AI summaryThe National Park Service (Interior Department, DSC Contracting Services Division) wants a prime contractor for solicitation 140P2026R0081 to stabilize the Kingsley Plantation shoreline with a seawall extension at Timucuan Ecological and Historic Preserve, Jacksonville, Florida. The response due date is November 13, 2026, 5:00 PM Eastern, after Amendment 0003 extended it. The contract duration is 259 days, in three phases that must follow one another, with a magnitude of construction stated as $1,000,000 to $5,000,000. More in the summary
AI summary Beta
Summary of the version posted Oct 22, 2026. The notice was amended Nov 5, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 6 of 18 attachments weren't read (B08_-_Attachment_05_-_Vol_I_Exp.docx, B08_-_Attachment_06_-_Vol_I_PastPerf.docx and 4 more). Check the attachments on SAM.gov.
The National Park Service (Interior Department, DSC Contracting Services Division) wants a prime contractor for solicitation 140P2026R0081 to stabilize the Kingsley Plantation shoreline with a seawall extension at Timucuan Ecological and Historic Preserve, Jacksonville, Florida. The response due date is November 13, 2026, 5:00 PM Eastern, after Amendment 0003 extended it. The contract duration is 259 days, in three phases that must follow one another, with a magnitude of construction stated as $1,000,000 to $5,000,000.
Who can bid
- Small business under NAICS 237990 (size standard $45M); the solicitation form says the acquisition is a small business set-aside
- Bid guarantee with the offer: SF 24 Bid Bond or other suitable bid guarantee
- Key trades and key personnel with sheet pile driving experience (steel, vinyl or FRP); a quality control (QC) manager, a site safety and health officer (SSHO) and a superintendent are named positions
Things to watch (11)
- Serious: Set-aside differs between SAM.gov and the solicitation. SAM.gov does not state a set-aside, but the solicitation form says this is a small business set-aside; check with the contracting officer which governs.
- Serious: Bid guarantee and bonds. A bid bond or other guarantee goes in with the offer, and performance and payment bonds follow award; the amounts were in parts of the solicitation not read.
- Worth checking: Phases must run one after another. No overlapping crews or phases are allowed, which limits how a bidder can shorten the 259 days.
Show all 11Show fewer
- Worth checking: Obstructions during pile driving are the bidder's risk. Pre-augering and jetting are prohibited for vinyl/FRP piles, and bidders must price a contingency for refusal on unexpected obstructions.
- Worth checking: Low-tide, daylight-only shoreline work. Shoreline pile driving, riprap and plantings only happen at low tide, in daylight, with a limit of 5 synthetic sheet piles per day, and no tree cutting during bat pup season.
- Worth checking: Permit still in process. The St. Johns River Water Management District permit is not finished; its conditions will be shared when available and could affect pricing.
- Minor: 730-day plant warranty after completion. Spartina plantings carry a 730-day warranty period with no retainage; the government can call for replacement plants.
- Minor: Work hours and delivery days limited. Work runs 8am to 5pm Monday to Friday per the answers; the division 01 specification says 8:00 a.m. to 4:30 p.m., so ask which hours govern. Large deliveries are limited to Monday and Tuesday.
- Minor: Response due date moved to November 13, 2026. Amendment 0003 extended the response due date; the original form showed 11/06/2026 at 1700, and the earlier answers refer to a November 6 deadline.
- Minor: The site visit was Oct 20, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered.
- Minor: Florida contractor license not confirmed. The government did not say if a Florida general or marine contractor license or county registration is needed; bidders must check with the state.
Read from the notice and 12 attachments. 6 of 18 not read. Show which files.
- Sol_140P2026R0081_Amd_0003.pdf (read)
- Sol_140P2026R0081_Amd_0002.pdf (read)
- Sol_140P2026R0081_Amd_0001.pdf (read)
- Sol_140P2026R0081.pdf (read)
- B08_-_Attachment_01_-_TIMU_335507_Div_01_Specifications.pdf (read)
- B08_-_Attachment_02_-_TIMU_335507_Div_02_TO_49_Technical_Specifications.pdf (read)
- 20260915_USACE_NWP_Permit_0002.pdf (read)
- B08_-_Attachment_11_-_Appendix_C-Procedure_for_Environmental_Protection_2026-10-22_Opt_0003.pdf (read)
- B08_-_Attachment_05_-_Vol_I_Exp_Updated_0002.docx (read)
- B08_-_Attachment_06_-_Vol_I_PastPerf_Updated_0002.docx (read)
- B08_-_Attachment_08_-_SF-24_Bid_Bond.pdf (read)
- B08_-_Attachment_09_-_Pre-Bid_Walk_Map.pdf (read)
- B08_-_Attachment_05_-_Vol_I_Exp.docx: not summarized: open it on SAM.gov
- B08_-_Attachment_06_-_Vol_I_PastPerf.docx: not summarized: open it on SAM.gov
- B08_-_Attachment_07_-_Vol_II_-_GenRefs_doc.pdf: not summarized: open it on SAM.gov
- B08_-_Attachment_10_-_Limitation_on_Subcontracting_Report_Template_0002.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- B08_-_Attachment_03_-_TIMU_335507_Construction_Drawings.pdf: not summarized: open it on SAM.gov
- B08_-_Attachment_04_-_Wage_Determination_WD_FL20260202.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Phases 1 and 2: build a new weatherable rigid vinyl sheet pile wall with tie rods and a vinyl deadman wall (a buried anchor wall) in front of the existing wall, west end first, then east end
- Phase 3: install a new structural fiber-reinforced plastic (FRP) composite sheet pile wall to extend the wall east
- Do selective demolition, excavation, soil and gravel backfill, sodding, spartina sea grass planting, and limestone riprap (hand-installed stone) in front of the wall
- Build and later remove a temporary haul road and fence, then seed the haul road and staging area
- Protect gopher tortoises, wetlands, trees and archaeological resources, and install at least two vibration monitors near pile driving
- Warranty work: a 730-day warranty on the spartina plantings and a 1-year general warranty after final acceptance
- Contract type
- Construction under a single prime contract; 3 contract line items (CLINs) 0001-0003, no options
- Period of performance
- 259-day contract duration per the Amendment 0003 answers; start of work 10 calendar days after notice to proceed; three sequential phases
- Place of performance
- Timucuan Ecological and Historical Preserve, 11676 Palmetto Avenue, Jacksonville, FL 32226
- Estimated value
- Magnitude of construction stated as between $1,000,000 and $5,000,000
- How they'll choose
- Best value tradeoff (Best Value Continuum process under FAR Part 15.1); the contracting officer is the source selection authority. All non-price factors combined are significantly more important than price. The Government intends to award without discussions.
