Combined Synopsis/Solicitation
Garage Drywall Demolition at Udall Building
Department of the Interior
Small business set-aside · DC
A newer version of this notice was posted Nov 20, 2026. It moves the due date from Dec 2, 2026 to Dec 11, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of the version posted Nov 17, 2026. The notice was amended Nov 20, 2026. The due date moved from Dec 2, 2026 to Dec 11, 2026. Check what else changed on SAM.gov.
Solicitation 140D0427Q0949 is a total small business set-aside from the Department of the Interior (Interior Business Center) to tear down drywall ceiling bulkheads in two parking garages (A/B and C/D/G ramps) at the Stewart Lee Udall Building, 1849 C Street NW, Washington, DC. It is a firm-fixed-price (FFP: one set price, whatever the work ends up costing) job with two priced lines, to be done within 90 days of the notice to proceed. The Government will pick the lowest price that passes the technical review (LPTA: lowest price technically acceptable). The response due date is December 2, 2026, 12:00 PM Eastern.
Who can bid (4)
- Total small business set-aside: only small businesses can bid; NAICS 238910 size standard is $19 million From Sol_140D0427Q0949_Amd_0002.pdf
- Bid bond (SF 24) submitted with the quote, reviewed for completeness and acceptability From Sol_140D0427Q0949_Amd_0002.pdf
- Firm or principal specializing in this kind of work with at least 5 years of documented successful experience From Sol_140D0427Q0949_Amd_0002.pdf
Show all 4Show fewer
- Representations and certifications completed in SAM.gov, verified by the Government From Sol_140D0427Q0949_Amd_0002.pdf
How to submit: Email to Contracting Officer nicholas_lewicki@ibc.doi.gov and Contract Specialist halazzawi@ibc.doi.gov, due December 2, 2026, 12:00 PM Eastern. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (10)
- Serious: Small business set-aside. Only small businesses under the $19 million size standard for NAICS 238910 can bid. From Sol_140D0427Q0949_Amd_0002.pdf
- Serious: Bid bond (SF 24) reviewed with the quote. A missing or unacceptable bid guarantee can get the quote rejected, and a business needs a surety (bond company) to issue it. The bid guarantee amount is left blank in the form. From Sol_140D0427Q0949_Amd_0002.pdf
- Serious: Site walk-through: statement of work says the prime must attend. The statement of work says the prime contractor must attend an onsite walk-through, while the site visit clause only says vendors are urged and expected to inspect the site; ask which applies. From Sol_140D0427Q0949_Amd_0002.pdf
Show all 10Show fewer
- Worth checking: Davis-Bacon wage rule applies. This is construction work, so workers must be paid at least the Davis-Bacon wage determination rates. From Sol_140D0427Q0949_Amd_0002.pdf
- Worth checking: Work only outside business hours. All work must happen at night or on weekends, which can raise labor cost. From Sol_140D0427Q0949_Amd_0002.pdf
- Worth checking: Building access takes advance paperwork. After-hours work needs an access list approved ahead of time, and every worker needs a REAL ID. From Sol_140D0427Q0949_Amd_0002.pdf
- Worth checking: Two completion periods given. The statement of work gives 90 days from notice to proceed, while Section F gives three months after contract award; ask which one governs. From Sol_140D0427Q0949_Amd_0002.pdf
- Worth checking: Price must cover every cost. The Government will not add money after award for costs left out of the price, including taxes and duties. From Sol_140D0427Q0949_Amd_0002.pdf
- Minor: Response due date moved to December 2, 2026, 12:00 PM Eastern. Amendment 0001 extended the response due date from November 19, 2026, 2:00 PM Eastern; the notice text still shows both dates.
- Minor: The site visit was Nov 19, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From Sol_140D0427Q0949_Amd_0002.pdf
Read from the notice and 3 attachments. Show which files.
- Sol_140D0427Q0949_Amd_0002.pdf (read)
- Sol_140D0427Q0949_Amd_0001.pdf (read)
- Sol_140D0427Q0949.pdf (read)
Full summary
What they want
- CLIN 0001 (contract line item number: one priced line), Ramp A/B garage: demolish about 1500 linear feet of drywall bulkheads, including drywall and metal studs
- CLIN 0002, Ramp C/D/G garage: demolish about 6000 linear feet of drywall bulkheads, including drywall and metal studs
- Before demolition, support conduit and junction boxes from the ceiling: about 20 boxes and 100 linear feet of conduit in A/B, about 80 boxes and 400 linear feet in C/D/G
- Patch ceiling holes and paint to match; scrape and repaint peeling pipe paint (about 250 linear feet in A/B, 1000 in C/D/G; fire sprinkler piping excluded)
- Patch damaged pipe insulation (about 50 linear feet in A/B, 200 in C/D/G)
- Work only outside business hours (6 AM to 8 PM Monday through Friday); remove all debris daily
- HEPA (high-efficiency particulate air) vacuum and wet scrub the garage floor: at the end of the work in A/B, and at the end of each workday in C/D/G
- Keep a prime contractor supervisor on site at all times; write a health and safety plan (HASP)
- Contract type
- Firm-fixed-price (FFP), two lines of 1 job each
- Period of performance
- 90 days from notice to proceed (statement of work); Section F says all work, including cleanup, is finished three months after contract award
- Place of performance
- Stewart Lee Udall Building, 1849 C Street NW, Washington, DC 20240
- Remote work
- No. From Sol_140D0427Q0949_Amd_0002.pdf:
Work shall be performed onsite at the Stewart Lee Udall Building…
- Estimated value
- Not stated
- How they'll choose
- Lowest price technically acceptable (LPTA), award without discussions unless the contracting officer decides they are needed
- Offers due
- December 2, 2026, 12:00 PM Eastern (from the version posted Nov 17, 2026; amended since)
- How to submit
- Email to Contracting Officer nicholas_lewicki@ibc.doi.gov and Contract Specialist halazzawi@ibc.doi.gov
- Page limits
- Technical quote: 5 pages maximum, not counting the draft QCP and draft CMP
What they'll judge offers on
- Technical: understanding of, approach to and ability to meet the requirements, including demonstrated five years of experience, a tentative project schedule, and a draft quality control plan (QCP) and draft contractor management plan (CMP)
- Price: must be fair and reasonable; given as a total cost
- Other documentation: SF 1442 reviewed for completeness; amendments reviewed for timely acknowledgment; SF 24 bid bond reviewed for completeness and acceptability; Section K representations and certifications checked in SAM.gov
What to include when you submit
- Submit the quote on Standard Form 1442 (SF 1442): the form you sign and return as your offer.
- Technical part: show your approach to the statement of work, demonstrate five years of experience, and include a tentative schedule for the project.
- Attach a draft quality control plan (QCP) and a draft contractor management plan (CMP: staffing, work management, quality control, communication, facility considerations); neither counts toward the page limit.
- Price part: give the price as a total cost for the two lines.
- Include the SF 24 bid bond (bid guarantee).
- Acknowledge receipt of Amendments 0001 and 0002.
- State on the SF 1442 how long the quote is valid, and say so in the quote.
- Keep representations and certifications current in SAM.gov; they are checked there.
- Questions go in writing by email; no phone calls are answered.
After award, you must have
- A prime contractor supervisor on site whenever work is done, able to talk with the Contracting Officer's Representative (COR) in written and spoken English From Sol_140D0427Q0949_Amd_0002.pdf:
At least one Prime Contractor employee must be onsite in a supervisory capacity any time work…
Not in the notice text
- The Government's questions and answers amendment was promised but is not in the documents read.
- The bid guarantee amount and the quote validity period are blank or unreadable in the forms; check the SF 1442 and clause 52.228-1 on SAM.gov.
- Whether performance and payment bonds are required after award is not readable on the SF 1442; check the form on SAM.gov.
- The middle of each attached solicitation file (about 15,000 characters of clauses) was left out of the text read here.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 17, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- Ibc Acq SVCS Directorate (00004), Herndon, VA
- Product/service code
- Z2AA · Repair or Alteration of Office Buildings
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 238910)
- Versions
4 versions have been posted, newest first.
- Nov 20, 2026 · Amendment 0003Due Dec 11, 2026 (changed)
- Nov 17, 2026 · Amendment 0002 (this version)Due Dec 2, 2026
- Nov 13, 2026 · Amendment 0001Due Dec 2, 2026 (changed)
- Nov 4, 2026 · Combined Synopsis/SolicitationDue Nov 19, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Demolition of an existing building, Site Improvements and construction of a Modular Office Building at the US Merchant Marine Academy Campus, Kings Point, NYThe U.S. Army Corps of Engineers New York District is seeking sealed bids (an invitation for bid, IFB) to demolish an existing building and build a new modular office of about…
- Project Number 657-507, Correct Seismic Deficiencies for Building 14, Marion VAMC, Illinois Construction of New Boiler Plant and Demolition of ExistingSolicitation 36C10F26R0085: only Veterans Affairs-verified service-disabled veteran-owned small businesses listed in VA's Vendor Information Pages (VIP) database can bid.