Solicitation
Building 262 Renovation, FLETC Glynco, Georgia
Department of Homeland Security · Federal Law Enforcement Training Center
Small business set-aside · GA
A newer version of this notice was posted Nov 18, 2026. It moves the due date from Nov 9, 2026 to Dec 2, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of the version posted Oct 9, 2026. The notice was amended Nov 18, 2026. The due date moved from Nov 9, 2026 to Dec 2, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 25 of 28 attachments weren't read (Building 262 Drawings.zip, Att 001 Statement of Work and Specifications Building 262 Renovation 70LGLY27RSSB00001.pdf and 23 more). Check the attachments on SAM.gov.
The Federal Law Enforcement Training Center (FLETC, part of DHS) wants one small business to renovate Building 262 at its Glynco, Georgia campus under a single firm-fixed-price contract. The statement of work, specs, drawings and price sheet are controlled documents: you must sign and return a Non-Disclosure Agreement to the contracting officer to get them. Performance and payment bonds are required.
Who can bid (8)
- Small business: this is a 100% small business set-aside under NAICS 236220 (size standard shown as $45M)
- Active registration in SAM.gov From 70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf
- Signed Non-Disclosure Agreement (Attachment 11, DHS Form 11000-6) returned to the contracting officer before you can see the controlled solicitation documents
Show all 8Show fewer
- Performance and payment bonds, each for 100% of the contract price, delivered within 10 calendar days after notice of award; a letter from your surety stating bonding capacity (with aggregate) is due with the proposal From 70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf
- Current contractor license(s) and credentials; the prime should have at least 5 years of commercial experience in restroom remodeling, painting, plumbing fixture replacement or similar work From 70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf
- At least two (up to four) completed comparable renovation projects of $1,000,000 or more in the last 5 years (or at least 80% complete), documented on Past Performance Questionnaires From 70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf
- Insurance certificate within 10 days after award: general liability, automobile and workers' compensation at the stated minimums, with FLETC named as additional insured From 70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf
- Every worker (and subcontractor worker) who will be on FLETC must pass a fitness/background screening and get a badge; E-Verify is required for the workforce From 70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf
How to submit: Email to the Contracting Officer, Brett Zeigler, brett.zeigler@fletc.dhs.gov. Electronic only: no fax, no hand delivery. Time of receipt of the email counts, not the upload time., due Nov 9, 2026, 11:00 AM Eastern. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (11)
- Serious: Key documents are locked behind an NDA. The statement of work, specifications, drawings, bond forms, financial questionnaire and price sheet are controlled, so you cannot judge the scope or price the job until you sign and return the NDA and the contracting officer grants access.
- Serious: 100% performance and payment bonds required, surety letter due with proposal. You need a surety willing to bond the full contract price within 10 days of award, and the proposal must include a letter stating your bonding capacity; failing to deliver bonds is grounds for default. From 70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf
- Worth checking: Site visit date conflict between notice and RFP. The notice says the site visit is October 22, 2026 with day-pass applications due October 20 at 5:00pm, while the RFP says October 20, 2026 with access coordination due October 15 at 5:00pm; ask the contracting officer which is right. Check the notice: its text gives October 20 as the site visit date, not the offer due date. Attendance is described as urged and expected, not mandatory, so treat it as strongly encouraged. From 70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf
Show all 11Show fewer
- Worth checking: Completion time conflict: 120 days vs 425 days. The Section F clause requires completion within 120 calendar days after notice to proceed, but the continuation sheet shows delivery 425 days after notice to proceed and a period of performance running 01/11/2027 to 03/11/2028; the schedule you price against is unclear. From 70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf
- Worth checking: Minimum ratings to be considered for award. You must reach Satisfactory on Past Performance and Acceptable on Corporate Relevant Experience; a Neutral past performance rating (no record found) is defined separately and the text does not say if it qualifies, which matters for newer firms. From 70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf
- Worth checking: Experience bar: $1M comparable projects and licenses. You need at least two renovation projects of $1,000,000 or more with similar scope, plus current licenses and credentials, and the experience ratings are tied to plumbing, flooring and painting licensing. From 70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf
- Worth checking: Worker background checks; access denial is your cost. All workers need FLETC fitness screening and badging, and delays or costs from anyone being denied access fall on you with no claim allowed. From 70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf
- Worth checking: Late if the email arrives after the deadline. Receipt of the email by the contracting officer sets the time, not when you upload, and fax or hand delivery is not accepted. From 70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf
- Minor: Bid guarantee wording is contradictory. Section G.7 includes full bid guarantee text but is labeled not required; confirm no bid bond is needed with your proposal. From 70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf
- Minor: Working in an occupied building with restricted hours. Staff may remain in the building, you must move and protect furniture, and work outside normal hours or on weekends needs advance approval, which affects scheduling and cost. From 70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf
- Minor: Davis-Bacon wages and certified payroll. Pay at least the posted Georgia building wage rates and keep payroll submittals current or invoices will be returned unpaid. From 70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf
Read from the notice and 3 attachments. 25 of 28 not read. Show which files.
