JB Charleston Multiple Award Construction Contract
Dept of Defense · Dept of the Air Force · Sol. FA441826R0009
Track this notice by email. We'll email you if it's amended or awarded, and a week and two days before responses are due.
AI summary Beta
Some details weren't available to this summary, so it may miss requirements. Check the attachments on SAM.gov.
The Air Force (628th Contracting Squadron, Joint Base Charleston, SC) wants to award a multiple-award, firm-fixed-price construction contract (JB CHS MACC 2.0) for repair, renovation, utility and design-build work at Joint Base Charleston and nearby bases. All task orders together can reach $400 million over about 5.5 years, and individual task orders are generally $1M to $30M. Bidders first compete on a single "seed project" (repair of Dormitory B464, over $10 million) and then compete for task orders. Proposals are now due 28 October 2026.
Watch out for
- Set-aside conflict between SAM listing and documents. The SAM listing shows no set-aside, but the latest amendment limits the competition to HUBZone or SDVOSB firms (the original solicitation said total small business), so confirm your eligibility with the Contracting Officer before spending time on a bid.
This acquisition is set aside for HUBZone or SDVOSB
- Large seed project with offer guarantee and bonds. You must price and be ready to bond a seed project over $10 million just to get onto the contract, which is a big hurdle for a small firm's bonding capacity.
The estimated amount of the Seed Project is: More than $10,000,000.
- Past performance must be local, recent and large. Only projects in the Southeast Region within the last five years count; work outside it is rated Not Relevant, and the most relevant projects are $1M-$30M renovation or utility jobs.
Past Performance submitted for projects occurring outside the SE Region will be evaluated as Not Relevant.
- Funds not yet available. No award will be made until funds are available, and the Government may cancel before or after the closing date without paying proposal costs.
FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS EFFORT.
- Must bid on most task orders. Awardees can be removed from the contract if they do not respond to 75% of task order requests over 12 months, and task order proposals are unpaid.
Contractors are required to submit responsive proposals on 75% of Task Order Proposal Requests (TOPRs)
- Task order site visits expected to be mandatory. Skipping a required site visit makes your task order proposal non-responsive, and travel costs are not billed separately.
Site Visit attendance shall be required for Task Order Proposal Submission unless otherwise specified.
- Terms changed across amendments. The due date moved from 21 Sep to 14 Oct to 28 Oct, the set-aside and task order range ($25M to $30M) changed, and Amendment 003 itself was not provided, so check SAM.gov for the latest documents.
Read from the notice and 12 attachments. 37 not read in full.
- Solicitation Amendment - FA441826R00090002.pdf
- Solicitation Amendment FA441826R00090001.pdf
- Solicitation - FA441826R0009.pdf
- Statement of Work - JB CHS MACC.pdf
- Statement of Work - Attachment 17 - 01 78 00 - Closeout Requirements.docx
- Statement of Work - Attachment 16 - 01 45 00 - Quality Control.docx
- Statement of Work - Attachment 15 - 01 35 26 - Governmental Safety Requirements.docx
- Statement of Work - Attachment 14 - 01 35 26 - Attachment A Accident Investigation (CIRS).pdf
- Statement of Work - Attachment 8 - 01 32 00 - Project Schedule.docx
- Statement of Work - Attachment 6 - 01 32 00 - Attachment A - Schedule- Pay Calendar Example 1.pdf
- Statement of Work - Attachment 5 - 01 30 00 - Administrative Requirements.docx
- Statement of Work - Attachment 4 - 01 14 00 - Work Restrictions.docx
- Solicitation Attachment YS Seed Project Specifications_Mark Up.pdf: too large
- Solicitation Attachment YS Seed Project Specifications.pdf: too large
- Statement of Work - Attachment 7 - 01 32 00 - Attachment A - Schedule-Pay Calendar Example 2.xlsx: spreadsheet: not read yet
- Statement of Work - Attachment 3 - 01 11 00 - Summary of Work.docx: over the file limit for one brief
- Statement of Work - Attachment 2 - Architectural Compatibility Plan.pdf: over the file limit for one brief
- Statement of Work - Attachment 1 - JB Charleston Statement of Work for (A_E).pdf: over the file limit for one brief
- Solicitation Attachment - B466 Mechanical RFIs.pdf: over the file limit for one brief
- Solicitation Attachment - Hydrant Flow Test Data.pdf: over the file limit for one brief
- Solicitation Attachment - Pre-Proposal Conference Slides 2026.pptx: .pptx files aren't read yet
- Solicitation Attachment - Salvage Storage List.docx: over the file limit for one brief
