Solicitation
Building 262 Renovation, FLETC Glynco, Georgia
Department of Homeland Security · Federal Law Enforcement Training Center
Small business set-aside · GA
A newer version of this notice was posted Nov 18, 2026. See the latest version.
AI summary Beta
Summary of the version posted Nov 16, 2026. The notice was amended Nov 18, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 35 of 44 attachments weren't read (Site Visit Sign-In Sheet 70LGLY27RSSB00001 Building 262 Renovation.pdf, BG0262 VAV Photos.pdf and 33 more). Check the attachments on SAM.gov.
The Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, wants a small business to renovate Building 262 under solicitation 70LGLY27RSSB00001, as a single firm-fixed-price (FFP: one set price) contract. The response due date is December 2, 2026, 11:00 AM Eastern. A site visit was scheduled for October 22, 2026 (passed), at 9:00 AM; the text does not call it mandatory. A Davis-Bacon wage determination (GA20260315, Georgia building rates, the federal minimum pay for construction workers) is attached. Performance and payment bonds are required.
Who can bid (5)
- Small business, because this is a 100% small business set-aside under NAICS 236220
- Active registration in the System for Award Management (SAM.gov) From 70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf
- Signed non-disclosure agreement (Attachment 11) returned to the contracting officer to get access to the controlled documents
Show all 5Show fewer
- Current license(s) and qualifications, with the prime holding at least 5 years of related commercial experience From 70LGLY27RSSB00001 Amendment 0003 Request for Proposal Building 262 Renovation.pdf
- At least 2 projects of $1,000,000 or more with similar renovation scope, finished in the last five years or at least 80% complete when the solicitation was issued From 70LGLY27RSSB00001 Amendment 0003 Request for Proposal Building 262 Renovation.pdf
Things to watch (9)
- Serious: 100% small business set-aside. Only small businesses under NAICS 236220 can bid.
- Serious: Signed non-disclosure agreement needed to see the requirements. The statement of work, drawings, bid schedule and bond forms are controlled documents; you must return the signed agreement (Attachment 11) to the contracting officer before you can request access on SAM.gov.
- Serious: Payment and performance bonds at 100% of the contract price. Both bonds are required within 10 calendar days after the notice of award, and failing to deliver them is grounds for default, so line up a surety before bidding. From 70LGLY27RSSB00001 Amendment 0003 Request for Proposal Building 262 Renovation.pdf
Show all 9Show fewer
- Worth checking: Experience and license thresholds. You need 2 to 4 similar projects of at least $1,000,000 each, a current license and 5 years of related experience, and the minimum rating is Acceptable on experience. From 70LGLY27RSSB00001 Amendment 0003 Request for Proposal Building 262 Renovation.pdf
- Worth checking: The site visit was Oct 20, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered.
- Worth checking: Response due date has moved to December 2, 2026. Amendment 0006 sets the new date and time; earlier amendments had it at November 18, 2026, so check which documents still show the old date. From 70LGLY27RSSB00001 Amendment 0006 Request for Proposal Building 262 Renovation.pdf
- Worth checking: Work in an occupied building. The building may be occupied while you work, and you must move and protect furniture and put it back. From 70LGLY27RSSB00001 Amendment 0003 Request for Proposal Building 262 Renovation.pdf
- Minor: Start-of-work time differs: 10 calendar days in one place, 5 in another. Amendment 0003 says work begins within 10 calendar days after the notice to proceed, while Amendment 0001 and the original RFP say 5 calendar days; ask the contracting officer which applies. From 70LGLY27RSSB00001 Amendment 0003 Request for Proposal Building 262 Renovation.pdf
- Minor: Bid guarantee section is unclear. The heading says a bid guarantee is not required, yet the paragraph below it gives a 20% or $3,000,000 amount; confirm with the contracting officer. From 70LGLY27RSSB00001 Amendment 0003 Request for Proposal Building 262 Renovation.pdf
Read from the notice and 9 attachments. 35 of 44 not read. Show which files.
- 70LGLY27RSSB00001 Amendment 0006 Request for Proposal Building 262 Renovation.pdf (read)
- 70LGLY27RSSB00001 Amendment 0005 Request for Proposal Building 262 Renovation.pdf (read)
- 70LGLY27RSSB00001 Amendment 0004 Request for Proposal Building 262 Renovation.pdf (read)
- 70LGLY27RSSB00001 Amendment 0003 Request for Proposal Building 262 Renovation.pdf (read)
- 70LGLY27RSSB00001 Amendment 0002 Request for Proposal Building 262 Renovation.pdf (read)
- 70LGLY27RSSB00001 Amendment 0001 Request for Proposal Building 262 Renovation.pdf (read)
- 70LGLY27RSSB00001 Request for Proposal Building 262 Renovation.pdf (read)
- Att 011 DHS 11000-6 Non-Disclosure Agreement - Copy.pdf (read)
- Att 018 Wage Determination GA20260315 05182026.pdf (read)
- Site Visit Sign-In Sheet 70LGLY27RSSB00001 Building 262 Renovation.pdf: not summarized: open it on SAM.gov
- BG0262 VAV Photos.pdf: not summarized: open it on SAM.gov
- Building 262 Drawings.zip: not read (the AI doesn't read this file type yet): open it on SAM.gov
- RFI 04 70LGLY27RSSB00001 Building 262 Renovation.pdf: not read (access is restricted): request it on SAM.gov
- Att 001 Statement of Work Building 262 Renovation 70LGLY27RSSB00001 AMD 0005.pdf: not read (access is restricted): request it on SAM.gov
- Att 001 Statement of Work and Specifications Building 262 Renovation 70LGLY27RSSB00001 AMD 0004.pdf: not read (access is restricted): request it on SAM.gov
- RFI 03 70LGLY27RSSB00001 Building 262 Renovation Amendment 0004.pdf: not read (access is restricted): request it on SAM.gov
- RFI 02 70LGLY27RSSB00001 Building 262 Renovation Corrections Amendment 0004.pdf: not read (access is restricted): request it on SAM.gov
- CADD and PDF Drawings AMD 0002.zip: not read (access is restricted): request it on SAM.gov
- Building 262 Photos 70LGLY27RSSB00001.pdf: not read (access is restricted): request it on SAM.gov
- Att 001 Statement of Work and Specifications Building 262 Renovation 70LGLY27RSSB00001 AMD 0002.pdf: not read (access is restricted): request it on SAM.gov
- RFI 01 70LGLY27RSSB00001 Building 262 Renovation.pdf: not read (access is restricted): request it on SAM.gov
- Exhibit A - Proposal Breakdown.xls: not read (access is restricted): request it on SAM.gov
- Att 001 Statement of Work and Specifications Building 262 Renovation 70LGLY27RSSB00001.pdf: not read (access is restricted): request it on SAM.gov
- Att 002 SF25 Performance Bonds.pdf: not read (access is restricted): request it on SAM.gov
- Att 003 SF 25A Payment bonds -.pdf: not read (access is restricted): request it on SAM.gov
- Att 004 SF28 Affidavit of Individual Surety - Copy - Copy.pdf: not read (access is restricted): request it on SAM.gov
- Att 005 Format ILC -.pdf: not read (access is restricted): request it on SAM.gov
- Att 006 Format FIN INST ILC CONFIRM - Copy.pdf: not read (access is restricted): request it on SAM.gov
- Att 007 FMD_70 - Copy.pdf: not read (access is restricted): request it on SAM.gov
- Att 008 Instructions for Completing WH-347 - Copy.pdf: not read (access is restricted): request it on SAM.gov
- Att 009 WH 347 Wage and Hour Division - Copy.pdf: not read (access is restricted): request it on SAM.gov
- Att 010 FMD_42 - Copy.pdf: not read (access is restricted): request it on SAM.gov
- Att 013 USCIS Form I-9 Instructions for Employment.pdf: not read (access is restricted): request it on SAM.gov
- Att 014 Eligibility Verification Form.pdf: not read (access is restricted): request it on SAM.gov
- Att 015 Questionnaire for Non-Sensitive Positions.pdf: not read (access is restricted): request it on SAM.gov
- Att 016 Security Handout.pdf: not read (access is restricted): request it on SAM.gov
- Att 017 Security Training List.pdf: not read (access is restricted): request it on SAM.gov
- Att 019 Statement and Acknowledgment.pdf: not read (access is restricted): request it on SAM.gov
- Att 020 SF1444 Request for Authorization of Additional Classification and Rate.pdf: not read (access is restricted): request it on SAM.gov
- Att 022 SF LLL Disclosure of Lobbying Activities.pdf: not read (access is restricted): request it on SAM.gov
- Att 023 Financial Questionnaire.pdf: not read (access is restricted): request it on SAM.gov
- Att 024 700-3 Contractor Release Form.pdf: not read (access is restricted): request it on SAM.gov
- Att 025 WH DOL Poster.pdf: not read (access is restricted): request it on SAM.gov
- Att 026 Past Performance Questionnaire.pdf: not read (access is restricted): request it on SAM.gov
Full summary
What they want
- Renovate Building 262 at FLETC Glynco: all labor, materials, equipment and supervision
- Follow the statement of work and specifications, which are controlled documents (a signed non-disclosure agreement is needed to see them)
- Verify quantities, dimensions and site conditions in the field
- Move furniture, equipment and materials for access to the work, then put them back in their original places
- Send submittals no later than 14 calendar days after award
- Start work within 10 calendar days after the notice to proceed and finish within 425 calendar days of it, including final cleanup
- Work around occupants: the premises may be occupied during the work
- Contract type
- Single firm-fixed-price (FFP) construction contract
- Period of performance
- January 11, 2027 to March 11, 2028; complete within 425 calendar days after the notice to proceed
- Place of performance
- FLETC Glynco, Georgia (Building 262)
- Estimated value
- Not stated
- How they'll choose
- Best suited, then negotiate: the Government picks the best-suited firm on past performance, experience and price, and may then talk with that firm only. All non-price factors together are equal in importance to price. A satisfactory (or neutral) Past Performance rating and an Acceptable Corporate Relevant Experience rating are the minimum.
