Solicitation
Building 262 Renovation, FLETC Glynco, Georgia
Department of Homeland Security · Federal Law Enforcement Training Center
Small business set-aside · GA
AI summary Beta
This summary may miss requirements: 37 of 47 attachments weren't read (Site Visit Sign-In Sheet 70LGLY27RSSB00001 Building 262 Renovation.pdf, BG0262 VAV Photos.pdf and 35 more). Check the attachments on SAM.gov.
The Federal Law Enforcement Training Center (FLETC) at Glynco, Georgia wants a contractor to renovate Building 262 under solicitation 70LGLY27RSSB00001, one firm-fixed-price (FFP: one set price, whatever the work costs) construction contract. It is a 100% small business set-aside, and the response due date is December 2, 2026, 11:00 AM Eastern. Work runs 425 calendar days after notice to proceed. The statement of work, forms and drawings are controlled: sign the Non-Disclosure Agreement (NDA) and ask the Contracting Officer before you can see them.
Who can bid (6)
- 100% small business set-aside under NAICS 236220 (Commercial and Institutional Building Construction)
- Registered in the System for Award Management (SAM.gov) From 70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf
- Completed Non-Disclosure Agreement (Attachment 11) returned to the Contracting Officer to get access to the controlled documents
Show all 6Show fewer
- Current contractor license(s) and qualifications submitted with the offer From 70LGLY27RSSB00001 Amendment 0003 Request for Proposal Building 262 Renovation.pdf
- Prime contractor with at least 5 years of experience in installation of plumbing, painting, or similar work From 70LGLY27RSSB00001 Amendment 0003 Request for Proposal Building 262 Renovation.pdf
- Two to four projects of at least $1,000,000 with similar renovation scope, completed in the last five years or at least 80% complete From 70LGLY27RSSB00001 Amendment 0003 Request for Proposal Building 262 Renovation.pdf
Things to watch (10)
From the version posted Nov 18, 2026.
- Serious: Controlled documents need a signed NDA first. The statement of work, specifications, drawings, bond forms and the proposal breakdown are controlled in SAM.gov; without the signed Non-Disclosure Agreement (NDA) you cannot see what you are pricing.
- Serious: Small business set-aside only. Only small businesses under NAICS 236220 can bid; larger firms cannot win this award.
- Serious: Minimum ratings needed to be considered. An offer needs at least a Satisfactory past performance rating (Neutral if there is no record) and an Acceptable corporate experience rating, however low the price. From 70LGLY27RSSB00001 Amendment 0003 Request for Proposal Building 262 Renovation.pdf
Show all 10Show fewer
- Serious: Performance and payment bonds at 100% within ten days. Both bonds are required for the full contract price within ten calendar days after receipt of the notice of award, and failure is grounds for default. From 70LGLY27RSSB00001 Amendment 0003 Request for Proposal Building 262 Renovation.pdf
- Worth checking: Bid guarantee wording conflicts. The bid guarantee clause is labeled not required, yet its text sets 20% of the bid price or $3,000,000.00, whichever is less; Amendment 0002 removed the SF 24 bid bond sheet from the attachments, so ask the contracting officer. From 70LGLY27RSSB00001 Amendment 0003 Request for Proposal Building 262 Renovation.pdf
- Worth checking: Past projects must be $1,000,000 or more and recent. Two to four projects with restroom plumbing fixture, flooring, painting and door repair scope are needed, each completed in the last five years or at least 80% complete, with PPQs. From 70LGLY27RSSB00001 Amendment 0003 Request for Proposal Building 262 Renovation.pdf
- Worth checking: The site visit was Oct 20, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered.
- Minor: Building stays occupied and furniture is the contractor's job. Occupants stay during work, and the contractor must remove, cover or replace furniture; extra pay may be negotiated only for library or volume storage rooms. From 70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf
- Minor: Davis-Bacon wage rates apply. A Georgia building wage determination for Brantley, Glynn and McIntosh counties is attached, so set labor prices to those rates.
