Solicitation
GRCA 257282 - Replace Wastewater Plant at South Ri
Department of the Interior · National Park Service
A newer version of this notice was posted Nov 16, 2026. It moves the due date from Nov 2, 2026 to Dec 18, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of the version posted Jul 31, 2026. The notice was amended Nov 16, 2026. The due date moved from Nov 2, 2026 to Dec 18, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 7 of 19 attachments weren't read (B08_Att_07_GRCA_257282_Price_Schedule.xlsx, B08_Att_01c_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part3.pdf and 5 more). Check the attachments on SAM.gov.
The National Park Service (Denver Service Center) wants a construction contractor to replace the wastewater treatment plant at South Rim Village in Grand Canyon National Park, Arizona. The work includes the new plant, a compost facility, operations and maintenance support services and an access road, with two radon options. It is open to all companies (no set-aside), is listed as more than $10 million, and the SF 1442 form shows a performance period of 02/01/2027 to 02/01/2030. The form also says the project is currently unfunded.
Who can bid (6)
- No set-aside: open to all businesses (full and open competition) From B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf
- Bid guarantee (SF 24 bid bond or other suitable guarantee) with the proposal From B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf
- Performance and payment bonds clause is included in the contract; whether bonds are required (SF 1442 block 12a) is not legible in the text provided From B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf
Show all 6Show fewer
- Large businesses must have an acceptable small business subcontracting plan to be considered From B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf
- Key personnel: Project Manager, Construction Superintendent and Quality Control Manager with comparable wastewater or complex mechanical/process experience From B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf
- Liability insurance clause (1452.228-70) is in the contract From B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf
How to submit: due November 2, 2026 at 2:00 PM (14:00, UTC-07:00 as listed in the notice; the SF 1442 also shows 11/02/2026 and 1400). What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
- Serious: Project is unfunded. The government says funding is not yet in place, so you could spend money on a proposal and bonding with no guaranteed award or a delayed one. From B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf
- Serious: Large project, over $10 million. A job this size needs a lot of bonding capacity, cash flow and prior experience, which is hard for most small businesses. From B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf
- Serious: Complex process-plant experience expected. Past performance and key personnel are judged on wastewater plant and process equipment work of similar size and complexity, so a general contractor without that record will score lower. From B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf
Show all 8Show fewer
- Worth checking: Remote, seasonal work site. The plant is inside Grand Canyon National Park, with limited staging, winter and tourist-season limits, so schedule and logistics plans are heavily scored. From B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf
- Worth checking: Bid guarantee required. You must submit a bid bond (or other guarantee) with the proposal, so you need a surety lined up before the deadline. From B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf
- Worth checking: Asbestos and lead paint at the existing plant. The hazardous materials report found asbestos-containing material and lead paint at the old plant; it is not clear from the text provided whether demolition or abatement is in your scope, but it could add cost and licensed-subcontractor needs. From B08_Att_05_Hazardous_Materials_Investigation_Report_South_Rim_WWTP.pdf
- Minor: Site visit referenced. The form points to a pre-proposal site visit in Section L; the date and whether it is mandatory are not visible, and a missed mandatory visit can disqualify you. From B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf
- Minor: Mismatched solicitation numbers in forms. The Project Experience Questionnaire shows a different solicitation number than this one, so confirm you are using the correct current forms. From B08_Att_08_Solit_PSP_Vol_I_Exp_REQD.pdf
Read from the notice and 12 attachments. 7 of 19 not read. Show which files.
- B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf (read)
- Sol_140P2026R0101.pdf (read)
- B08_Att_03_GRCA257282_100P_FinalCD_Addendum_1.pdf (read)
- B08_Att_04_GRCA257282_Geotechnical_Recommendation_TM_May2025.pdf (read)
- B08_Att_09_Solit_PSP_Vol_I_PastPerf_REQD.pdf (read)
- B08_Att_10_Solit_PSP_Vol_II_BidBond.pdf (read)
- B08_Att_13_Solit_PSP_Vol_II_SubKPlan_REQD_RELEASED_v2_Mar25.pdf (read)
- B08_Att_08_Solit_PSP_Vol_I_Exp_REQD.pdf (read)
- B08_Att_11_Solit_PSP_Vol_II_Equals.pdf (read)
- B08_Att_12_Solit_PSP_Vol_II_GenRefs.pdf (read)
- B08_Att_06_Wage_Determination_(1).pdf (read)
- B08_Att_05_Hazardous_Materials_Investigation_Report_South_Rim_WWTP.pdf (read)
- B08_Att_07_GRCA_257282_Price_Schedule.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- B08_Att_01c_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part3.pdf: not read (it couldn't be opened): open it on SAM.gov
- B08_Att_01a_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part1.pdf: not read (it couldn't be opened): open it on SAM.gov
- B08_Att_01b_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part2.pdf: not read (it couldn't be opened): open it on SAM.gov
- B08_Att_01d_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part4.pdf: not read (it couldn't be opened): open it on SAM.gov
- B08_Att_01e_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part5_1.pdf: not read (it couldn't be opened): open it on SAM.gov
- B08_Att_01e_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part5.pdf: not read (it couldn't be opened): open it on SAM.gov
Full summary
What they want
- Replace the South Rim wastewater treatment plant (CLIN 0010, lump sum)
- Build a compost facility at the plant (CLIN 0020, lump sum)
- Provide operations and maintenance support services for the plant (CLIN 0030, lump sum)
- Improve the plant access road (CLIN 0040, lump sum)
- Option A: radon gas testing (CLIN 0050)
- Option B: active radon mitigation system (CLIN 0060)
- Commission the plant: startup, operator training, testing and regulatory coordination (from the evaluation criteria)
- Price must be a firm-fixed-price offer covering the base items and all options, using the attached price schedule
- Contract type
- Firm-fixed-price (offerors must submit at least one FFP offer with lump-sum line items); construction
- Period of performance
- 02/01/2027 to 02/01/2030 as written on the SF 1442 continuation sheet; timing of the two radon options is not stated in the text provided
- Place of performance
- South Rim Village, Grand Canyon National Park, Arizona (the notice's place of performance field is blank)
- Estimated value
- Magnitude of Construction: more than $10,000,000.00 (no upper range given)
- How they'll choose
- Several rated non-price factors plus price (the start of Section M, which would state the award method and relative importance of factors, was left out of the text provided). Price is checked for fairness, reasonableness and unbalanced line items. Options are added to the base price for evaluation.