- Offers due
- November 13, 2026, 5:00 PM Eastern (from the version posted Oct 22, 2026; amended since)
What they'll judge offers on
- Factor 1 Technical Approach: realistic, efficient approach that shows scope understanding
- Factor 2 Schedule: construction schedule with critical path, sequencing, procurement lead time and staging, finished within the required period
- Factor 3 Management Approach: management practices, cost and quality control, team roles and communication
- Factor 4 Safety: project-specific safety overview and risk assessment, safety personnel qualifications, OSHA 300A incidents and experience modification rate (EMR)
- Factor 5 Project Experience: similar projects, sheet pile driving experience, working near wetlands and sensitive cultural resources, seawall construction on time and within budget
- Factor 6 Key Personnel Experience: same or similar key positions on relevant projects
- Factor 7 Past Performance: recent, relevant projects, using survey responses and CPARS (Contractor Performance Assessment Reporting System) data
- Price: checked for fairness, reasonableness and unbalanced line items
What to include when you submit
- Send two volumes: Volume I non-price proposal and Volume II business and price proposal; the exact method and page limits are in Section L, which was left out of the text read
- Volume II: Standard Form 1442 (SF 1442), the solicitation, offer and award form, completed
- Volume II: acknowledge each amendment by the response due date; late or improper acknowledgment is checked
- Volume II: Section B price schedule, priced for all 3 line items; unbalanced line items are checked
- Volume II: bid guarantee on Standard Form 24 (SF 24 Bid Bond) or other suitable bid guarantee
- Volume II: Section K representations and certifications
- Volume II: General References form (Attachment 07), used to check responsibility
- Volume II: Limitation on Subcontracting report template (Attachment 10) filled with projected amounts based on your pricing and your subcontractors
- Volume I: no other submittals are required beyond those Section L lists
- Volume I project experience uses the Project Experience Questionnaire; the offeror completes the Past Performance Questionnaire sections A and B and sends it to each reference, who returns it to the contracting officer
- Key trades experience can be steel, vinyl or FRP sheet pile driving
- Send questions at least 7 days before the response due date
- Page limits and the number of projects to submit are in Section L, which was not fully read
After award, you must have
- Agree to furnish performance and payment bonds after award (the contract includes the performance and payment bonds clause) From Sol_140P2026R0081.pdf:
18. The offeror agrees to furnish any required performance and payment bonds.
- Gopher tortoise permit and relocation are the contractor's job during the work From Sol_140P2026R0081_Amd_0003.pdf:
Gopher Tortoise relocation and associated permitting will…
Not in the notice text
- Only part of the 68-page solicitation was read: Section L (full proposal instructions, page limits, number of projects) and Section H (key personnel and key trades rules) were left out, and the drawings, Vol I and Vol II forms, General References form and Limitation on Subcontracting template were attached but not read.
- Which wage rule applies is not stated in the text read; a wage determination file (Attachment 04, WD FL20260202) is attached but not read, and the bid guarantee percentage and bond amounts were not seen.
- SAM.gov shows no set-aside while the solicitation form says small business set-aside; ask the contracting officer.
- Whether a Florida state contractor license or county registration is required is not stated; the answer tells bidders to check with the state.
- Conditions of the St. Johns River Water Management District permit, still in process, are not yet available.
- The question deadline is 7 days before the response due date; Section L may give more detail.
Eligibility and how to respond
- No set-aside: any business, large or small, can bid unless the notice says otherwise.
- How and where to submit is in the notice text and its attachments on SAM.gov.
- Construction contracts over $2,000 pay at least the local Davis-Bacon wage rates, from the wage determination in the solicitation. Price your labor from it: How to price a government contract, and how Davis-Bacon differs from the Service Contract Act.
Notice details
- Posted
- Nov 5, 2026
- Notice type
- Solicitation
- Office
- DSC Contracting Services Division, Denver, CO
- Product/service code
- Y1PZ · Construction of Other Non-Building Facilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237990)
- Versions
8 versions have been posted, newest first.
- Nov 5, 2026 · Amendment 0006 (this version)Due Nov 13, 2026
- Oct 28, 2026 · Amendment 0005Due Nov 13, 2026
- Oct 28, 2026 · Amendment 0004Due Nov 13, 2026
- Oct 22, 2026 · Amendment 0003Due Nov 13, 2026 (changed)
- Oct 19, 2026 · Amendment 0002Due Nov 6, 2026
- Oct 13, 2026 · Amendment 0001Due Nov 6, 2026
- Oct 5, 2026 · SolicitationDue Nov 6, 2026 (changed)
- Sep 9, 2026 · PresolicitationDate Oct 30, 2026
- Attachments
Past awards and competition
Who has won work like this before, the likely incumbent, and what similar contracts paid, from USAspending.gov.
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation