Solicitation
JB Charleston Multiple Award Construction Contract
Department of Defense · Department of the Air Force
AI summaryOnly HUBZone (Historically Underutilized Business Zone) or SDVOSB (service-disabled veteran-owned small business) firms can bid on this Air Force multiple award construction contract (MACC). Several winners will later compete for individual construction jobs (task orders), generally $1M to $30M, at Joint Base Charleston, SC and outlying sites. The response due date is October 28, 2026, 12:00 PM Eastern (an amendment moved it to Nov 2, 2026, 12:00 PM EST); total orders are capped at $400,000,000 over 5 years and 6 months, including options. More in the summary
A newer version of this notice was posted Oct 22, 2026. It moves the due date from Oct 28, 2026 to Nov 2, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of the version posted Oct 13, 2026. The notice was amended Oct 22, 2026. The due date moved from Oct 28, 2026 to Nov 2, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 38 of 50 attachments weren't read (Solicitation Attachment YS Seed Project Specifications_Mark Up.pdf, Solicitation Attachment YS Seed Project Specifications.pdf and 36 more). Check the attachments on SAM.gov.
Only HUBZone (Historically Underutilized Business Zone) or SDVOSB (service-disabled veteran-owned small business) firms can bid on this Air Force multiple award construction contract (MACC). Several winners will later compete for individual construction jobs (task orders), generally $1M to $30M, at Joint Base Charleston, SC and outlying sites. The response due date is October 28, 2026, 12:00 PM Eastern; total orders are capped at $400,000,000 over 5 years and 6 months, including options.
Who can bid (5)
- HUBZone or SDVOSB status: the acquisition is a small business set-aside open only to these two groups; an offeror needs certification in one of them, not both
- Small business under NAICS 236220 (size standard $45,000,000 in annual receipts)
- Offer guarantee and performance and payment bonds, figured from the Seed Project price; the form lists 10 calendar days after award for bonds
Show all 5Show fewer
- Recent, relevant past performance in the Southeast (SBA Region IV) on renovation or utility work, with questionnaires and partner consent letters
- Joint ventures must follow SBA guidance and the limits on subcontracting
How to submit: Electronically through DoD SAFE (a secure file drop). Email SSgt Lauren Parker (lauren.parker.4@us.af.mil), cc Contracting Officer Robert Melton (robert.melton.6@us.af.mil), to be added; access is valid for 14 days. No other delivery method is accepted, due October 28, 2026, 12:00 PM Eastern (EDT). What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (11)
- Serious: Only HUBZone or SDVOSB firms can bid. The competition is limited to HUBZone or service-disabled veteran-owned small businesses; other small businesses are not eligible.
- Serious: Offer guarantee and bonds tied to the Seed Project. A firm needs an offer guarantee and performance and payment bonds sized from the Seed Project price; the amounts and the form's yes/no boxes couldn't be read, so check the form on SAM.gov.
- Serious: Past performance only counts in the Southeast. Projects outside Alabama, Florida, Georgia, Kentucky, Mississippi, North Carolina, South Carolina and Tennessee are rated Not Relevant and not evaluated, which can sink an offer from a firm without local work.
Show all 11Show fewer
- Worth checking: SAM.gov shows no set-aside; the solicitation says HUBZone and SDVOSB. SAM.gov lists the set-aside as not stated, while the solicitation form says HUBZone and SDVOSB and Section C says HUBZone or SDVOSB; ask the contracting officer to confirm.
- Worth checking: Funds not yet available. No award will be made until funds are available and the Government may cancel before or after the closing date without paying offer costs.
- Worth checking: Must bid on 75% of task orders. Awardees that do not send responsive proposals on 75% of task order requests over twelve months can be removed from the MACC, and proposal costs are not repaid.
- Worth checking: Task order site visits required. After award, attending each task order's site visit is required unless the request says otherwise; skipping it makes that proposal non-responsive, and travel costs are not billed separately.
- Worth checking: Submission only through DoD SAFE with prior access request. Bidders must ask the contract specialist to add their email to DoD SAFE first, and that access lasts 14 days.
- Minor: Response due date moved to October 28, 2026. Amendment 0003 moved the response due date to October 28, 2026 from October 14, 2026; SAM.gov shows October 28, 2026, 12:00 PM Eastern.
- Minor: Past Performance volume capped at 50 pages. Pages over the limit are not read or evaluated, so a long list of projects must be kept tight.
- Minor: Statement of work shows a different solicitation number. The statement of work names a different solicitation number than the notice; ask the contracting officer which governs.
Read from the notice and 12 attachments. 38 of 50 not read. Show which files.
- Solicitation Amendment FA441826R00090003.pdf (read)
- Solicitation Amendment - FA441826R00090002.pdf (read)
- Solicitation Amendment FA441826R00090001.pdf (read)
- Solicitation - FA441826R0009.pdf (read)
- Statement of Work - JB CHS MACC.pdf (read)
- Statement of Work - Attachment 17 - 01 78 00 - Closeout Requirements.docx (read)
- Statement of Work - Attachment 16 - 01 45 00 - Quality Control.docx (read)
- Statement of Work - Attachment 15 - 01 35 26 - Governmental Safety Requirements.docx (read)
- Statement of Work - Attachment 14 - 01 35 26 - Attachment A Accident Investigation (CIRS).pdf (read)
- Statement of Work - Attachment 8 - 01 32 00 - Project Schedule.docx (read)
- Statement of Work - Attachment 6 - 01 32 00 - Attachment A - Schedule- Pay Calendar Example 1.pdf (read)
- Statement of Work - Attachment 5 - 01 30 00 - Administrative Requirements.docx (read)
- Solicitation Attachment YS Seed Project Specifications_Mark Up.pdf: not read (it couldn't be opened): open it on SAM.gov
- Solicitation Attachment YS Seed Project Specifications.pdf: not read (it couldn't be opened): open it on SAM.gov
- Statement of Work - Attachment 7 - 01 32 00 - Attachment A - Schedule-Pay Calendar Example 2.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Statement of Work - Attachment 4 - 01 14 00 - Work Restrictions.docx: not summarized: open it on SAM.gov
- Statement of Work - Attachment 3 - 01 11 00 - Summary of Work.docx: not summarized: open it on SAM.gov
- Statement of Work - Attachment 2 - Architectural Compatibility Plan.pdf: not summarized: open it on SAM.gov
- Statement of Work - Attachment 1 - JB Charleston Statement of Work for (A_E).pdf: not summarized: open it on SAM.gov
- Solicitation Attachment - B466 Mechanical RFIs.pdf: not summarized: open it on SAM.gov
- Solicitation Attachment - Hydrant Flow Test Data.pdf: not summarized: open it on SAM.gov
- Solicitation Attachment - Pre-Proposal Conference Slides 2026.pptx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Solicitation Attachment - Salvage Storage List.docx: not summarized: open it on SAM.gov
- Solicitation Attachment - Site Visit Sign-In Sheet.pdf: not summarized: open it on SAM.gov
- Solicitation Attachment XZ - Past Performance Project List.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Solicitation Attachment XY - On and Off-Ramp Procedures (1).pdf: not summarized: open it on SAM.gov
- Solicitation Attachment XX - Task Order Proposal Request (TOPR) Seed Project.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Solicitation Attachment XX - Task Order Proposal Request (TOPR) Seed Project.pdf: not summarized: open it on SAM.gov
- Solicitation Attachment XW - JB Charleston MACC Work Load Estimate.pdf: not summarized: open it on SAM.gov
- Solicitation Attachment XU - Past Performance Customer Questionnaire.pdf: not summarized: open it on SAM.gov
- Attachment YU - Seed Project Schedule B.pdf: not summarized: open it on SAM.gov
- Statement of Work - Attachment 13 - 01 33 00 - Submittal Procedures.docx: not summarized: open it on SAM.gov
- Statement of Work - Attachment 12 - 01 33 00 - Attachment D - Form 4289-R (RFI Register).pdf: not summarized: open it on SAM.gov
- Statement of Work - Attachment 12 - 01 33 00 - Attachment D - Form 4289-R (RFI Register).xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Statement of Work - Attachment 11 - 01 33 00 - Attachment C - Form 4288-R (Submittal Register).pdf: not summarized: open it on SAM.gov
- Statement of Work - Attachment 11 - 01 33 00 - Attachment C - Form 4288-R (Submittal Register).xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Statement of Work - Attachment 10 - 01 33 00 - Attachment B - JB CHS RFI Form.pdf: not summarized: open it on SAM.gov
- Statement of Work - Attachment 9 - 01 33 00 - Attachment A - JB CHS Transmittal Form 4025.pdf: not summarized: open it on SAM.gov
- Solicitation Attachment - 1999 As-Built Drawings_20260918.pdf: not summarized: open it on SAM.gov
- Solicitation Attachment - Geotechnical Report 14 April 2025.pdf: not summarized: open it on SAM.gov
- Solicitation Attachment YT Seed Project Drawings.pdf: not summarized: open it on SAM.gov
- Solicitation Attachment XV - Past Performance Survey.pdf: not summarized: open it on SAM.gov
- Solicitation Attachment XT - JB Charleston - Question and Answer Form.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attachment XT - JB Charleston Question and Answer Form (Completed).xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- B466 Photos.pdf: not summarized: open it on SAM.gov
- B464 Photos.pdf: not summarized: open it on SAM.gov
- Solicitation Attachment - Wage Determination NC20260012 - Wayne County.pdf: not summarized: open it on SAM.gov
- Solicitation Attachment - Wage Determination SC20260030 - Sumter County.pdf: not summarized: open it on SAM.gov
- Solicitation Attachment - Wage Determination SC20260022 - Berkeley County.pdf: not summarized: open it on SAM.gov
- Solicitation Attachment - Wage Determination SC20260023 - Charleston County.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Win a place on the MACC by sending a priced Seed Project (a sample job: Repair Dormitory B464, estimated at more than $10,000,000) and past performance information
- After award, compete for task orders: new construction, repair, alteration and demolition of buildings, structures, roads, grounds and utilities, sometimes design-build (one firm designs and builds)
- Supply all labor, equipment, materials, transportation, supervision and testing for each task order
- Send responsive proposals on 75% of task order proposal requests over a twelve month period, or risk removal from the MACC
- Attend task order site visits, which are required unless a request says otherwise
- Attend the post-award orientation; each awardee receives a $3,000 Post-Award Orientation Task Order as the minimum guarantee
- On design-build orders, finish the design up to 100% and join design reviews at Joint Base Charleston
- Follow the Army Corps of Engineers safety manual EM 385-1-1 and base badging and flightline access rules
- Contract type
- Firm-fixed-price (FFP: one set price, whatever the work ends up costing) multiple award construction contract (MACC), with task orders issued through task order proposal requests (TOPRs)
- Period of performance
- Base period, four option periods and an option to extend services; task orders are capped over 5 years and 6 months as extended through options. The length of each period is not stated in the text read
- Place of performance
- Joint Base Charleston - Air Base, Charleston, SC; Joint Base Charleston - Naval Weapons Station, Goose Creek, SC; Short Stay Recreational Area, Moncks Corner, SC; Defense Fuel Supply Point, Charleston, SC. Outlying areas: North Auxiliary Airfield, North, SC; Seymour Johnson AFB, Goldsboro, NC; Shaw AFB, Sumter, SC
- Estimated value
- Maximum of all task orders: $400,000,000 over 5 years and 6 months, as extended through options. Task orders are generally $1M to $30M. Seed Project estimated at more than $10,000,000
- How they'll choose
- Trade-off procedures (best value, not lowest price alone) under Sections L and M. Seed Project price is evaluated first, then past performance, starting with the lowest-priced offer. How price and past performance are weighed against each other is not shown in the text read
- Offers due
- October 28, 2026, 12:00 PM Eastern (EDT) (from the version posted Oct 13, 2026; amended since)
- How to submit
- Electronically through DoD SAFE (a secure file drop). Email SSgt Lauren Parker (lauren.parker.4@us.af.mil), cc Contracting Officer Robert Melton (robert.melton.6@us.af.mil), to be added; access is valid for 14 days. No other delivery method is accepted
- Page limits
- Part II, Past Performance Information: 50 pages (Past Performance Customer Questionnaires are not counted). Page limit for Part I, the Seed Project price proposal, is not shown in the text read
What they'll judge offers on
- Factor 1, Seed Project Price: price proposal for the sample project (Repair Dormitory B464)
- Factor 2, Past Performance: recent and relevant work, rated Substantial, Satisfactory, Neutral, Limited or No Confidence; recent means one day of performance within five years of the solicitation release; only work in SBA Region IV (Alabama, Florida, Georgia, Kentucky, Mississippi, North Carolina, South Carolina, Tennessee) counts as relevant; reviewed from the lowest price upward until nine offerors are rated Substantial Confidence or all are reviewed
What to include when you submit