- Solicitation Attachment - Site Visit Sign-In Sheet.pdf: over the file limit for one brief
- Solicitation Attachment XZ - Past Performance Project List.xlsx: spreadsheet: not read yet
- Solicitation Attachment XY - On and Off-Ramp Procedures (1).pdf: over the file limit for one brief
- Solicitation Attachment XX - Task Order Proposal Request (TOPR) Seed Project.xlsx: spreadsheet: not read yet
- Solicitation Attachment XX - Task Order Proposal Request (TOPR) Seed Project.pdf: over the file limit for one brief
- Solicitation Attachment XW - JB Charleston MACC Work Load Estimate.pdf: over the file limit for one brief
- Solicitation Attachment XU - Past Performance Customer Questionnaire.pdf: over the file limit for one brief
- Attachment YU - Seed Project Schedule B.pdf: over the file limit for one brief
- Statement of Work - Attachment 13 - 01 33 00 - Submittal Procedures.docx: over the file limit for one brief
- Statement of Work - Attachment 12 - 01 33 00 - Attachment D - Form 4289-R (RFI Register).pdf: over the file limit for one brief
- Statement of Work - Attachment 12 - 01 33 00 - Attachment D - Form 4289-R (RFI Register).xlsx: spreadsheet: not read yet
- Statement of Work - Attachment 11 - 01 33 00 - Attachment C - Form 4288-R (Submittal Register).pdf: over the file limit for one brief
- Statement of Work - Attachment 11 - 01 33 00 - Attachment C - Form 4288-R (Submittal Register).xlsx: spreadsheet: not read yet
- Statement of Work - Attachment 10 - 01 33 00 - Attachment B - JB CHS RFI Form.pdf: over the file limit for one brief
- Statement of Work - Attachment 9 - 01 33 00 - Attachment A - JB CHS Transmittal Form 4025.pdf: over the file limit for one brief
- Solicitation Attachment - 1999 As-Built Drawings_20260918.pdf: over the file limit for one brief
- Solicitation Attachment - Geotechnical Report 14 April 2025.pdf: over the file limit for one brief
- Solicitation Attachment YT Seed Project Drawings.pdf: over the file limit for one brief
- Solicitation Attachment XV - Past Performance Survey.pdf: over the file limit for one brief
- Solicitation Attachment XT - JB Charleston - Question and Answer Form.xlsx: spreadsheet: not read yet
- Attachment XT - JB Charleston Question and Answer Form (Completed).xlsx: spreadsheet: not read yet
- B466 Photos.pdf: over the file limit for one brief
- B464 Photos.pdf: over the file limit for one brief
- Solicitation Attachment - Wage Determination NC20260012 - Wayne County.pdf: over the file limit for one brief
- Solicitation Attachment - Wage Determination SC20260030 - Sumter County.pdf: over the file limit for one brief
- Solicitation Attachment - Wage Determination SC20260022 - Berkeley County.pdf: over the file limit for one brief
- Solicitation Attachment - Wage Determination SC20260023 - Charleston County.pdf: over the file limit for one brief
Full brief
What they want
- Build, repair, alter and demolish buildings, roads, grounds and utilities as individual task orders
- Design-build work from concept up to 100% design when a task order calls for it
- Win the seed project (repair of Dormitory B464) to get on the MACC
- Furnish all labor, materials, equipment, transportation, supervision and testing for each task order
- Run multiple projects at the same time and attend the Post-Award Orientation
- Answer at least 75% of task order proposal requests (TOPRs) each year to stay on the contract
- Attend site visits for task orders (assume they are mandatory)
- Contract type
- Firm-fixed-price multiple award construction contract (MACC) with task orders; negotiated (RFP), trade-off procedures
- Period of performance
- Base period plus Option Periods 1 to 4 and an option to extend services (Option Period 5); the solicitation says task orders run over 5 years and 6 months if options are exercised. Length of each period is not shown in the text provided.
- Place of performance
- Joint Base Charleston (Air Base and Naval Weapons Station), Short Stay Recreational Area (Moncks Corner) and Defense Fuel Supply Point in South Carolina; outlying areas include North Auxiliary Airfield SC, Seymour Johnson AFB NC and Shaw AFB SC (no more than 10% of task orders)
- Estimated value
- Ceiling of $400,000,000 for all task orders; task orders generally $1M to $30M; seed project more than $10,000,000. Minimum guarantee is a $3,000 Post-Award Orientation task order per awardee.
- How they'll choose
- Trade-off (best value) procedures. Offers are evaluated on Seed Project price and past performance; past performance is reviewed in ascending order of price.
- Offers due
- 28 October 2026 at 12:00 PM EDT (extended by Amendment 003)
- How to submit
- Electronically through DoD SAFE only. Non-DoD offerors must first email lauren.parker.4@us.af.mil (cc robert.melton.6@us.af.mil) to be granted drop-off access, which is valid for 14 days.