- Offers due
- November 2, 2026 at 2:00 PM (14:00, UTC-07:00 as listed in the notice; the SF 1442 also shows 11/02/2026 and 1400) (from the version posted Jul 31, 2026; amended since)
What they'll judge offers on
- Factor 1 (title not visible; its closing text is about relevance and performance risk on complex wastewater treatment plant work)
- Factor 2 - Technical Approach (execution and commissioning approach gets the greatest emphasis)
- Factor 3 - Management Approach (capacity, roles, safety including EMR rating, quality, communication)
- Factor 4 - Key Personnel Experience (Project Manager, Construction Superintendent, Quality Control Manager)
- Factor 5 - Past Performance
- Factor 6 - Small Business Participation (small business primes get the maximum score)
- Volume II price and business items: not rated, but price is an evaluation factor
What to include when you submit
- Proposal has Volume I (technical factors) and Volume II (business and price)
- Volume II includes: SF 1442, amendment acknowledgements, Section B price schedule, bid guarantee (SF 24 bid bond or other suitable guarantee), Section K representations and certifications, and general references
- Complete the price schedule attachment (Attachment 13 / Price Schedule spreadsheet) with prices for the base items and all option items
- Large businesses must submit a small business subcontracting plan
- Offerors must address and acknowledge clause 52.229-11
- Past performance and project experience questionnaires are part of the submission package
- Section L (not fully visible) holds the exact proposal submittal and pre-proposal site visit instructions
Not in the notice text
- Section L submission instructions are mostly cut off: how to submit (email or portal), page limits, volume formats and the site visit date and whether it is mandatory
- Start of Section M is cut off: the stated award method, the title of Factor 1 and the order of importance of factors and price
- Section H special requirements (key personnel, option timing, commencement and completion days) are not visible
- Whether performance and payment bonds are required and the bid guarantee amount (SF 1442 blocks 12a, 12b and 13 are not legible)
- Liquidated damages amount, wage determination and Buy American details are in cut-off clause text or an unreadable attachment
- Price schedule spreadsheet and the construction drawings (Parts 1 to 5) were not read (it may be an attached file the AI skipped; check SAM.gov) in readable form, so quantities and detailed scope are unknown
- Whether demolition or hazardous material abatement is part of this contract
- When funding will be available and when award will happen
- Notice place of performance field is blank; the SF 1442 issue dates differ between the two copies (07/30/2026 and 08/03/2026), so check for the latest amendment
Notice details
Notice type, codes, versions and files
- Posted
- Jul 31, 2026
- Notice type
- Solicitation
- Office
- DSC Contracting Services Division, Denver, CO
- Product/service code
- Y1ND · Construction of Sewage and Waste Facilities
- Business type
- Energy, fuel & utilities (FedReady's grouping, from NAICS 221320)
- Versions
12 versions have been posted. The newest 11 are listed, newest first.
- Nov 16, 2026 · AmendmentDue Dec 18, 2026
- Nov 10, 2026 · AmendmentDue Dec 18, 2026 (changed)
- Oct 28, 2026 · AmendmentDue Nov 18, 2026
- Oct 27, 2026 · AmendmentDue Nov 18, 2026
- Oct 16, 2026 · AmendmentDue Nov 18, 2026 (changed)
- Sep 18, 2026 · AmendmentDue Nov 2, 2026
- Sep 3, 2026 · AmendmentDue Nov 2, 2026
- Sep 2, 2026 · AmendmentDue Nov 2, 2026
- Aug 11, 2026 · AmendmentDue Nov 2, 2026
- Aug 7, 2026 · AmendmentDue Nov 2, 2026
- Jul 31, 2026 · Solicitation (this version)Due Nov 2, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- Operations and Maintenance (O&M) Services for the SBIWTPThe International Boundary and Water Commission: US-Mexico (USIBWC) wants a contractor to operate and maintain the South Bay International Wastewater Treatment Plant (SBIWTP) in…
- Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant UpgradesSolicitation 6973GH-27-R-00005 is a total small business set-aside: only small businesses can bid.
- Rosebud Lift Station ConstructionThe Indian Health Service (IHS), Division of Engineering Services in Seattle, wants a contractor under solicitation 75H70127R00007 to remove and replace the sewage lift station…
- Wilson Lake Sewage Lagoon Project (Minooka and Lucas Parks), USACE Kansas CityThe U.S. Army Corps of Engineers, Kansas City District, plans a total small business set-aside invitation for bid (IFB: a sealed-bid solicitation) for sewer upgrades at Minooka…