- Send a complete, signed original proposal in two parts: Part I, Factor 1, Seed Project Price Proposal; Part II, Factor 2, Past Performance Information
- List no more than fifteen (15) contracts from the last five years: no more than ten (10) mainly existing-building whole renovation, no more than five (5) mainly utility infrastructure repair or construction, and no more than two (2) design-build
- Past performance projects must be located in SBA Region IV (Alabama, Florida, Georgia, Kentucky, Mississippi, North Carolina, South Carolina, Tennessee); projects outside it are rated Not Relevant
- For each project give: prime contractor, CAGE code, unique entity ID, your role, contract number, contract type, kind of work, period, place, initial and final price, completion dates, description, relevance, and client and contracting officer contacts
- Include a completed Past Performance Questionnaire for each project; if a client has not finished one, send its first page (contract and client information)
- Send a consent letter from each teaming partner, joint venture partner and major subcontractor allowing release of their past performance information to the prime
- Teaming or joint venture offers must describe each firm's responsibilities and contract relationships; joint ventures must follow SBA guidance and the limits on subcontracting
- Send any exception to the solicitation terms, with the reason, five (5) business days before the closing date
- Format: 8.5 by 11 inch pages (fold-outs up to 11 by 17 inches), type no smaller than 12 pitch; offers stay valid for 180 days
- Offer guarantee and bond amounts are figured from the Seed Project price (CLINs 0001, 0002 and 0003 for Repair Dormitory B464)
- Acknowledge each amendment; the offer form lists Amendments 0001 and 0002, and Amendment 0003 extends the response due date
Not in the notice text
- Much of the solicitation was not read: the middle of the solicitation (after Section E, including the rest of Sections L and M) was cut, and the Seed Project specifications and drawings, task order request seed project, workload estimate, on and off-ramp procedures, past performance forms, Q&A answers, wage determinations and other files are attached on SAM.gov but not read
- How many MACC awards the Government plans is not stated in the text read
- Whether the Davis-Bacon Act (federal construction wage law) applies is not stated in the text read; wage determinations for Charleston, Berkeley and Sumter counties, SC and Wayne County, NC are attached but not read
- Whether an offer guarantee and bonds are required, and their amounts, is not clear because the form's checkboxes couldn't be read; check the form on SAM.gov
- How much more important price or past performance is, and the page limit for the Seed Project price proposal, are not shown in the text read
- The length of the base period and each option period is not stated in the text read
Eligibility and how to respond
- No set-aside: any business, large or small, can bid unless the notice says otherwise.
- How to submit, from the AI summary: Electronically through DoD SAFE (a secure file drop). Email SSgt Lauren Parker (lauren.parker.4@us.af.mil), cc Contracting Officer Robert Melton (robert.melton.6@us.af.mil), to be added; access is valid for 14 days. No other delivery method is accepted. Check it in the notice before you send anything.
- Construction contracts over $2,000 pay at least the local Davis-Bacon wage rates, from the wage determination in the solicitation. Price your labor from it: How to price a government contract, and how Davis-Bacon differs from the Service Contract Act.
Notice details
- Posted
- Oct 13, 2026
- Notice type
- Solicitation
- Office
- FA4418 628 CONS PK, JB Lindsey Graham, SC
- Product/service code
- Y1JZ · Construction of Miscellaneous Buildings
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
7 versions have been posted, newest first.
- Oct 22, 2026 · AmendmentDue Nov 2, 2026 (changed)
- Oct 13, 2026 · Amendment 0004 (this version)Due Oct 28, 2026
- Oct 9, 2026 · AmendmentDue Oct 28, 2026 (changed)
- Sep 18, 2026 · AmendmentDue Oct 14, 2026
- Sep 17, 2026 · AmendmentDue Oct 14, 2026 (changed)
- Aug 17, 2026 · AmendmentDue Sep 21, 2026
- Jul 23, 2026 · SolicitationDue Sep 21, 2026
- Attachments
Past awards and competition
Who has won work like this before, the likely incumbent, and what similar contracts paid, from USAspending.gov.
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation