Combined Synopsis/Solicitation
Garage Drywall Demolition at Udall Building
Department of the Interior
Small business set-aside · DC
A newer version of this notice was posted Nov 20, 2026. It moves the due date from Dec 2, 2026 to Dec 11, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of the version posted Nov 13, 2026. The notice was amended Nov 20, 2026. The due date moved from Dec 2, 2026 to Dec 11, 2026. Check what else changed on SAM.gov.
The Department of the Interior's Interior Business Center (solicitation 140D0427Q0949) wants a contractor to demolish drywall bulkheads (hanging drywall boxes) in the garages of the Stewart Lee Udall Building at 1849 C Street NW, Washington, DC. It is a total small business set-aside, priced as two firm-fixed-price jobs and awarded on lowest price technically acceptable, with a response due date of December 2, 2026, 12:00 PM Eastern.
Who can bid (4)
- Small business under NAICS 238910 Site Preparation Contractors (size standard $19 million); this is a total small business set-aside
- At least five years of documented successful experience in this kind of work From Sol_140D0427Q0949_Amd_0001.pdf
- Bid bond (SF-24) with the quote; Section M says it is reviewed for completeness and acceptability From Sol_140D0427Q0949_Amd_0001.pdf
Show all 4Show fewer
- Registered in the System for Award Management (SAM); representations and certifications are checked there From Sol_140D0427Q0949_Amd_0001.pdf
How to submit: Email to Contracting Officer Nicholas Lewicki (nicholas_lewicki@ibc.doi.gov) and Contract Specialist Haider Al Azzawi (halazzawi@ibc.doi.gov), on Standard Form 1442 (SF 1442, the construction solicitation and offer form), due December 2, 2026, 12:00 PM Eastern. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (10)
- Serious: Bid bond required, amount not stated. Section M reviews an SF-24 bid bond, and the bid guarantee provision leaves the percentage and dollar amount blank, so ask the contracting officer what amount is needed before you can price it. From Sol_140D0427Q0949_Amd_0001.pdf
- Worth checking: Performance and payment bonds clause included. The clause list includes bonds for construction contracts; the SF 1442 form in the files doesn't show whether bonds are required after award, so confirm with the contracting officer. From Sol_140D0427Q0949_Amd_0001.pdf
- Worth checking: Date passed (May 18, 2026): Davis-Bacon wage rules apply. Construction wage determination DC20260002 Modification 3, dated May 18, 2026, applies, so pay at least those rates and keep payroll records. From Sol_140D0427Q0949_Amd_0001.pdf
Show all 10Show fewer
- Worth checking: The site visit was Nov 9, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From Sol_140D0427Q0949_Amd_0001.pdf
- Worth checking: Work only outside business hours. Business hours are 6 AM to 8 PM Monday through Friday, so work happens at night or on weekends, and after-hours access needs an approved list. From Sol_140D0427Q0949_Amd_0001.pdf
- Worth checking: Access lists needed before work. For after-hours work an access list must reach the COR and Security 3 business days ahead, and 5 business days ahead for sensitive areas, with no swapping of listed workers. From Sol_140D0427Q0949_Amd_0001.pdf
- Worth checking: Performance period stated two ways. The statement of work gives 90 days from Notice to Proceed while Section F requires completion three months after award; ask which governs. From Sol_140D0427Q0949_Amd_0001.pdf
- Worth checking: Limits on subcontracting. The Limitations on Subcontracting clause is included, which caps how much of the work a small business prime may pass to subcontractors; the prime must also supervise on site whenever a subcontractor works. From Sol_140D0427Q0949_Amd_0001.pdf
- Minor: Tight access and parking. Parking is for up to two vehicles, vehicle size and height are limited, and the Ramp D loading dock is open 7:30 AM to 4:30 PM Monday through Friday only after COR coordination. From Sol_140D0427Q0949_Amd_0001.pdf
- Minor: Questions were due Nov 10, 2026. Check the amendments for the agency's answers.
Read from the notice and 2 attachments. Show which files.
- Sol_140D0427Q0949_Amd_0001.pdf (read)
- Sol_140D0427Q0949.pdf (read)
Full summary
What they want
- CLIN 0001, Ramp A/B garage: demolish about 1500 linear feet of drywall and metal-stud bulkheads (a contract line item number, CLIN, is one priced line of the order)
- CLIN 0002, Ramp C/D/G garage: demolish about 6000 linear feet of drywall and metal-stud bulkheads
- Before demolition, support from the ceiling the conduit, junction boxes and devices hanging on the bulkheads: about 20 junction boxes and 100 linear feet of conduit in A/B, about 80 junction boxes and 400 linear feet in C/D/G
- Patch ceiling holes and paint to match; scrape and repaint peeling pipe paint (about 250 linear feet in A/B, 1000 in C/D/G, fire sprinkler piping excluded)
- Patch damaged fiberglass pipe insulation: about 50 linear feet in A/B and 200 linear feet in C/D/G
- Work outside business hours and remove all debris daily; it becomes the contractor's property
- Finish with HEPA-filter vacuuming and wet scrubbing of the floor: whole garage at the end in A/B, work area at the end of each workday in C/D/G
- Write and follow a quality control plan (QCP), a management plan and a health and safety plan (HASP)
- Contract type
- Firm-fixed-price (FFP): one set price, whatever the work ends up costing; two lines at 1 job each
- Period of performance
- Base period of 90 days from Notice to Proceed (NTP) in the statement of work; Section F says all work finished three months after contract award
- Place of performance
- Stewart Lee Udall Building (Department of the Interior headquarters), 1849 C Street NW, Washington, DC 20240
- Remote work
- No. From Sol_140D0427Q0949_Amd_0001.pdf:
Work shall be performed onsite at the Stewart Lee Udall Building…
- Estimated value
- Not stated
- How they'll choose
- Lowest price technically acceptable (LPTA): the lowest-priced quote that meets the technical requirements wins
- Offers due
- December 2, 2026, 12:00 PM Eastern (from the version posted Nov 13, 2026; amended since)
- How to submit
- Email to Contracting Officer Nicholas Lewicki (nicholas_lewicki@ibc.doi.gov) and Contract Specialist Haider Al Azzawi (halazzawi@ibc.doi.gov), on Standard Form 1442 (SF 1442, the construction solicitation and offer form)
- Page limits
- Technical quote: 5 pages (the draft quality control plan and draft management plan are not counted)
What they'll judge offers on
- Technical Proposal: understanding of, approach to and ability to meet the requirements, including five years of experience and a tentative schedule
- Price Proposal: must be fair and reasonable
- Other documentation: Standard Form 1442 completeness, amendment acknowledgment, bid bond (Standard Form 24) completeness and acceptability, and representations and certifications checked in SAM.gov
What to include when you submit
- Submit the quote on SF 1442 and acknowledge Amendment 0001 and any later amendments
- State on the quote that it is valid until the acceptance date set on the SF 1442
- Technical quote: your approach under the statement of work, five years of experience, and a tentative project schedule, in no more than 5 pages
- Attach a draft Quality Control Plan and a draft Contractor Management Plan (staffing plan, work management approach, quality control integration, communication, facility-specific considerations)
- Price quote: provide the price as a total cost, for the two lines (CLIN 0001 and CLIN 0002)
- Include a bid bond (Standard Form 24, SF-24); the amount is left blank in the bid guarantee provision
- Anything over the page limit will not be read; failing to follow the instructions may get the quote eliminated
- Written questions only, no phone calls, to both email addresses above
- If you cannot use the Invoice Processing Platform (IPP, the Treasury's electronic invoicing site), send a written waiver request with your quote
After award, you must have
- At least one prime contractor employee on site in a supervisory role whenever work is performed, able to communicate with the Contracting Officer's Representative (COR) in written and verbal English From Sol_140D0427Q0949_Amd_0001.pdf:
At least one Prime Contractor employee must be onsite in a supervisory capacity any time work…
- Workers need a Real ID compliant photo ID or a Department of the Interior PIV badge; staff on site 6 months or more must get a PIV credential after a background check From Sol_140D0427Q0949_Amd_0001.pdf:
Contractor personnel who will be onsite 6 months or more are required to obtain a…
Not in the notice text
- The bid bond amount is blank, and the files don't show whether performance and payment bonds are required after award.
- The Government's answers to vendor questions are still to be posted in a later amendment.
- The contracting officer's representative is listed as TBD.
- The estimated value is not stated.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 13, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- Ibc Acq SVCS Directorate (00004), Herndon, VA
- Product/service code
- Z2AA · Repair or Alteration of Office Buildings
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 238910)
- Versions
4 versions have been posted, newest first.
- Nov 20, 2026 · Amendment 0003Due Dec 11, 2026 (changed)
- Nov 17, 2026 · Amendment 0002Due Dec 2, 2026
- Nov 13, 2026 · Amendment 0001 (this version)Due Dec 2, 2026 (changed)
- Nov 4, 2026 · Combined Synopsis/SolicitationDue Nov 19, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Demolition of an existing building, Site Improvements and construction of a Modular Office Building at the US Merchant Marine Academy Campus, Kings Point, NYThe U.S. Army Corps of Engineers New York District is seeking sealed bids (an invitation for bid, IFB) to demolish an existing building and build a new modular office of about…
- Project Number 657-507, Correct Seismic Deficiencies for Building 14, Marion VAMC, Illinois Construction of New Boiler Plant and Demolition of ExistingSolicitation 36C10F26R0085: only Veterans Affairs-verified service-disabled veteran-owned small businesses listed in VA's Vendor Information Pages (VIP) database can bid.