Combined Synopsis/Solicitation
Uscgc William Tate Drydock Repairs
Department of Homeland Security · U.S. Coast Guard
Small business set-aside · Vendor's Facility and 1 more place (from the AI summary)
AI summary Beta
This summary may miss requirements: 6 of 9 attachments weren't read (CGC WILLIAM TATE Attachment 1 - Pricing Schedule .xlsx, CGC WILLIAM TATE Attachment 4 - Request for Clarification.docx and 4 more). Check the attachments on SAM.gov.
The U.S. Coast Guard (Homeland Security, CG-SEA-C22) wants a small business to do drydock repairs on the buoy tender USCGC WILLIAM TATE (WLM 560) at the vendor's own shipyard, solicitation 70ZU02-27-QIBCT0005 on SAM.gov (70ZU0227QIBCT0005 in the documents). The response due date is December 28, 2026, 4:00 AM Eastern on SAM.gov, but the solicitation says 4:00 PM Eastern. Work runs on or about April 6, 2027 to August 4, 2027.
Who can bid (7)
- Small business set-aside: SAM.gov and the solicitation say total small business set-aside under NAICS 336611, size standard 1,300 employees (the solicitation also says full and open competition) From USCGC WILLIAM TATE DRYDOCK REPAIRS SOLICITATION - 70ZU0227QIBCT0005.pdf
- Joint Certification Program (JCP) certification as a U.S. or Canadian contractor, with a JCP number, to get the drawings and export-controlled references From USCGC WILLIAM TATE DRYDOCK REPAIRS SOLICITATION - 70ZU0227QIBCT0005.pdf
- A commercial shipyard with a drydock, reachable from a navigable waterway, with at least 15 feet of water depth and 59 feet of vertical clearance, within the offeror's quote as the named shipyard From USCGC WILLIAM TATE DRYDOCK REPAIRS SOLICITATION - 70ZU0227QIBCT0005.pdf
Show all 7Show fewer
- Certifications, licenses and personnel qualifications required by the statement of work, sent with the quote From USCGC WILLIAM TATE DRYDOCK REPAIRS SOLICITATION - 70ZU0227QIBCT0005.pdf
- Welding certifications and qualifications for welding work items per SFLC Standard Specification 0740 (Coast Guard welding standard) From USCGC WILLIAM TATE DRYDOCK REPAIRS SOLICITATION - 70ZU0227QIBCT0005.pdf
- Proof of insurance with the quote (work on a Government installation insurance clause 52.228-5 applies) From USCGC WILLIAM TATE DRYDOCK REPAIRS SOLICITATION - 70ZU0227QIBCT0005.pdf
- Relevant, recent past performance as prime contractor on one to three contracts; a rating of Marginal or below is Unacceptable From USCGC WILLIAM TATE DRYDOCK REPAIRS SOLICITATION - 70ZU0227QIBCT0005.pdf
How to submit: Email to Contracting Officer Iran Walker at the Coast Guard (address is in the solicitation). What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (11)
From the version posted Nov 20, 2026.
- Serious: Must supply a drydock-capable shipyard. The vendor's facility must have the water depth and clearance for the cutter and be named in the quote; leaving out the shipyard location may make the quote nonresponsive. From USCGC WILLIAM TATE DRYDOCK REPAIRS SOLICITATION - 70ZU0227QIBCT0005.pdf
- Serious: Shipyard location adds Government costs to your evaluated price. Transit, crew travel, lodging and Coast Guard representative costs are added to the price for ranking, so a shipyard far from the home port loses ground in a lowest-price contest. From USCGC WILLIAM TATE DRYDOCK REPAIRS SOLICITATION - 70ZU0227QIBCT0005.pdf
- Serious: Drawings and references need Joint Certification Program (JCP) certification. JCP certifies U.S. and Canadian contractors to receive export-controlled data; the last day to request drawings is December 17, 2026. From USCGC WILLIAM TATE DRYDOCK REPAIRS SOLICITATION - 70ZU0227QIBCT0005.pdf
Show all 11Show fewer
- Worth checking: Set-aside wording conflicts: full and open versus total small business. SAM.gov and one sentence say total small business set-aside; another sentence says full and open competition. Ask the contracting officer which applies. From USCGC WILLIAM TATE DRYDOCK REPAIRS SOLICITATION - 70ZU0227QIBCT0005.pdf
- Worth checking: Anticipated award date is written as February 16, 2026. The performance period starts April 6, 2027, so the award date year may be a typo; ask the contracting officer. From USCGC WILLIAM TATE DRYDOCK REPAIRS SOLICITATION - 70ZU0227QIBCT0005.pdf
- Worth checking: Home port is Philadelphia in one place and Pensacola in another. The transit cost calculation names Pensacola, Florida, while the rest of the solicitation names Philadelphia, PA; the choice changes every shipyard's evaluated price. From USCGC WILLIAM TATE DRYDOCK REPAIRS SOLICITATION - 70ZU0227QIBCT0005.pdf
