 2026
- Notice type
- Solicitation
- Office
- Internat. Boundary and Water Comm., El Paso, TX
- Product/service code
- M1ND · Operation of Sewage and Waste Facilities
- Business type
- Energy, fuel & utilities (FedReady's grouping, from NAICS 221320)
- Versions
4 versions have been posted, newest first.
- Nov 18, 2026 · AmendmentDue Jan 6, 2027
- Nov 13, 2026 · Amendment 0001 (this version)Due Jan 6, 2027
- Oct 20, 2026 · AmendmentDue Jan 6, 2027
- Sep 25, 2026 · SolicitationDue Jan 6, 2027
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- GRCA 257282 - Replace Wastewater Plant at South RiSolicitation 140P2026R0101: the National Park Service (Denver Service Center) wants a contractor to build a new wastewater treatment plant at the South Rim Village, Grand Canyon…
- IDIQ | Deionization Water System Maintenance and SupportThe Department of Veterans Affairs Network Contract Office 4 wants maintenance and support for the deionized (DI) and reverse osmosis (RO) water system at the Erie VA Medical…