Only small businesses can send quotes for drydock repairs of the Coast Guard cutter HAMMER (WLIC 75302) and its 68-foot barge (68014), under solicitation 70ZU0127QPBPL0001. The response due date is December 2, 2026, 11:00 AM Eastern, and the schedule shows work from January 6, 2027 to March 17, 2027. The vessel's homeport is Jacksonville, FL, and bidders offer their own waterfront shipyard.
Who can bid (5)
- Small business only: this is a total small business set-aside. From 70ZU0127QPBPL0001_1_US.pdf
- A waterfront facility that ships can reach under their own power at any tide, with at least 11 feet of water and 35 feet of height clearance, able to drydock both vessels. From 70ZU0127QPBPL0001_1_US.pdf
- Do not pay more than 50 percent of the amount the Government pays for services to subcontractors that are not small businesses (limitations on subcontracting). From 70ZU0127QPBPL0001_1_US.pdf
Show all 5Show fewer
- An independent coating inspector certified NACE Level 3, who is not an employee of the contractor or a coating maker. From Attachment 2_SOW_HAMMER_DD_FY27.pdf
- Insurance with proof before work starts: ship repairer's liability and general liability of $500,000 per occurrence each, plus Longshoremen's and Harbor Workers' Act and state workers' compensation coverage. From Attachment 3 - SOW Addendum.pdf
Things to watch (8)
From the version posted Nov 19, 2026.
- Serious: Total small business set-aside. Only small businesses can win this order, and the clause also caps how much work can go to subcontractors that are not small. From 70ZU0127QPBPL0001_1_US.pdf
- Serious: Bidder needs a drydock that fits both vessels. Your own shipyard must reach the vessels by water with 11 feet of depth and 35 feet of clearance, and lift or dock both a cutter and a barge. From 70ZU0127QPBPL0001_1_US.pdf
- Worth checking: Lift capacity 125 percent of stated weight. The Government answered that any lift or drydock must handle 125 percent of the vessel weight in the specification, with current certification by a Coast Guard engineer or inspector. From 70ZU0127QPBPL0001_HAMMER_QUESTIONS.pdf
Show all 8Show fewer
- Worth checking: Yard location adds to your evaluated price. The Government adds ship transit cost, crew allowances and its own travel costs for a yard away from Jacksonville to your price when comparing quotes. From 70ZU0127QPBPL0001_1_US.pdf
- Worth checking: Asbestos and lead paint present. Asbestos must be treated as friable (easily crumbled) when removed, and the prime contractor bears the cost of contaminated spaces and ineffective subcontractor abatement. From Attachment 2_SOW_HAMMER_DD_FY27.pdf
- Worth checking: Independent NACE Level 3 coating inspector on site. A third-party inspector must stay on site for all critical coating work, and the name goes to the Coast Guard's representative at the Arrival Conference. From Attachment 2_SOW_HAMMER_DD_FY27.pdf
- Worth checking: Funding depends on congressional appropriation. The line item says funding is contingent on an appropriation act, so award or start could be affected. From 70ZU0127QPBPL0001_1_US.pdf
- Worth checking: Insurance proof before work starts. The certificate must name the Coast Guard vessel and the contract number, with the coverage listed in the specification addendum.
Read from the notice and 7 attachments. 1 of 8 not read. Show which files.
- 70ZU0127QPBPL00010004_US.pdf (read)
- 70ZU0127QPBPL00010003_US.pdf (read)
- 70ZU0127QPBPL0001_HAMMER_QUESTIONS.pdf (read)
- 70ZU0127QPBPL00010002_US signed.pdf (read)
- 70ZU0127QPBPL0001_1_US.pdf (read)
- Attachment 3 - SOW Addendum.pdf (read)
- Attachment 2_SOW_HAMMER_DD_FY27.pdf (read)
- Attachment 1_ScheduleOfServices_HAMMER_DD_FY27.xls: not read (the AI doesn't read this file type yet): open it on SAM.gov
Full summary
What they want
- Lift both the cutter (called the tender) and the barge out of the water in a drydock and repair them; the specification lists 99 work items.
- Inspect hull plating by ultrasound, renew or weld-repair steel plating, and test appendages and voids for leaks.
- Remove and paint (preserve) the underwater hull, freeboard, superstructure, exhaust stacks, mast, decks and tanks, with tenting over some deck work.
- Overhaul the propulsion shafting, shaft seals and bearings, propellers, rudder assembly, sea valves and sea strainers.
- Barge work: spuds (the barge's anchoring posts) and spud winches, doors, engine coolant and exhaust piping, bulwark and pusher knee repairs, and shrink wrap of cranes.
- Provide an independent coating inspector certified NACE Level 3, plus temporary services and sea trial support.
- Remove up to 10 sqft of lead-based paint and asbestos-containing material in spot areas found during the work.
- Contract type
- Firm-fixed-price (FFP): one set price, whatever the work ends up costing. Funding is contingent on a congressional appropriation act.
- Period of performance
- January 6, 2027 to March 17, 2027 (Section II line item 0001)
- Place of performance
- Jacksonville, FL, USA per SAM.gov. The vessel's homeport is Jacksonville, FL; bidders offer their own shipyard, and the Government adds costs for yards away from the homeport.
- Estimated value
- Not stated
- Offers due
- December 2, 2026, 11:00 AM Eastern
What they'll judge offers on
- Price, with foreseeable Government costs for the offered shipyard location added for evaluation only: ship transit from Jacksonville, family separation allowance and homeport travel for crew, and travel and per diem for the Coast Guard's on-site representative
After award, you must have
- All licenses and permits for hazardous substance removal or disposal; if you lack them, get them within 5 days after award and show proof before work begins. From 70ZU0127QPBPL0001_1_US.pdf:
The Contractor shall have all licenses and permits required by Federal, state, and local laws to perform hazardous substance(s)
Not in the notice text
- Not all text was read: the middle of the main solicitation (30,826 characters, likely including how to submit, evaluation factors and any site visit) and most of Attachment 2_SOW_HAMMER_DD_FY27.pdf (523,138 characters) were left out. Attachment 1_ScheduleOfServices_HAMMER_DD_FY27.xls is attached but not read; the price lines and quantities are there.
- How to submit quotes, who to send them to, page limits and the documents required with a quote are not in the text that was read.
- The evaluation method and factors beyond the added location costs are not in the text that was read.
- Whether there is a site visit, and the last day for questions and drawing requests, are not in the text that was read.
- The Government's estimate or budget is not given, and the vessel weights the lift capacity is based on are in the part of the specification that was not read.
- Whether the work can be done remotely is not stated.
More to check before you bid
- Service contracts usually set minimum pay rates (the Service Contract Act). Price the labor with the SCA price calculator.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 19, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- CG-Sea-C21, Norfolk, VA
- Product/service code
- J998 · Non-Nuclear Ship Repair (EAST)
- Business type
- Aircraft, ship & vehicle parts (FedReady's grouping, from NAICS 336611)
- Versions
7 versions have been posted, newest first.
- Nov 19, 2026 · Amendment 0006Due Dec 2, 2026 (changed)
- Nov 19, 2026 · Amendment 0005 (this version)Due Nov 9, 2026
- Nov 3, 2026 · Amendment 0004Due Nov 9, 2026
- Nov 3, 2026 · Amendment 0003Due Nov 9, 2026
- Nov 2, 2026 · Amendment 0002Due Nov 9, 2026
- Oct 26, 2026 · Amendment 0001Due Nov 9, 2026
- Oct 20, 2026 · Combined Synopsis/SolicitationDue Nov 9, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Uscgc William Tate Drydock RepairsThe U.S. Coast Guard (Homeland Security, CG-SEA-C22) wants a small business to do drydock repairs on the buoy tender USCGC WILLIAM TATE (WLM 560) at the vendor's own shipyard,…
- Uscgc Maria Bray (WLM 562) Dockside Repair FY27Only small businesses can bid: the U.S. Coast Guard wants a ship repair yard to do dockside repairs on the cutter MARIA BRAY at its homeport in Atlantic Beach, FL, solicitation…
- USCG Sta San Juan (45646) FY27 Drydock RepairsU.S. Coast Guard (CG-SEA-C23) is asking sources about FY27 drydock repairs (solicitation number 70ZU0327SSBPL7937) on the 45-foot response boat at USCG STA SAN JUAN (45646), San…
- Uscgc Richard Etheridge (WPC-1102) Drydock Availability
- CGC Anvil DrydockOnly small businesses can bid on solicitation 70ZU0227QIBCT0006, the U.S. Coast Guard's drydock repair of cutter ANVIL and its 68-foot barge, done at the contractor's shipyard.