- Worth checking: Contract type described two ways. The solicitation calls the award a firm fixed price contract and also an Indefinite Delivery Requirement Contract with task orders; ask how pricing and orders will work. From USCGC WILLIAM TATE DRYDOCK REPAIRS SOLICITATION - 70ZU0227QIBCT0005.pdf
- Worth checking: Site visit urged, not required: complete by December 18, 2026. The solicitation says offerors are urged and expected to inspect the site; ship checks are to be scheduled and completed by that date. From USCGC WILLIAM TATE DRYDOCK REPAIRS SOLICITATION - 70ZU0227QIBCT0005.pdf
- Minor: Questions strongly encouraged by December 21, 2026, 4:00 PM EST. Questions go on Attachment 4, the Request for Clarification form, which could not be opened for this brief. From USCGC WILLIAM TATE DRYDOCK REPAIRS SOLICITATION - 70ZU0227QIBCT0005.pdf
- Minor: Critical inspection reports due early in the job. Work items with critical inspection reports must be finished within the first 25% of the availability. From CGC WILLIAM TATE Attachment 2 - SPEC..pdf
- Minor: Limits on subcontracting for a small business set-aside. The limitations on subcontracting clause caps how much work a small business may pass to others; the percentage was not in the text read. From USCGC WILLIAM TATE DRYDOCK REPAIRS SOLICITATION - 70ZU0227QIBCT0005.pdf
Read from the notice and 3 attachments. 6 of 9 not read. Show which files.
- USCGC WILLIAM TATE DRYDOCK REPAIRS SOLICITATION - 70ZU0227QIBCT0005.pdf (read)
- CGC WILLIAM TATE Attachment 2 - SPEC..pdf (read)
- CGC WILLIAM TATE Attachment- 3 - Past Performance Information.docx (read)
- CGC WILLIAM TATE Attachment 1 - Pricing Schedule .xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- CGC WILLIAM TATE Attachment 4 - Request for Clarification.docx: not read (it couldn't be opened): open it on SAM.gov
- CGC WILLIAM TATE Attachment 5a - Justification Work Item D-014.pdf: not summarized: open it on SAM.gov
- CGC WILLIAM TATE Attachment 5b - Justification Work Item D-020 - D-02 - D-049.pdf: not summarized: open it on SAM.gov
- CGC WILLIAM TATE Attachment 5c - Justification Work Item D-031.pdf: not summarized: open it on SAM.gov
- Attachment 6 - WILLIAM TATE USCG Ombudsman Notice.docx: not read (it couldn't be opened): open it on SAM.gov
Full summary
What they want
- A commercial shipyard with a drydock (a dock that is drained so the hull can be worked on) that can take the 174-foot cutter, with at least 15 feet of water depth and 59 feet of vertical clearance
- Inspect, ultrasonic test and preserve the hull underwater body; leak test underwater appendages
- Renew the Z-drive propulsion units (steerable propeller drives), depth sounder (fathometer) and speed log transducers, and overhaul sea valves, strainers and thruster units
- Inspect and service the anchor windlass, chain stoppers, winches, capstan, davit and buoy crane; renew anchor chain stoppers and foundations
- Clean and inspect fuel, ballast and waste tanks and chain lockers; renew piping, anodes and interior deck covering
- Provide temporary services, fire prevention and sea trial support; 54 work items in all in the specification
- Send a graphical schedule plan, a narrative of no more than ten pages and a filled-in Attachment 1 pricing sheet with a lay day rate and composite labor rate
- Contract type
- Firm-fixed-price (FFP: one set price, whatever the work ends up costing) under FAR Part 12, and also described as an Indefinite Delivery Requirement Contract (IDR: the Coast Guard issues task orders for the work it needs)
- Period of performance
- On or about April 6, 2027 to on or about August 4, 2027
- Place of performance
- Vendor's Facility; the cutter's home port is 1 Washington Avenue, Philadelphia, PA 19147
- Estimated value
- Not stated
- How they'll choose
- Lowest price technically acceptable (LPTA: the lowest evaluated price among quotes rated Acceptable wins), with certain Government travel and transit costs added to price based on the shipyard's location
- Offers due
- December 28, 2026, 4:00 AM Eastern on SAM.gov; the solicitation says 4:00 PM Eastern Time
- How to submit
- Email to Contracting Officer Iran Walker at the Coast Guard (address is in the solicitation)
- Page limits
- Technical narrative: 10 pages; email: 10 MB each
What they'll judge offers on
- Technical Capability: rated Acceptable or Unacceptable on understanding of the work, meeting all specification requirements, and documentation of capability and corporate experience
- Past Performance: recent and relevant work; Satisfactory or higher is Acceptable, Marginal or below is Unacceptable, none is Neutral and Acceptable
- Price: total evaluated price including the lay day rate, composite labor rate and foreseeable costs tied to shipyard location
What to include when you submit
- Send price, technical capability and past performance information in separate emails, each under 10 MB
- Number all pages and label them USCGC WILLIAM TATE, Drydock Repairs FY27, RFQ 70ZU0227QIBCT0005 with the quote date; include a table of contents
- Price: fill out Attachment 1 Pricing Sheet with unit and extended prices for each work item, not rounded; send a signed PDF and a spreadsheet copy
- Technical: a graphical planning document (for example a Gantt chart) showing work item periods, inspection report dates, Coast Guard inspector dates, technical representative and subcontractor periods, critical path and float
- Narrative of no more than ten pages on performance risks, precipitation and humidity at the dock location, limiting disruption to cutter services, quality assurance and quality control, surge capacity, and the best commercial warranty terms
- Send all certifications, licenses and personnel qualifications required by the statement of work with the quote
- Send proof of insurance: a statement of coverage from the current insurance carrier
- List all subcontractors with name, address, contact, work item, and percentage of work, and confirm in writing that technical representatives meet the requirement
- Send welding certifications and qualifications for applicable work items per SFLC Standard Specification 0740
- Past performance: identify at least one but not more than three relevant contracts completed within the last three years as prime contractor, each on Attachment 3 Past Performance Information Form; include the same data for any subcontractor doing 25% or more of the evaluated price
- If no contract was completed within three years, include a statement giving the reason
- Give the exact name and location of the shipyard to be used; leaving it out may make the quote nonresponsive
- Quote must stay valid for 60 days
Not in the notice text
- Text is partial: the pricing sheet (Attachment 1, spreadsheet) was not read; Attachment 4 (Request for Clarification) and Attachment 6 (Ombudsman notice) could not be opened; Attachments 5a, 5b and 5c (work item justifications) are scanned PDFs with no text. All are attached on SAM.gov.
- About 27,000 characters from the middle of the solicitation and about 342,000 characters from the middle of the specification were left out of the text read, so most work item details are not covered.
- Estimated contract value is not stated; the order limits say the contractor need not honor a single-item order over $500,000 or a combined order over $5,000,000.
- Whether SAM.gov's due time (4:00 AM Eastern) or the solicitation's (4:00 PM Eastern) governs is not stated.
- Whether work may be done remotely is not stated; the work is on the cutter at the vendor's shipyard.
- Davis-Bacon and Service Contract Act wage rules are not mentioned in the text read.
More to check before you bid
- The AI summary also reads the notice as naming requirements:
- The AI summary's reading of the notice and its attachments says a bidder needs: DD 2345 export approval. The summary's list is under Who can bid; check it in the notice before you bid.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 20, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- CG-Sea-C22, Alameda, CA
- Product/service code
- J998 · Non-Nuclear Ship Repair (EAST)
- Business type
- Aircraft, ship & vehicle parts (FedReady's grouping, from NAICS 336611)
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Uscgc Hammer (Wlic 75302) USCG 68A Barge (68014) Drydock Repairs FY2027Only small businesses can send quotes for drydock repairs of the Coast Guard cutter HAMMER (WLIC 75302) and its 68-foot barge (68014), under solicitation 70ZU0127QPBPL0001.
- USCGC Joseph Tezanos DD FY27Only small businesses can bid on this request for quotations (RFQ), number 70ZU0127QPBPL0011, issued by the U.S. Coast Guard (Homeland Security, CG-SEA-C21).
- Uscgc Sturgeon (WPB-(87336) DS FY27Only small businesses can send quotes for dockside engine overhaul work on the Coast Guard cutter STURGEON (WPB-87336), under solicitation 70Z08026QPBPL0044.
- Uscgc Hamilton (WMSL 753) DS, FY27, FQ3Only small businesses can bid on this combined synopsis and solicitation (request for quote, RFQ) 70ZU0227QLREP0001 from the U.S. Coast Guard (CG-SEA-C22).
- Uscgc Maria Bray (WLM 562) Dockside Repair FY27Only small businesses can bid: the U.S. Coast Guard wants a ship repair yard to do dockside repairs on the cutter MARIA BRAY at its homeport in Atlantic Beach, FL, solicitation…