- Minor: Award may happen without discussions. The Government may award without discussions, so send your best technical and price terms the first time. From 70LGLY27RSSB00001 Amendment 0003 Request for Proposal Building 262 Renovation.pdf
Read from the notice and 10 attachments. 37 of 47 not read. Show which files.
- 70LGLY27RSSB00001 Amendment 0007 Request for Proposal Building 262 Renovation.pdf (read)
- 70LGLY27RSSB00001 Amendment 0006 Request for Proposal Building 262 Renovation.pdf (read)
- 70LGLY27RSSB00001 Amendment 0005 Request for Proposal Building 262 Renovation.pdf (read)
- 70LGLY27RSSB00001 Amendment 0004 Request for Proposal Building 262 Renovation.pdf (read)
- 70LGLY27RSSB00001 Amendment 0003 Request for Proposal Building 262 Renovation.pdf (read)
- 70LGLY27RSSB00001 Amendment 0002 Request for Proposal Building 262 Renovation.pdf (read)
- 70LGLY27RSSB00001 Amendment 0001 Request for Proposal Building 262 Renovation.pdf (read)
- 70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf (read)
- Att 011 DHS 11000-6 Non-Disclosure Agreement - Copy.pdf (read)
- Att 018 Wage Determination GA20260315 05182026.pdf (read)
- Site Visit Sign-In Sheet 70LGLY27RSSB00001 Building 262 Renovation.pdf: not summarized: open it on SAM.gov
- BG0262 VAV Photos.pdf: not summarized: open it on SAM.gov
- Building 262 Drawings.zip: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Att 001 Statement of Work Building 262 Renovation 70LGLY27RSSB00001 AMD 0007.pdf: not read (access is restricted): request it on SAM.gov
- RFI 05 70LGLY27RSSB00001 Building 262 Renovation.pdf: not read (access is restricted): request it on SAM.gov
- RFI 04 70LGLY27RSSB00001 Building 262 Renovation.pdf: not read (access is restricted): request it on SAM.gov
- Att 001 Statement of Work Building 262 Renovation 70LGLY27RSSB00001 AMD 0005.pdf: not read (access is restricted): request it on SAM.gov
- Att 001 Statement of Work and Specifications Building 262 Renovation 70LGLY27RSSB00001 AMD 0004.pdf: not read (access is restricted): request it on SAM.gov
- RFI 03 70LGLY27RSSB00001 Building 262 Renovation Amendment 0004.pdf: not read (access is restricted): request it on SAM.gov
- RFI 02 70LGLY27RSSB00001 Building 262 Renovation Corrections Amendment 0004.pdf: not read (access is restricted): request it on SAM.gov
- CADD and PDF Drawings AMD 0002.zip: not read (access is restricted): request it on SAM.gov
- Building 262 Photos 70LGLY27RSSB00001.pdf: not read (access is restricted): request it on SAM.gov
- Att 001 Statement of Work and Specifications Building 262 Renovation 70LGLY27RSSB00001 AMD 0002.pdf: not read (access is restricted): request it on SAM.gov
- RFI 01 70LGLY27RSSB00001 Building 262 Renovation.pdf: not read (access is restricted): request it on SAM.gov
- Exhibit A - Proposal Breakdown.xls: not read (access is restricted): request it on SAM.gov
- Att 001 Statement of Work and Specifications Building 262 Renovation 70LGLY27RSSB00001.pdf: not read (access is restricted): request it on SAM.gov
- Att 002 SF25 Performance Bonds.pdf: not read (access is restricted): request it on SAM.gov
- Att 003 SF 25A Payment bonds -.pdf: not read (access is restricted): request it on SAM.gov
- Att 004 SF28 Affidavit of Individual Surety - Copy - Copy.pdf: not read (access is restricted): request it on SAM.gov
- Att 005 Format ILC -.pdf: not read (access is restricted): request it on SAM.gov
- Att 006 Format FIN INST ILC CONFIRM - Copy.pdf: not read (access is restricted): request it on SAM.gov
- Att 007 FMD_70 - Copy.pdf: not read (access is restricted): request it on SAM.gov
- Att 008 Instructions for Completing WH-347 - Copy.pdf: not read (access is restricted): request it on SAM.gov
- Att 009 WH 347 Wage and Hour Division - Copy.pdf: not read (access is restricted): request it on SAM.gov
- Att 010 FMD_42 - Copy.pdf: not read (access is restricted): request it on SAM.gov
- Att 013 USCIS Form I-9 Instructions for Employment.pdf: not read (access is restricted): request it on SAM.gov
- Att 014 Eligibility Verification Form.pdf: not read (access is restricted): request it on SAM.gov
- Att 015 Questionnaire for Non-Sensitive Positions.pdf: not read (access is restricted): request it on SAM.gov
- Att 016 Security Handout.pdf: not read (access is restricted): request it on SAM.gov
- Att 017 Security Training List.pdf: not read (access is restricted): request it on SAM.gov
- Att 019 Statement and Acknowledgment.pdf: not read (access is restricted): request it on SAM.gov
- Att 020 SF1444 Request for Authorization of Additional Classification and Rate.pdf: not read (access is restricted): request it on SAM.gov
- Att 022 SF LLL Disclosure of Lobbying Activities.pdf: not read (access is restricted): request it on SAM.gov
- Att 023 Financial Questionnaire.pdf: not read (access is restricted): request it on SAM.gov
- Att 024 700-3 Contractor Release Form.pdf: not read (access is restricted): request it on SAM.gov
- Att 025 WH DOL Poster.pdf: not read (access is restricted): request it on SAM.gov
- Att 026 Past Performance Questionnaire.pdf: not read (access is restricted): request it on SAM.gov
Full summary
What they want
- Renovate Building 262 at FLETC Glynco: eight firm-fixed-price lines, each QTY 1 EA: general requirements, existing conditions, thermal and moisture protection, openings, finishings, special construction, electrical, and heating, ventilation and air conditioning (HVAC)
- Furnish all labor, materials, equipment and supervision, and verify quantities, dimensions and site conditions in the field
- Move furniture and equipment for access and put them back; the Government removes personal items, computers, telephones, audio-visual equipment and fax machines
- Send submittals no later than 14 calendar days after award
- Start work within 10 calendar days after notice to proceed and finish within 425 calendar days
- Work while the building may stay occupied
- Furnish performance and payment bonds, each 100% of the contract price, within ten calendar days of the notice of award
- Contract type
- Single firm-fixed-price construction contract; award is the best suited firm, then negotiate
- Period of performance
- 425 calendar days after notice to proceed; the amendments list January 11, 2027 to March 11, 2028 (written 01/11/2027 to 03/11/2028)
- Place of performance
- Federal Law Enforcement Training Center, Glynco, Georgia (Building 262)
- Estimated value
- Not stated
- How they'll choose
- Best suited, then negotiate: the Government picks the best suited firm, then talks only with that firm to settle remaining issues; a firm must reach minimum ratings on the first two factors to be considered
- Offers due
- December 2, 2026, 11:00 AM Eastern
What they'll judge offers on
- Past Performance: Government pulls records from the Past Performance Information Retrieval System (PPIRS), CPARS and other sources for the past five years, using the CAGE or unique identifier number the offeror gives, up to three records; rated Superior, Satisfactory, Neutral or Unsatisfactory
- Corporate Relevant Experience: two to four Past Performance Questionnaires (Attachment 26) for projects of at least $1,000,000, plus license copies and a statement of professional credentials
- Price: price analysis under FAR 15.404-1(b) for fairness and reasonableness, using historical pricing and the Independent Government Estimate
What to include when you submit
- Send two to four Past Performance Questionnaires (PPQs, Attachment 26) under Tab F1, each for a project of at least $1,000,000 that is similar in size and scope and was completed in the last five years or is at least 80% complete at solicitation issuance; at least two must meet these criteria
- Send under Tab F2 a copy of your current license(s) and qualifications, and a statement of professional credentials with copies of licenses and certifications for restroom remodeling, painting, plumbing fixture replacement and tile or luxury vinyl plank (LVP) flooring work
- Show that the prime contractor has at least 5 years of experience in commercial restroom remodeling, painting, plumbing fixtures replacement or similar work
- Give your CAGE or unique identifier number so the Government can retrieve past performance records
- Complete the bid schedule and proposal breakdown in Exhibit A
- Acknowledge every amendment on Standard Form 30 or in block 19 of the Standard Form 1442; a missing acknowledgment may get the offer rejected
- Send the signed Non-Disclosure Agreement (Attachment 11) to the Contracting Officer to get the controlled documents; badging and security forms are among the attachments
After award, you must have
- Performance and payment bonds, each 100% of the contract price, within ten calendar days after receipt of the notice of award From 70LGLY27RSSB00001 Amendment 0003 Request for Proposal Building 262 Renovation.pdf:
(10) calendar days after receipt of the notice of award. The furnishing of bonds is a part of…
Not in the notice text
- Most solicitation documents are attached on SAM.gov as controlled files that were not read: the statement of work and specifications, request-for-information answers 01 to 05, drawings, photos, Exhibit A proposal breakdown, bond forms, security and badging forms, and the past performance questionnaire; request access with the signed NDA
- How to submit the proposal (email, portal or other) is in the part of the solicitation that was not read
- The actual scope of work, room counts and the number of variable air volume (VAV) units are in the controlled statement of work and photos
- Whether a bid guarantee is required: one clause says not required, but its text sets 20% of the bid price
- Evaluation factor weights and the Government's estimate are not stated in the readable text
Notice details
Notice type, codes, versions and files
- Posted
- Nov 18, 2026
- Notice type
- Solicitation
- Office
- FLETC Glynco Procurement Office, Brunswick, GA
- Product/service code
- Z2AA · Repair or Alteration of Office Buildings
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
11 versions have been posted, newest first.
- Nov 18, 2026 · Amendment 0007 (this version)Due Dec 2, 2026
- Nov 16, 2026 · AmendmentDue Dec 2, 2026 (changed)
- Nov 10, 2026 · AmendmentDue Nov 18, 2026
- Nov 3, 2026 · AmendmentDue Nov 18, 2026
- Oct 27, 2026 · AmendmentDue Nov 18, 2026 (changed)
- Oct 23, 2026 · AmendmentDue Nov 9, 2026
- Oct 21, 2026 · AmendmentDue Nov 9, 2026
- Oct 14, 2026 · AmendmentDue Nov 9, 2026
- Oct 9, 2026 · AmendmentDue Nov 9, 2026
- Oct 9, 2026 · AmendmentDue Nov 9, 2026
- Oct 9, 2026 · SolicitationDue Nov 9, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Seawater Pump RenovationThe National Oceanic and Atmospheric Administration (NOAA), part of the Department of Commerce, wants a small business to replace the salt water pump system and its wiring at its…
- Construction-NUWCDIVNPT-Interior RenovationsSolicitation N6660427Q0033: Naval Undersea Warfare Center Division Newport (NUWCDIVNPT) wants an interior renovation (the B68 Renovation Project) in Newport, RI, finished 120…
- Interior Office Renovation and Wall Removal - Offutt AFBSources sought notice FA7014-27-CP-0001 from the Department of the Air Force (55th Contracting Squadron) for market research only; it is not a solicitation.
- Design-Build Renovation of Building 164, Outdoor Recreation Center, Homestead Air Reserve Base, FloridaThe Department of the Air Force (contracting office FA6648 482 LSS LGC) wants a firm-fixed-price design-build contractor to renovate the Outdoor Recreation Center, Building 164,…
- RM16-1405 Building 592 RenovationsThis is set aside for 8(a) firms (small businesses in the SBA's 8(a) program), and the amendments point to a task order among holders of a Navy multiple award construction…