Summary of the version posted Sep 25, 2026. The notice was amended Nov 18, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 16 of 28 attachments weren't read (Attch. 17 SBIWTP Map.pdf, Attch. 10 Monthly Chemical Dosage 2025 to 2026.pdf and 14 more). Check the attachments on SAM.gov.
The U.S. Section of the International Boundary and Water Commission (USIBWC) wants one contractor to run and maintain the South Bay International Wastewater Treatment Plant near San Ysidro / San Diego, California, which treats sewage coming from Tijuana, Mexico. It is a firm-fixed-price contract with a base year starting June 1, 2027 and four option years, and no small business set-aside. The plant is being expanded by a separate construction team while it keeps running, so the contractor must work around that construction.
Who can bid
- Relevant experience is judged on size, scope and magnitude: O&M of a wastewater treatment plant of 25 MGD or greater, with similar treatment processes, on contracts priced at about 85% or more of this one From 191BWC26R0009 OM SBIWTP Services.pdf
- Open competition: SAM.gov shows no set-aside for this notice
- Security documents are part of the package (a System Security Plan and NIST standards), so expect cybersecurity and personnel security rules for the plant's control systems From Attah. 01 PWS SBIWTP O&M Services.pdf
Things to watch (8)
- Serious: Very large, specialized plant. Past work is measured against plants of 25 MGD or more, which makes this hard for a small business without comparable operating history or a strong teaming partner. From 191BWC26R0009 OM SBIWTP Services.pdf
- Serious: Unpredictable flows and no-flow periods. Sewage arrives from Mexico in unknown quality and volume, including storm debris and possible multi-day zero flow, and extra costs must be claimed through contract modifications. From Attah. 01 PWS SBIWTP O&M Services.pdf
- Worth checking: Plant is under active expansion. A separate design-build team is building new facilities while you operate the plant, so you must coordinate shutdowns and tie-ins, and scope will change by modification. From Attah. 01 PWS SBIWTP O&M Services.pdf
Show all 8Show fewer
- Worth checking: Aging plant with limited redundancy. Parts of the plant cannot be taken offline for maintenance while running, and a capital project list shows repeated emergency cleanouts and rehabs, which raises cost and risk under a fixed price. From Attah. 01 PWS SBIWTP O&M Services.pdf
- Worth checking: Permit liability and compliance pressure. The government keeps legal liability for permit actions, but the contractor can still be held responsible for gross negligence, willful misconduct or failing its contract duties. From Attah. 01 PWS SBIWTP O&M Services.pdf
- Worth checking: Large repair work needs quotes and approval. Over-and-above work needs a written work request, and any single item over $200,000 needs three competing vendor quotes; routine repairs stay inside the fixed price. From Attah. 01 PWS SBIWTP O&M Services.pdf
- Worth checking: Past performance questionnaires required. Missing questionnaires are scored against you, so you need references lined up early. From 191BWC26R0009 OM SBIWTP Services.pdf
- Minor: Labor rules affect pricing. Service Contract Labor Standards apply, so labor pricing must follow the attached wage determination (not provided in the readable text). From 191BWC26R0009 OM SBIWTP Services.pdf
Read from the notice and 12 attachments. 16 of 28 not read. Show which files.
- 191BWC26R0009 OM SBIWTP Services.pdf (read)
- Attah. 01 PWS SBIWTP O&M Services.pdf (read)
- Attch. 19 SOO_V2_06192018.pdf (read)
- Attch. 04 Order No. R9-2021-0001 as amended R9-2026-0005.pdf (read)
- Attch. 20 SOUTH BAY SPILL PREVENTION AND RESPONSE PLAN October 2024.pdf (read)
- Attch. 15 NIST.SP.800-171r3.pdf (read)
- Attch. 24 OEP-SBIWTP(2026).pdf (read)
- Attch. 22 MX- Norma004_Semarnat_2002_english version.pdf (read)
- Attch. 04.a. GiantKelpVariance_09.11.26.pdf (read)
- Attch. 09 SBIWTP Capital Project List as of September 2025.pdf (read)
- Attch. 02 FY26 SBIWTP O&M QASP.pdf (read)
- Attch. 18 NIST.FIPS.199.pdf (read)
- Attch. 17 SBIWTP Map.pdf: not read (it couldn't be opened): open it on SAM.gov
- Attch. 10 Monthly Chemical Dosage 2025 to 2026.pdf: not summarized: open it on SAM.gov
- Attch. 08 IBWC SBIWTP - Asset Maintenance Schedule.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 23 LAB SAMPLING QTY.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 06 IBWC SBIWTP Asset Registry 2024.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 05 List-of-Permits.pdf: not summarized: open it on SAM.gov
- Attch. 11 Canyon Collector Daily Inspection template- MAR 2025.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 25 Client Authorization Letter.docx: not summarized: open it on SAM.gov
- Attch. 02 FY26 SBIWTP O&M QASP.docx: not summarized: open it on SAM.gov
- Attch. 05 List-of-Permits.docx: not summarized: open it on SAM.gov
- Attch. 16 Plans Drawings Request Instructions.docx: not summarized: open it on SAM.gov
- Attch. 07 FY26 IBWC Condition Assessment Report.pdf: not summarized: open it on SAM.gov
- Attch. 12 2025 NPDES ANNUAL BIOSOLIDS REPORT.pdf: not summarized: open it on SAM.gov
- Attch. 26 Past Performance Questionnaire.pdf: not summarized: open it on SAM.gov