- Page limits
- Past Performance part is limited to 50 pages (questionnaires do not count); pages over the limit are not read. Letter size paper, 12 pitch type minimum. Page limit for the price part is not shown.
What they'll judge offers on
- Factor 1 - Seed Project Price Proposal (repair of Dormitory B464)
- Factor 2 - Past Performance (performance confidence rating; recent within 5 years, relevant, and located in the Southeast Region)
What to include when you submit
- Proposal has two parts: Part I Factor 1 Seed Project Price Proposal and Part II Factor 2 Past Performance Information
- Proposals stay valid for 180 days
- Do not zip files when sending revisions through DoD SAFE; ask for a confirmation email and follow up if none arrives
- Past performance projects must be in the Southeast Region (AL, FL, GA, KY, MS, NC, SC, TN) and completed within 5 years
- The text limits the mix of the 15 past performance contracts: no more than 10 whole-building renovation, 5 utility, and 2 design-build
- Send Past Performance Questionnaires for each project (or at least the first page) with the proposal
- Teaming partners and joint venture partners must give signed consent letters allowing release of their past performance
- Raise any exception to the solicitation terms with a rationale five business days before the closing date
- Acknowledge each amendment in the offer
You must have
- Must qualify as a HUBZone or service-disabled veteran-owned small business (SDVOSB); you do not need both certifications
This acquisition is set aside for HUBZone or SDVOSB
- Small business under NAICS 236220 (size standard $45 million in average annual receipts)
NAICS Code: 236220 Size Standard: $45,000,000
- Offer guarantee plus performance and payment bonds are tied to the seed project price
Offer Guarantee and Bond Requirements: The proposed price, for the purpose of the offer guarantee
- Joint ventures and teams must follow SBA rules and the limits on subcontracting
performance requirements of 13 CFR 124.513(d) and RFO 52.219-14, Limitations On Subcontracting, as applicable.
- Minimum insurance, including general liability, auto liability, workers' compensation and employer's liability
Comprehensive general liability: $500,000 per occurrence
- A superintendent with at least 5 years of similar experience who must be approved by the Contracting Officer before work starts
Superintendent must have a minimum of 5 years experience as a project manager, project engineer, superintendent, or quality control manager
Not in the notice text
- How much more important price is than past performance (Section M middle was cut off in the text provided)
- Lengths of the base period and each option period
- Whether performance and payment bonds are required for the MACC itself and the exact offer guarantee amount (form check boxes did not come through)
- Seed project price schedule, specifications, drawings and TOPR (listed as attachments but not readable here)
- Wage determinations for Davis-Bacon type pay rates (attached but not read)
- Answers to offeror questions posted after the August 2026 site visit and conference slides (not read)
- Text of Amendment 003 beyond the new due date
FedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Response due
- Oct 28, 2026, 4:00 PM UTC
- Posted
- Oct 9, 2026
- Notice type
- Solicitation
- Solicitation
- FA441826R0009
- Agency
- Dept of Defense · Dept of the Air Force
- Office
- FA4418 628 Cons PK
- NAICS
- 236220
- Product/service code
- Y1JZ
- Business type
- Construction & renovation
- Place of performance
- 0, SC, 29404
- Contracting contact
- Daniel Teeterdaniel.teeter@us.af.mil8439637744
- Versions
- 5 (amended since first posted)
What similar contracts paid
291 contracts at this agency under the same NAICS code, in the same state, had activity in the last 5 years, according to USAspending.gov. Small businesses won 71% of the dollars in this market over the last 3 fiscal years.
Before you respond
Full notice text from SAM.gov
Similar open opportunities
- Trade and Cargo AcademyThe Army Corps of Engineers Charleston District wants a contractor to build a Trade and Cargo Academy and a Cargo Security and Seized Property Training Facility at the Federal…
- FCKY UEPH Barracks CM@RiskThe Army Corps of Engineers (Louisville District) is doing market research for construction of Unaccompanied Enlisted Personnel Housing (barracks) at Fort Campbell, KY, using a…
- Lease Fit-Out Construction in Nuuk, Greenland - Sources Sought/Market ResearchThe U.S. Department of State (Bureau of Overseas Buildings Operations) is doing market research for a construction contract to fit out three floors of a leased, occupied building…
- Fort Lee Vehicle Recovery RangeThe Army Corps of Engineers (Norfolk District) wants a contractor to build 24 concrete turning pads with site drainage and road alignment and repair at Fort Lee, Virginia.
- FY28 KC-46A Aircraft Beddown Infrastructure Program | Altus AFB, OklahomaThe U.S. Army Corps of Engineers, Tulsa District wants a design-build team for a roughly $235M program at Altus Air Force Base, Oklahoma.