Solicitation
Project Number 657-507, Correct Seismic Deficiencies for Building 14, Marion VAMC, Illinois Construction of New Boiler Plant and Demolition of Existing
Department of Veterans Affairs
SDVOSB set-aside · Marion, IL
AI summary Beta
This summary may miss requirements: 5 of 17 attachments weren't read (S04 - Site Visit Sign in Sheet.pdf, S02 - 657-507_VA Marion Seism Defics_Bid Drawings 09-30-2026.pdf and 3 more). Check the attachments on SAM.gov.
Solicitation 36C10F26R0085: only Veterans Affairs-verified service-disabled veteran-owned small businesses listed in VA's Vendor Information Pages (VIP) database can bid. The VA Office of Construction and Facilities Management wants a contractor to build a new boiler plant (Building 14) and tear down the old one at the Marion VA Medical Center in Marion, IL. It is one firm-fixed-price (FFP: one set price, whatever the work ends up costing) design-bid-build contract (the VA supplies the design) with 730 calendar days to finish after the notice to proceed. The response due date is December 11, 2026, 1:00 PM Eastern, and a bid bond is required.
Who can bid (5)
- Be a Veterans Affairs-verified service-disabled veteran-owned small business (SDVOSB) listed in the VA Vendor Information Pages (VIP) database, eligible when you submit the offer and at award From S02 - 36C10F26R0085 0003.pdf
- Be small under the NAICS 236220 size standard of $45M From S02 - 36C10F26R0085_1.pdf
- Submit a bid bond with your proposal From S02 - 36C10F26R0085 0003.pdf
Show all 5Show fewer
- Self-perform on the site, with your own organization, work equal to at least 15 percent of the total work From S02 - 36C10F26R0085 0003.pdf
- Past performance and the firm's capability to execute this kind of project are reviewed From S02 - 36C10F26R0085 0003.pdf
Things to watch (8)
From the version posted Nov 17, 2026.
- Serious: Only VIP-listed SDVOSBs can bid. Offers from firms not listed as SDVOSBs in VA's VIP database when they offer are not considered, and the firm must still be eligible at award. From S02 - 36C10F26R0085 0003.pdf
- Serious: Bid bond required with the proposal. On a project the VA sizes between $20 million and $50 million, a bid bond (and later performance and payment bonds) can be hard for a small firm to get; the original must be delivered in addition to the electronic copy. From S02 - 36C10F26R0085 0003.pdf
- Serious: At least 15 percent self-performance and limits on subcontracting. You must do at least 15 percent of the work on site with your own organization, and the SDVOSB subcontracting clause limits how much may go to firms that are not VIP-listed SDVOSBs. From S02 - 36C10F26R0085 0003.pdf
Show all 8Show fewer
- Worth checking: Answers to RFIs come in a later amendment. Questions sent by the RFI deadline will be answered in a later amendment, so answers that could change your price may not be posted yet. From S02 - 36C10F26R0085 0003.pdf
- Worth checking: Work in an active hospital with phasing and set hours. Work is phased, normal hours are 7:00 am to 4:30 pm Monday to Friday unless approved in writing, and shutdown requests need 21 days notice. From S02 - 36C10F26R0085_1.pdf
- Worth checking: Demolition with hazardous materials in a historic district. The 1940 plant has hazardous construction materials to mitigate, and an attached agreement with the Illinois State Historic Preservation Officer covers the demolition's effect on a historic district. From S02 - 36C10F26R0085_1.pdf
- Worth checking: Buy American rules for construction materials. Materials must be domestic or from designated countries (other than Bahrain, Mexico or Oman) unless the VA approves an exception, which must be requested with the offer. From S02 - 36C10F26R0085 0003.pdf
- Minor: The site visit was Oct 20, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From S02 - 36C10F26R0085_1.pdf
Read from the notice and 12 attachments. 5 of 17 not read. Show which files.
- Instructions for 20 OCT 2026 B14 Site Visit.docx (read)
- S02 - 36C10F26R0085 0003.pdf (read)
- S02 - 36C10F26R0085 0002.pdf (read)
- S02 - 36C10F26R0085 0001.pdf (read)
- S02 - 36C10F26R0085_1.pdf (read)
- S04 - Site Visit Roster.pdf (read)
- S02 - 657-507_VA Marion SeisDefic_Final Bid Specs 9-1-2026.pdf (read)
- S02_ATTACHMENT 3_Proposal Data Sheet.docx (read)
- 657-507_Marrion_CorrectSeisDef - Appendix-HAZMAT 1.pdf (read)
- 657-507_Marion_CorrectSeisDef - Appendix - SHPO MOA 1.pdf (read)
- S02_ATTACHMENT 2_PPQ.docx (read)
- S02_ATTACHMENT 1_Key Personnel Resume Form.docx (read)
- S04 - Site Visit Sign in Sheet.pdf: not summarized: open it on SAM.gov
- S02 - 657-507_VA Marion Seism Defics_Bid Drawings 09-30-2026.pdf: not summarized: open it on SAM.gov
- 657-507_Marion_CorrectSeisDef - Appendix - Geotech Report 1.pdf: not summarized: open it on SAM.gov
- 657-507_Marion_CorrectSeisDef - Appendix - Geotech Report GMHA Seismic Report 1.pdf: not summarized: open it on SAM.gov
- 657-507_Marion_CorrectSeisDef - Appendix - Geologic Hazards Report 1.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Build a new boiler plant, about 10,310 sf over three floors with a basement, on a new site of about 0.7 acres
- Install the plant systems, including three new 250 HP gas-fired firetube boilers with fuel oil backup, a diesel generator, electrical, controls, plumbing and fire protection
- Do the site work: earthwork, parking lot, fencing and gates, a fuel oil tank yard, utility changes, a roadway realignment and a steam tunnel
- Start up and commission all new plant systems, then cut over all utility services from the existing plant to the new one
- Demolish the existing plant of about 6,200 sf (built in 1940), including hazardous material mitigation, and restore its footprint to green space
- Price two deductive alternates: deleting asphalt replacement on East Periphery Drive, and removing the maintenance garage and shop space addition
- Submit a construction schedule, shop drawings, an accident prevention plan and a quality control plan before the related work starts
- Contract type
- Firm-fixed-price (FFP) design-bid-build construction; one contract will be awarded
- Period of performance
- 730 calendar days (24 months) from the Notice to Proceed
- Place of performance
- Marion VA Medical Center, 2401 W Main St, Marion, IL 62959
- Estimated value
- Between $20,000,000 and $50,000,000, the VA's estimated magnitude of construction under VAAR 836.204
- Offers due
- December 11, 2026, 1:00 PM Eastern
What they'll judge offers on
- Understanding of and capability to execute the project
- Compliance with the share of work the contractor must perform itself (at least 15 percent, per VAAR 852.219-75)
What to include when you submit
- Submit a bid bond for the project: the original goes to the Contracting Office, plus an electronic copy in Tab E of the proposal.
- Perform on the site, with your own organization, work equal to at least 15 percent of the total work (VAAR 852.219-75).
- Complete the Proposal Data Sheet (Attachment 3), including the people authorized to negotiate for your firm.
- Complete the Key Personnel Resume Form (Attachment 1).
- Send Past Performance Questionnaires (Attachment 2): clients fill them out and return them to you, and you submit them with the proposal.
- Fill in the price schedule: one lump sum item plus prices for the two deductive alternates (deleting East Periphery Drive asphalt replacement, and removing the maintenance garage and shop addition).
- Acknowledge each amendment in your offer.
- If you want to use foreign construction materials, send the Buy American determination request and price comparison with your offer.
After award, you must have
- Performance and payment bonds will be required in the contract From S02 - 36C10F26R0085 0003.pdf:
FAR clause 52.228-15 Performance and Payment Bonds-…
- Employees need VA authorization, up to security badging by the Marion VAMC Police Department, before entering the site From S02 - 36C10F26R0085_1.pdf:
…security badging via the Marion VAMC Police Department…
Not in the notice text
- Only part of the solicitation was read: the middle of the main solicitation (including the bidding material, bid guarantee, bonding and instructions sections), the specifications and Amendment 0003 were cut off, and the bid drawings and three geotechnical and geologic hazards reports are attached but not read. Check them on SAM.gov.
- How the proposal is submitted (email, portal or mail) is not in the text read.
- The full evaluation factors, their order and the basis of award are not in the text read.
- The bid bond amount and the days allowed for performance and payment bonds are not in the text read.
- Whether the October 20, 2026 site visit was required is not stated in the text read.
- The text read does not say which Davis-Bacon wage determination applies, although a general wage decision with Illinois rates is included.
- The Government's answers to the questions sent by the RFI deadline are not yet in the amendments read.
More to check before you bid
- Not certified through VetCert yet? Apply on VetCert (SBA), or start with the SDVOSB guide. More open service-disabled veteran-owned set-asides under NAICS 236220
Notice details
Notice type, codes, versions and files
- Posted
- Nov 17, 2026
- Notice type
- Solicitation
- Office
- Office of Construction & Facilities MGMT (36C10F), Washington, DC
- Product/service code
- Y1DZ · Construction of Other Hospital Buildings
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
8 versions have been posted, newest first.
- Nov 17, 2026 · Amendment 0007 (this version)Due Dec 11, 2026 (changed)
- Nov 2, 2026 · Amendment 0006Due Nov 20, 2026 (changed)
- Oct 30, 2026 · Amendment 0005Due Nov 6, 2026
- Oct 29, 2026 · Amendment 0004Due Nov 6, 2026
- Oct 22, 2026 · Amendment 0003Due Nov 6, 2026
- Oct 19, 2026 · Amendment 0002Due Nov 6, 2026
- Oct 8, 2026 · Amendment 0001Due Nov 6, 2026 (changed)
- Oct 7, 2026 · SolicitationDue Oct 6, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Open SDVOSB set-aside contracts
Terms on this notice: Solicitation, SDVOSB (service-disabled veteran-owned small business), Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Project Number 653-105, Seismic Retrofit of Building 16, Roseburg VAMC, OregonOnly certified service-disabled veteran-owned small businesses (SDVOSB) can bid on solicitation 36C10F26R0084, a Veterans Affairs request for proposals (RFP) for a seismic…
- Correct Electrical DeficienciesOnly service-disabled veteran-owned small businesses (SDVOSBs) can bid on solicitation 36C24627B0001, a sealed-bid construction job from the Department of Veterans Affairs (VA),…
- Demolition of an existing building, Site Improvements and construction of a Modular Office Building at the US Merchant Marine Academy Campus, Kings Point, NYThe U.S. Army Corps of Engineers New York District is seeking sealed bids (an invitation for bid, IFB) to demolish an existing building and build a new modular office of about…
- 523A4-CSI-288 3.0T MRI Site Prep - Design Build West Roxbury VA Medical Center (VAMC West Roxbury, MAPresolicitation: only service-disabled veteran-owned small businesses (SDVOSBs) can bid on this design-build project, which the Department of Veterans Affairs Program Contracting…
- Design Building (DB) 626-27-504 MHEOCC Compliance TVHS VAMC (Nashville Campus)Step 1 of 2: Standard Form 330 (SF330, the architect-engineer qualifications form) packages are due December 2, 2026, 1:00 PM Central Time.