- Offers due
- December 2, 2026, 11:00 AM Eastern (from the version posted Nov 16, 2026; amended since)
What they'll judge offers on
- Past Performance: records pulled by the Government from the Past Performance Information Retrieval System (PPIRS) and related systems, up to three records, five years
- Corporate Relevant Experience: 2 to 4 past performance questionnaires (PPQs) for projects of at least $1,000,000, plus license(s) and a statement of professional credentials
- Price: reasonableness checked against historical pricing data and the Government's estimate
What to include when you submit
- Complete the offer (Standard Form 1442) and the bid schedule and proposal breakdown in Exhibit A
- Send 2 to 4 past performance questionnaires (Attachment 26) for projects of at least $1,000,000 each, completed within the last five years or at least 80% complete when the solicitation was issued
- At least two projects must be renovations with a scope like restroom plumbing fixture replacement, carpet, vinyl plank or tile flooring, interior or exterior painting, and door repairs
- Tab F2: copies of current contractor license(s) and a statement of professional credentials, including any certifications for restroom remodeling, painting, plumbing fixtures and flooring
- Show that the prime has at least 5 years of experience in commercial restroom remodeling, painting, plumbing fixture replacement or similar work
- Acknowledge each amendment (0001 through 0006) before the response due date
- Be registered in the System for Award Management (SAM.gov)
After award, you must have
- Payment and performance bonds, each for 100% of the contract price, delivered within 10 calendar days after notice of award From 70LGLY27RSSB00001 Amendment 0003 Request for Proposal Building 262 Renovation.pdf:
The Contractor shall be required to provide both payment…
Not in the notice text
- The statement of work and specifications, drawings, bid schedule (Exhibit A), bond forms, security forms and answers to questions (RFIs) are controlled documents attached on SAM.gov but not read here; a signed non-disclosure agreement is needed to get access.
- The middle of the solicitation (the proposal submission instructions, including how and where to send the offer) was left out of the text read here, so the submission method and any page limits are not known.
- The site visit sign-in sheet and the photos of the variable air volume (VAV) units are scanned files and were not read; the drawings are in a .zip file and were not read.
- Whether the site visit is mandatory is not stated in the text read.
- Security badging steps for workers (security forms, training list) are listed as attachments but were not read.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 16, 2026
- Notice type
- Solicitation
- Office
- FLETC Glynco Procurement Office, Brunswick, GA
- Product/service code
- Z2AA · Repair or Alteration of Office Buildings
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
11 versions have been posted, newest first.
- Nov 18, 2026 · AmendmentDue Dec 2, 2026
- Nov 16, 2026 · Amendment 0006 (this version)Due Dec 2, 2026 (changed)
- Nov 10, 2026 · AmendmentDue Nov 18, 2026
- Nov 3, 2026 · AmendmentDue Nov 18, 2026
- Oct 27, 2026 · AmendmentDue Nov 18, 2026 (changed)
- Oct 23, 2026 · AmendmentDue Nov 9, 2026
- Oct 21, 2026 · AmendmentDue Nov 9, 2026
- Oct 14, 2026 · AmendmentDue Nov 9, 2026
- Oct 9, 2026 · AmendmentDue Nov 9, 2026
- Oct 9, 2026 · AmendmentDue Nov 9, 2026
- Oct 9, 2026 · SolicitationDue Nov 9, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Seawater Pump RenovationThe National Oceanic and Atmospheric Administration (NOAA), part of the Department of Commerce, wants a small business to replace the salt water pump system and its wiring at its…
- Construction-NUWCDIVNPT-Interior RenovationsSolicitation N6660427Q0033: Naval Undersea Warfare Center Division Newport (NUWCDIVNPT) wants an interior renovation (the B68 Renovation Project) in Newport, RI, finished 120…
- Interior Office Renovation and Wall Removal - Offutt AFBSources sought notice FA7014-27-CP-0001 from the Department of the Air Force (55th Contracting Squadron) for market research only; it is not a solicitation.
- Design-Build Renovation of Building 164, Outdoor Recreation Center, Homestead Air Reserve Base, FloridaThe Department of the Air Force (contracting office FA6648 482 LSS LGC) wants a firm-fixed-price design-build contractor to renovate the Outdoor Recreation Center, Building 164,…
- RM16-1405 Building 592 RenovationsThis is set aside for 8(a) firms (small businesses in the SBA's 8(a) program), and the amendments point to a task order among holders of a Navy multiple award construction…