- Attch. 01A SOM SUBMITTAL REGISTER SBIWTP O&M 2026.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 21 Wage Determinations CA20240001 07.26.2024.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Run and maintain the whole plant and related facilities: the plant, five canyon collectors, two pump stations, two junction boxes, and the land and ocean outfalls (the ocean outfall drop shaft, tunnel and riser are excluded)
- Support the plant's discharge permit (NPDES) through diligent operations, monitoring and reporting; the contractor is responsible for the facility monitoring and reporting, not ocean receiving water monitoring
- Preventive and corrective maintenance and repair, including keeping the Preventative Maintenance Plan up to date for the temporary equipment and key process areas
- Operate the plant's SCADA (control and monitoring) system
- Run the lab sampling and regulatory agency coordination described in PWS Section B
- Be ready at all times to carry out the Spill and Transboundary Flow Event Prevention and Response Plan
- Work closely with the design-build team on the 25 to 50 MGD expansion: answer questions, attend meetings, review shutdown plans, join commissioning, and help with tie-ins
- Program management: key staff, quality management, security, safety, incident reporting, and records
- Contract type
- Firm-fixed-price, negotiated RFP on an SF 33. Ten line items: each contract year has one line for the 25 MGD portion and one for the 10 MGD portion (12 monthly units each).
- Period of performance
- 1 base year (June 1, 2027 to May 31, 2028) + 4 one-year options, running through May 31, 2032
- Place of performance
- South Bay International Wastewater Treatment Plant, 2995 Clearwater Way, San Diego (San Ysidro), California
- Estimated value
- Not stated
- How they'll choose
- Appears to be technical rating first, then a fair-and-reasonable price check on the highest technically rated offeror. Proposals get adjectival ratings (Exceptional, Good, Acceptable, Marginal, Unacceptable). The full Section M factor list was in a part of the solicitation that was not available, so confirm it.
- Offers due
- January 6, 2027 at 2:00 PM Mountain Time per the SAM.gov listing (14:00 -07:00); the SF 33 form itself reads 02:00 MT (from the version posted Sep 25, 2026; amended since)
What they'll judge offers on
- Technical approach (adjectival rating; any proposal rated Unacceptable overall is dropped)
- Past performance (offerors with no relevant history get Neutral; past performance questionnaires are expected)
- Price (checked for fair and reasonable, starting with the highest technically rated offeror)
What to include when you submit
- Complete and sign the SF 33 offer form (offer acceptance period defaults to 60 calendar days) and acknowledge any amendments
- Price every line item: base year and each option year, separately for the 25 MGD and the 10 MGD portions
- Past performance questionnaires: the solicitation says failing to provide them is rated negatively
- Contracting officer contact on the form: Philip Johnson, johnsonpk@state.gov
- How and where to submit, page limits and proposal volumes are in Section L, which was not in the text provided
Current contractor
A September 2026 San Diego Water Board letter in the attachments calls Veolia USIBWC's contracted operator. The PWS also has a standard clause for an incumbent contractor to help a successor in the last 60 days.
Not in the notice text
- Full evaluation factors, their order of importance, and how price compares with technical rating (Section M was mostly cut from the text)
- How and where to submit the proposal, and any page limits or volume structure (Section L was not in the text)
- Estimated contract value or budget
- Key staff, operator certification, licensing, security or clearance requirements (PWS Sections 4.2 and 4.6 were not in the text)
- Details in unread files: wage determination, list of permits, asset registry, maintenance schedule, condition assessment, deliverables register, lab sample quantities and the past performance questionnaire
- Whether a site visit or pre-proposal conference is planned
Notice details
Notice type, codes, versions and files
- Posted
- Sep 25, 2026
- Notice type
- Solicitation
- Office
- Internat. Boundary and Water Comm., El Paso, TX
- Product/service code
- M1ND · Operation of Sewage and Waste Facilities
- Business type
- Energy, fuel & utilities (FedReady's grouping, from NAICS 221320)
- Versions
4 versions have been posted, newest first.
- Nov 18, 2026 · Amendment 0003Due Jan 6, 2027
- Nov 13, 2026 · Amendment 0002Due Jan 6, 2027
- Oct 20, 2026 · Amendment 0001Due Jan 6, 2027
- Sep 25, 2026 · Solicitation (this version)Due Jan 6, 2027
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- GRCA 257282 - Replace Wastewater Plant at South RiSolicitation 140P2026R0101: the National Park Service (Denver Service Center) wants a contractor to build a new wastewater treatment plant at the South Rim Village, Grand Canyon…
- IDIQ | Deionization Water System Maintenance and SupportThe Department of Veterans Affairs Network Contract Office 4 wants maintenance and support for the deionized (DI) and reverse osmosis (RO) water system at the Erie VA Medical…