- 70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf (read)
- Att 011 DHS 11000-6 Non-Disclosure Agreement - Copy.pdf (read)
- Att 018 Wage Determination GA20260315 05182026.pdf (read)
- Building 262 Drawings.zip: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Att 001 Statement of Work and Specifications Building 262 Renovation 70LGLY27RSSB00001.pdf: not read (access is restricted): request it on SAM.gov
- Att 002 SF25 Performance Bonds.pdf: not read (access is restricted): request it on SAM.gov
- Att 003 SF 25A Payment bonds -.pdf: not read (access is restricted): request it on SAM.gov
- Att 004 SF28 Affidavit of Individual Surety - Copy - Copy.pdf: not read (access is restricted): request it on SAM.gov
- Att 005 Format ILC -.pdf: not read (access is restricted): request it on SAM.gov
- Att 006 Format FIN INST ILC CONFIRM - Copy.pdf: not read (access is restricted): request it on SAM.gov
- Att 007 FMD_70 - Copy.pdf: not read (access is restricted): request it on SAM.gov
- Att 008 Instructions for Completing WH-347 - Copy.pdf: not read (access is restricted): request it on SAM.gov
- Att 009 WH 347 Wage and Hour Division - Copy.pdf: not read (access is restricted): request it on SAM.gov
- Att 010 FMD_42 - Copy.pdf: not read (access is restricted): request it on SAM.gov
- Att 013 USCIS Form I-9 Instructions for Employment.pdf: not read (access is restricted): request it on SAM.gov
- Att 014 Eligibility Verification Form.pdf: not read (access is restricted): request it on SAM.gov
- Att 015 Questionnaire for Non-Sensitive Positions.pdf: not read (access is restricted): request it on SAM.gov
- Att 016 Security Handout.pdf: not read (access is restricted): request it on SAM.gov
- Att 017 Security Training List.pdf: not read (access is restricted): request it on SAM.gov
- Att 019 Statement and Acknowledgment.pdf: not read (access is restricted): request it on SAM.gov
- Att 020 SF1444 Request for Authorization of Additional Classification and Rate.pdf: not read (access is restricted): request it on SAM.gov
- Att 021 Bid Bond.pdf: not read (access is restricted): request it on SAM.gov
- Att 022 SF LLL Disclosure of Lobbying Activities.pdf: not read (access is restricted): request it on SAM.gov
- Att 023 Financial Questionnaire.pdf: not read (access is restricted): request it on SAM.gov
- Att 024 700-3 Contractor Release Form.pdf: not read (access is restricted): request it on SAM.gov
- Att 025 WH DOL Poster.pdf: not read (access is restricted): request it on SAM.gov
- Att 026 Past Performance Questionnaire.pdf: not read (access is restricted): request it on SAM.gov
- Exhibit A - Proposal breakdown 70LGLY26RSSB00022 Flood Mitigation and Site Improvements.xls: not read (access is restricted): request it on SAM.gov
Full summary
What they want
- Renovate Building 262 at FLETC Glynco, Georgia: all labor, materials, equipment and supervision
- Work is priced as 8 lump-sum lines: general requirements, existing conditions, thermal and moisture protection, openings, finishings, special construction, electrical, and HVAC
- The experience criteria point to restroom remodeling, plumbing fixture replacement, tile/carpet/LVP flooring, interior and exterior painting and door repairs (the full scope is in the controlled Attachment 1)
- Move and protect furniture and equipment for access, then put it back (the building may stay occupied during the work)
- Submit shop drawings and other submittals within 14 calendar days after award
- Provide 100% performance and payment bonds, insurance, daily reports and certified payroll
- Follow FLETC safety, security and badging rules for every worker (OSHA, EM 385-1-1)
- Contract type
- Single firm-fixed-price construction contract (RFP on SF 1442)
- Period of performance
- Continuation sheet: delivery 425 days after notice to proceed, period of performance 01/11/2027 to 03/11/2028. The Section F clause says 120 calendar days after notice to proceed (see red flags). Work must start within 5 calendar days after notice to proceed.
- Place of performance
- Building 262, FLETC, Glynco, Georgia (SAM.gov field: GA, USA)
- Estimated value
- Not stated
- How they'll choose
- Best-suited tradeoff. Past Performance and Corporate Relevant Experience (the non-cost factors) together are equal in importance to Price. To be considered for award an offer needs at least a Satisfactory Past Performance rating and an Acceptable Corporate Relevant Experience rating. The government may award to other than the lowest or highest price, and may award without any discussions.
- Offers due
- Nov 9, 2026, 11:00 AM Eastern (from the version posted Oct 9, 2026; amended since)
- How to submit
- Email to the Contracting Officer, Brett Zeigler, brett.zeigler@fletc.dhs.gov. Electronic only: no fax, no hand delivery. Time of receipt of the email counts, not the upload time.
