Solicitation
Operations and Maintenance (O&M) Services for the SBIWTP
International Boundary and Water Commission: US-Mexico
AI summaryThe International Boundary and Water Commission: US-Mexico wants a contractor to run and maintain the South Bay International Wastewater Treatment Plant (SBIWTP) in San Ysidro, California. The contract is a base year starting June 1, 2027 plus four one-year options, priced as firm-fixed-price (FFP: one set price, whatever the work ends up costing) lines, with no set-aside. The response due date is January 6, 2027, 2:00 PM Mountain Time; this version carries Amendment 0001. More in the summary
AI summary Beta
This summary may miss requirements: 26 of 38 attachments weren't read (Attch. 34 SBIWTP O&M Site Visit oct14_26.pdf, Attch. 33 O&M Services Price Workbook (blank template).xls and 24 more). Check the attachments on SAM.gov.
The International Boundary and Water Commission: US-Mexico wants a contractor to run and maintain the South Bay International Wastewater Treatment Plant (SBIWTP) in San Ysidro, California. The contract is a base year starting June 1, 2027 plus four one-year options, priced as firm-fixed-price (FFP: one set price, whatever the work ends up costing) lines, with no set-aside. The response due date is January 6, 2027, 2:00 PM Mountain Time; this version carries Amendment 0001.
Who can bid
- Request SharePoint access and sign a non-disclosure agreement (NDA) to read the controlled unclassified information (CUI) documents: the O&M manual, system security plan, facility security plan and border crossing access procedure.
Things to watch (8)
From the version posted Oct 20, 2026.
- Serious: Key plant documents are controlled. The O&M manual (1,773 pages), security plans and border crossing procedure are controlled unclassified information, so a bidder needs SharePoint access and a signed NDA before reading them.
- Worth checking: Experience is judged against large plants. Past work counts as similar in size only if it was operating a plant of 25 million gallons per day or more, and similar in magnitude only at 85% of the estimated cost or above.
- Worth checking: Past performance questionnaires are required. A bidder that does not provide the questionnaires is rated negatively on past performance, which can hurt a small firm with few references.
Show all 8Show fewer
- Worth checking: Plant is being expanded during the contract. Construction continues through the term and new operating duties will be added by contract modification, so the scope and cost of the work can change.
- Worth checking: Unpredictable flows and no-flow periods. Rain, debris and periods of zero inflow from Mexico are called routine, and extra cost is recovered only through the contract modification request process.
- Worth checking: Background checks before workers start. No new worker may begin work at the plant until the background investigation and fingerprint check are favorably decided, which can slow staffing at the start.
- Minor: Wage determination applies. A Service Contract Act wage determination (CA20240001) is attached, so labor prices must follow its rates; it was not read here.
- Minor: 60-day phase-in after award. The new contractor must carry out phase-in and transition services over a 60-day period after award.
Read from the notice and 12 attachments. 26 of 38 not read. Show which files.
- 191BWC26R0009 0001.pdf (read)
- 191BWC26R0009 OM SBIWTP Services.pdf (read)
- FY27 SBIWTP OM PWS REV 1 10.19.26.pdf (read)
- Attah. 01 PWS SBIWTP O&M Services.pdf (read)
- Attch. 19 SOO_V2_06192018.pdf (read)
- Attch. 27 SD.I.10031-M-2 Background Investigation Procedures for SBIWTP Contractor Personnel.pdf (read)
- Attch. 30.c. FSP ANNEX D ANNUAL SBIWTP(2026).pdf (read)
- Attch. 30.a. FSP ANNEX A SBIWTP (2026).pdf (read)
- Attch. 30.b. FSP ANNEX D MONTHLY SBIWTP (2026).pdf (read)
- Attch. 28 Temporary_Dewatering_Narrative.pdf (read)
- Attch. 04 Order No. R9-2021-0001 as amended R9-2026-0005.pdf (read)
- Attch. 20 SOUTH BAY SPILL PREVENTION AND RESPONSE PLAN October 2024.pdf (read)
- Attch. 34 SBIWTP O&M Site Visit oct14_26.pdf: not summarized: open it on SAM.gov
- Attch. 33 O&M Services Price Workbook (blank template).xls: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 17 SBIWTP Map.pdf: not read (it couldn't be opened): open it on SAM.gov
- Attch. 15 NIST.SP.800-171r3.pdf: not summarized: open it on SAM.gov
- Attch. 24 OEP-SBIWTP(2026).pdf: not summarized: open it on SAM.gov
- Attch. 22 MX- Norma004_Semarnat_2002_english version.pdf: not summarized: open it on SAM.gov
- Attch. 10 Monthly Chemical Dosage 2025 to 2026.pdf: not summarized: open it on SAM.gov
- Attch. 04.a. GiantKelpVariance_09.11.26.pdf: not summarized: open it on SAM.gov
- Attch. 09 SBIWTP Capital Project List as of September 2025.pdf: not summarized: open it on SAM.gov
- Attch. 08 IBWC SBIWTP - Asset Maintenance Schedule.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 23 LAB SAMPLING QTY.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 06 IBWC SBIWTP Asset Registry 2024.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 02 FY26 SBIWTP O&M QASP.pdf: not summarized: open it on SAM.gov
- Attch. 18 NIST.FIPS.199.pdf: not summarized: open it on SAM.gov
- Attch. 05 List-of-Permits.pdf: not summarized: open it on SAM.gov
- Attch. 11 Canyon Collector Daily Inspection template- MAR 2025.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 25 Client Authorization Letter.docx: not summarized: open it on SAM.gov
- Attch. 02 FY26 SBIWTP O&M QASP.docx: not summarized: open it on SAM.gov
- Attch. 05 List-of-Permits.docx: not summarized: open it on SAM.gov
- Attch. 16 Plans Drawings Request Instructions.docx: not summarized: open it on SAM.gov
- Attch. 29 Screw Press Map and Drawings.pdf: not summarized: open it on SAM.gov
- Attch. 07 FY26 IBWC Condition Assessment Report.pdf: not summarized: open it on SAM.gov
- Attch. 12 2025 NPDES ANNUAL BIOSOLIDS REPORT.pdf: not summarized: open it on SAM.gov
- Attch. 26 Past Performance Questionnaire.pdf: not summarized: open it on SAM.gov
- Attch. 01A SOM SUBMITTAL REGISTER SBIWTP O&M 2026.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attch. 21 Wage Determinations CA20240001 07.26.2024.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Operate and maintain the whole plant and its related facilities, supplying all staff, equipment, tools, materials and supervision (performance work statement, PWS, section 1.1).
- Ten priced lines: for the base year and each of four option years, one line for 25 million gallons per day (MGD) and one for the additional 10 MGD, each shown as 12.0 EA.
- Run the five canyon collectors (structures that catch flow near the border), two pump stations, two junction boxes, and the supervisory control and data acquisition (SCADA) system that monitors and controls the plant.
- Do the monitoring and reporting the plant's discharge permit (a National Pollutant Discharge Elimination System, NPDES, permit) requires; the contractor is not responsible for the ocean receiving water or special study monitoring.
- Perform routine and manufacturer-recommended maintenance and repair, and update the Preventative Maintenance Plan for the headworks screens, grit chamber, tanks and channels.
- Work with the design-build construction team (PCL Construction) during the plant expansion: answer questions, attend meetings, review shutdown plans, join commissioning and tie-ins.
- Carry out phase-in and transition services over 60 days after award.
- Be ready at all times to follow the Spill and Transboundary Flow Event Prevention and Response Plan, and report incidents and illegal border crossings within 24 hours.
- Contract type
- Firm-fixed-price (FFP) lines under a negotiated request for proposals
- Period of performance
- Base year June 1, 2027 to May 31, 2028, plus four one-year options through May 31, 2032; 60-day phase-in and transition after award
- Place of performance
- San Ysidro, CA, USA per SAM.gov. The PWS says all work is at the SBIWTP, its canyon collectors and pump stations, at 2995 Dairy Mart Road, San Diego, CA 92154.
- Estimated value
- Not stated
- How they'll choose
- Technical ratings first; price is then checked for being fair and reasonable for the highest technically rated offeror, moving to the next ranked offeror if that price fails
- Offers due
- January 6, 2027, 2:00 PM Mountain Time
What they'll judge offers on
- Technical factors, rated Exceptional, Good, Acceptable, Marginal or Unacceptable (the factor names are in a part of Section M that was not read)
- Past performance: rated Neutral when a bidder has no relevant history; past performance questionnaires must be provided
- Price: judged only for fairness and reasonableness, for the highest technically rated offeror
What to include when you submit
- Acknowledge Amendment 0001 before the response due date: on the offer form, on each copy of the offer, or by letter or electronic message that names the solicitation and amendment numbers.
- Propose a contract line item number (CLIN: one priced line of the order) mapping matrix, as the PWS asks, using the solicitation's pricing structure attachment.
- Send the past performance questionnaires (Attachment 26); failing to provide them is rated negatively.
- The offer form asks the bidder to sign and to keep the offer open for 60 calendar days unless the bidder inserts a different period.
After award, you must have
- Every worker needs a favorable background investigation and fingerprint check before starting work at the plant, and a federal ID card (PIV card) if they need regular access. From Attch. 27 SD.I.10031-M-2 Background Investigation Procedures for SBIWTP Contractor Personnel.pdf:
…permitted to physically begin work at the SBIWTP prior to the favorable adjudication…
Current contractor
No incumbent is named. The PWS refers to an unnamed incumbent contractor helping a successor at the end of the contract, and the October 2024 spill plan was prepared by Veolia and USIBWC; the documents do not say who operates the plant now.
Not in the notice text
- Attached but not read: the middle of the solicitation (including Section L, the bidder instructions, and the first part of Section M), the quality assurance surveillance plan, wage determination, past performance questionnaire, price workbook, asset lists, and most of the PWS and permit text.
- The controlled unclassified information documents (O&M manual, system security plan, facility security plan, border crossing procedure) are only available through SharePoint access and an NDA.
- How to submit the offer (e-mail, portal or paper) is not shown in the text read; the contact is Philip Johnson, johnsonpk@state.gov.
- The names and weights of the technical evaluation factors, and the required key staff and operator certifications (PWS section 4.2), were not read.
- Whether a bond, letter of credit or insurance is required at offer time: the clause list names Irrevocable Letter of Credit (52.228-14) and Insurance-Work on a Government Installation (52.228-5), but their use is not shown.
- The site visit file (Attachment 34, October 14, 2026) and the question deadline are not shown in the text read; check SAM.gov.
- Two versions of the PWS are posted, the original and Revision 1; check which governs and what changed.
Eligibility and how to respond
- No set-aside: any business, large or small, can bid unless the notice says otherwise.
- How and where to submit is in the notice text and its attachments on SAM.gov.
- Service contracts usually set minimum pay rates (the Service Contract Act). Price the labor with the SCA price calculator.
Notice details
- Posted
- Oct 20, 2026
- Notice type
- Solicitation
- Office
- Internat. Boundary and Water Comm., El Paso, TX
- Product/service code
- M1ND · Operation of Sewage and Waste Facilities
- Business type
- Energy, fuel & utilities (FedReady's grouping, from NAICS 221320)
- Versions
2 versions have been posted, newest first.
- Oct 20, 2026 · Amendment 0001 (this version)Due Jan 6, 2027
- Sep 25, 2026 · SolicitationDue Jan 6, 2027
- Attachments
Past awards and competition
Who has won work like this before, the likely incumbent, and what similar contracts paid, from USAspending.gov.
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- GRCA 257282 - Replace South Rim Wastewater Treatment Plant, Grand Canyon, AZThe National Park Service Denver Service Center plans to hire a contractor to build a new 0.65 million-gallon-per-day membrane bio-reactor wastewater treatment plant at the South…
- GRCA 257282 - Replace Wastewater Plant at South RiThe National Park Service (NPS), through its Denver Service Center, wants a contractor to build a new 0.65 million gallons per day membrane bio-reactor wastewater treatment plant…
- Blanket Purchase Agreement - Cleaning and Maintenance of Sewer SystemsThe U.S. Embassy in Brussels, Belgium, plans a blanket purchase agreement (BPA: a standing agreement for ordering as needed, with no spending commitment) for cleaning and…