What they'll judge offers on
- Factor 1, Past Performance: the government pulls your records itself from PPIRS/CPARS, FAPIIS, eSRS and other sources (up to three records, last five years, found by your CAGE/UEI); nothing to submit. Rated Superior, Satisfactory, Neutral or Unsatisfactory
- Factor 2, Corporate Relevant Experience: (a) 2 to 4 Past Performance Questionnaires (Attachment 26) for renovation projects of at least $1,000,000 each, completed in the last 5 years or at least 80% complete; (b) copies of licenses; (c) statement of professional credentials and certifications. Rated Superior, Good, Acceptable, Marginal or Unsatisfactory
- Factor 3, Price: contracting officer price analysis for fairness, reasonableness and realism, using historical prices and the Independent Government Estimate
What to include when you submit
- All files in Adobe PDF, except the bid schedule and supporting pricing, which go in Excel using Exhibit A (Proposal Breakdown)
- Price proposal and technical information must be separate, single files
- Volume I Price: Tab A signed SF 1442; Tab B Section B bid schedule (Exhibit A); Tab C Section K representations and certifications; Tab D financial information (Attachment 23 plus a letter from your surety company stating bonding capacity and aggregate)
- Volume II Technical: Tab E past performance (nothing to submit, government pulls records); Tab F1 two to four Past Performance Questionnaires (Attachment 26); Tab F2 copies of licenses, certifications and statement of professional credentials; Tab G teaming arrangements and narratives, if any
- Information about subcontractors or affiliates is not evaluated unless Tab G has a detailed narrative explaining why it is relevant
- Proposals must be signed by an authorized official and organized and tabbed as above
- Include the RFP number 70LGLY27RSSB00001 and the project title with the submission; send questions to the contracting officer by email
- Use wage determination GA20260315 dated 05/18/2026, or the most recent one at the time you submit
- Complete Attachment 11 (DHS 11000-6 Non-Disclosure Agreement) and return it to the contracting officer to get the controlled documents
Not in the notice text
- The full statement of work, specifications and drawings (Attachment 1 and the drawings zip) are controlled and require the signed NDA; they were not available to read
- The price sheet (Exhibit A), bond forms, Past Performance Questionnaire (Attachment 26), Financial Questionnaire (Attachment 23) and security handouts were not read (it may be an attached file the AI skipped; check SAM.gov)
- Estimated contract value or budget range is not stated
- Which site visit date is correct (October 20 or October 22, 2026) and the deadline for questions
- Which completion schedule applies (120 days or 425 days after notice to proceed)
- Section H.29 site access rules and the middle of the RFP (about 85,000 characters, including later security sections and the Section I clause list) were not in the text provided
- Page limits for the technical volume are not stated in the text read
- Whether a Neutral past performance rating (no record) can still qualify
Notice details
Notice type, codes, versions and files
- Posted
- Oct 9, 2026
- Notice type
- Solicitation
- Office
- FLETC Glynco Procurement Office, Brunswick, GA
- Product/service code
- Z2AA · Repair or Alteration of Office Buildings
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
11 versions have been posted, newest first.
- Nov 18, 2026 · AmendmentDue Dec 2, 2026
- Nov 16, 2026 · AmendmentDue Dec 2, 2026 (changed)
- Nov 10, 2026 · AmendmentDue Nov 18, 2026
- Nov 3, 2026 · AmendmentDue Nov 18, 2026
- Oct 27, 2026 · AmendmentDue Nov 18, 2026 (changed)
- Oct 23, 2026 · AmendmentDue Nov 9, 2026
- Oct 21, 2026 · AmendmentDue Nov 9, 2026
- Oct 14, 2026 · AmendmentDue Nov 9, 2026
- Oct 9, 2026 · Amendment 0007 (this version)Due Nov 9, 2026
- Oct 9, 2026 · AmendmentDue Nov 9, 2026
- Oct 9, 2026 · SolicitationDue Nov 9, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Seawater Pump RenovationThe National Oceanic and Atmospheric Administration (NOAA), part of the Department of Commerce, wants a small business to replace the salt water pump system and its wiring at its…
- Construction-NUWCDIVNPT-Interior RenovationsSolicitation N6660427Q0033: Naval Undersea Warfare Center Division Newport (NUWCDIVNPT) wants an interior renovation (the B68 Renovation Project) in Newport, RI, finished 120…
- Interior Office Renovation and Wall Removal - Offutt AFBSources sought notice FA7014-27-CP-0001 from the Department of the Air Force (55th Contracting Squadron) for market research only; it is not a solicitation.
- Design-Build Renovation of Building 164, Outdoor Recreation Center, Homestead Air Reserve Base, FloridaThe Department of the Air Force (contracting office FA6648 482 LSS LGC) wants a firm-fixed-price design-build contractor to renovate the Outdoor Recreation Center, Building 164,…
- RM16-1405 Building 592 RenovationsThis is set aside for 8(a) firms (small businesses in the SBA's 8(a) program), and the amendments point to a task order among holders of a Navy multiple award construction…