Solicitation
Timucuan Ecological and Historic Preserve TIMU-335
Department of the Interior · National Park Service
AI summaryThe National Park Service (Denver Service Center) wants a construction contractor to stabilize the Kingsley Plantation shoreline in the Timucuan Ecological and Historic Preserve, Jacksonville, Florida, with a new sheet pile seawall in front of the existing wall and an extension east. The solicitation says it is a small business set-aside, though SAM.gov does not state one, and the work is a firm-fixed-price (FFP, one set price) contract with a stated magnitude of $1,000,000 to $5,000,000. The response due date is November 6, 2026, 5:00 PM Eastern (an amendment moved it to Nov 13, 2026, 5:00 PM EST). More in the summary
A newer version of this notice was posted Oct 22, 2026. It moves the due date from Nov 6, 2026 to Nov 13, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of the version posted Oct 13, 2026. The notice was amended Oct 22, 2026. The due date moved from Nov 6, 2026 to Nov 13, 2026. Check what else changed on SAM.gov. The notice looks incomplete: Only part of the solicitation (Sol_140P2026R0081.pdf), the Division 01 specifications, the Division 02 to 49 technical specifications and the construction drawings were read; the middle of each was left out. Check them on SAM.gov for the completion time, key trades, options and proposal delivery details. Check the attachments on SAM.gov.
The National Park Service (Denver Service Center) wants a construction contractor to stabilize the Kingsley Plantation shoreline in the Timucuan Ecological and Historic Preserve, Jacksonville, Florida, with a new sheet pile seawall in front of the existing wall and an extension east. The solicitation says it is a small business set-aside, though SAM.gov does not state one, and the work is a firm-fixed-price (FFP, one set price) contract with a stated magnitude of $1,000,000 to $5,000,000. The response due date is November 6, 2026, 5:00 PM Eastern.
Who can bid (4)
- Small business status: the solicitation says it is a Small Business Set-Aside (SAM.gov does not state a set-aside), with the size standard in clause 52.204-8 in Section K and the limitations on subcontracting clause 52.219-14 included
- A bid guarantee with the offer: a Standard Form 24 bid bond or other suitable guarantee under provision 52.228-1
- Current, active SAM.gov registration when the offer is submitted
Show all 4Show fewer
- Key personnel named in Section H and in the offer: Project Manager, Superintendent, On-site Quality Control Specialist and On-site Safety Specialist
How to submit: Electronic: one electronic copy of the price volume, no hard copies. Where to send the proposal and questions is in Section L pages that were not read., due November 6, 2026, 5:00 PM Eastern. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (10)
- Serious: Set-aside: solicitation says small business, SAM.gov says not stated. The solicitation calls itself a Small Business Set-Aside while SAM.gov lists no set-aside. Only small businesses under the NAICS size standard can expect to be considered. Ask the contracting officer to confirm.
- Serious: Bid bond and performance and payment bonds. A bid guarantee must come with the offer, and the solicitation includes performance and payment bond clauses. A firm that cannot get bonded cannot compete.
- Worth checking: The site visit was Oct 20, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered.
Show all 10Show fewer
- Worth checking: Very specific past experience required. Project experience is judged on seawall projects in hurricane-prone areas at culturally significant, publicly open sites, and Factors 5 to 7 rank among the most important factors.
- Worth checking: Safety record is scored. You must submit three years of OSHA 300A logs and an insurer statement of your EMR; fewer incidents and a lower EMR rate more favorably.
- Worth checking: Limits on subcontracting. As a set-aside, clause 52.219-14 limits how much work you can subcontract, and a worksheet of projected subcontracting amounts must go in with the offer.
- Worth checking: Liquidated damages of $1,363.00 per day. If work is not completed on time, the contractor pays $1,363.00 for each calendar day of delay.
- Worth checking: Award possible without discussions. The Government intends to award on initial proposals, so the first proposal should carry your best price and terms.
- Minor: Work in three phases with delivery and hours limits. Each phase must be substantially complete before the next starts, material deliveries are planned on Mondays and Tuesdays, and on-site work is generally 8:00 a.m. to 4:30 p.m., Monday through Friday.
- Minor: Questionnaires cite a different solicitation number. The Project Experience and Past Performance forms show solicitation 140P2026R0016, while this solicitation is 140P2026R0081. Confirm with the contracting officer that these are the right forms.
Read from the notice and 11 attachments. Show which files.
- Sol_140P2026R0081_Amd_0001.pdf (read)
- Sol_140P2026R0081.pdf (read)
- B08_-_Attachment_01_-_TIMU_335507_Div_01_Specifications.pdf (read)
- B08_-_Attachment_02_-_TIMU_335507_Div_02_TO_49_Technical_Specifications.pdf (read)
- B08_-_Attachment_08_-_SF-24_Bid_Bond.pdf (read)
- B08_-_Attachment_09_-_Pre-Bid_Walk_Map.pdf (read)
- B08_-_Attachment_05_-_Vol_I_Exp.docx (read)
- B08_-_Attachment_06_-_Vol_I_PastPerf.docx (read)
- B08_-_Attachment_07_-_Vol_II_-_GenRefs_doc.pdf (read)
- B08_-_Attachment_03_-_TIMU_335507_Construction_Drawings.pdf (read)
- B08_-_Attachment_04_-_Wage_Determination_WD_FL20260202.pdf (read)
Full summary
What they want
- Selective demolition, then install a new rigid vinyl sheet pile wall (interlocking panels driven into the ground) with tie rods and a rigid vinyl deadman wall (buried anchor) in front of the existing PVC sheet pile wall
- Install a new structural fiberglass-reinforced plastic (FRP) composite sheet pile wall to extend the wall east of the existing wall
- Other civil work: excavation, soil and gravel backfill, sodding, spartina sea grass restoration and limestone riprap (large stone) in front of the wall
- Work in three phases, each substantially complete before the next begins, as one prime contract
- Protect trees, plants, root zones and gopher tortoise burrows, and keep public use of the site least disturbed
- Priced as three lump-sum (LS, one price for the whole item) lines: new sheet pile wall in front of the existing wall, sheet pile wall extension, and site restoration
- Contract type
- Firm-fixed-price (FFP); three base contract line items (CLINs, priced lines of the order), each quantity 1 lump sum
- Place of performance
- Timucuan Ecological and Historical Preserve, 11676 Palmetto Avenue, Jacksonville, FL 32226 (SAM.gov leaves the place blank)
- Estimated value
- Magnitude of construction between $1,000,000 and $5,000,000, as stated in the solicitation
- How they'll choose
- Best value tradeoff (FAR Part 15): the Government may pay more than the lowest price when a higher-priced proposal's benefits justify it. All non-price factors combined are significantly more important than price.
- Offers due
- November 6, 2026, 5:00 PM Eastern (from the version posted Oct 13, 2026; amended since)
- How to submit
- Electronic: one electronic copy of the price volume, no hard copies. Where to send the proposal and questions is in Section L pages that were not read.
What they'll judge offers on
- Factor 1, Technical Approach
- Factor 2, Schedule: critical path, sequencing, procurement lead time, staging, and completion within the required period
- Factor 3, Management Approach: management practices, cost and quality control, team commitment and lines of communication
- Factor 4, Safety: safety program, project risk assessment, safety manager qualifications, OSHA 300A incident logs and experience modification rate (EMR, the insurer's safety rating)
- Factor 5, Project Experience: up to 3 relevant projects completed in the last 10 years
- Factor 6, Key Personnel Experience: Project Manager, Superintendent, On-site Quality Control Specialist, On-site Safety Specialist
- Factor 7, Past Performance: same projects as Factor 5, using reference questionnaires or CPARS (federal contractor performance) reports
- Price: evaluated for fairness, reasonableness and unbalanced line items
What to include when you submit
- Send two volumes: Volume I (technical, non-price proposal) and Volume II (business and price proposal).
- Volume II: complete only blocks 14 through 20C of the Standard Form 1442 (SF 1442, the construction offer form); someone with authority to bind the company must sign.
- Acknowledge Amendment 0001 and any other amendments using one of the methods in block 11 of the Standard Form 30.
- Section B price schedule with a separate Schedule of Values for each line item, broken down by major work components. Price the base items and all option items.
- Include a Standard Form 24 bid bond or other suitable bid guarantee.
- Include Section K representations and certifications; the firm must be registered in SAM.gov when it submits the offer.
- Complete the General References form and the Report on Limitation on Subcontracting worksheet (projected amounts from your pricing and your subcontractors').
- Factor 4: include the safety program overview, risk assessment, the Project Site Safety Manager's resume and training, OSHA 300A logs for the previous three calendar years, and an insurer statement showing the current EMR.
- Factor 5: send up to 3 relevant projects completed in the last 10 years, one Project Experience form per project. Relevant means similar scope and magnitude with seawall construction in hurricane-prone regions in a culturally significant setting open to the public.
- Factor 5 prime experience means working as a general contractor managing multiple subcontractors on projects where you self-performed at least 50% of the contract cost, excluding materials.
- Factor 6: send resumes for the Project Manager, Superintendent, On-site Quality Control Specialist and On-site Safety Specialist; there is no preprinted form.
- Factor 7: send the same projects as Factor 5. Send Past Performance Questionnaires (Sections I and II completed) to your references, or CPARS reports instead, and include copies of the questionnaires and reference contacts in Volume I.
- Factor 7: include a narrative of any past performance that may be less than fully satisfactory, with facts and remedial action taken.
- A subcontractor's past performance counts only if it matches the work that subcontractor will do on this project.
After award, you must have
- Performance and payment bonds under clause 52.228-15 are part of the solicitation's clauses; the bond amounts and due date are in pages not read From Sol_140P2026R0081.pdf:
52.228-15 PERFORMANCE AND PAYMENT BONDS-CONSTRUCTION (JUN 2020) (DEVIATION MAY…
Not in the notice text
- Only part of the solicitation (Sol_140P2026R0081.pdf), the Division 01 specifications, the Division 02 to 49 technical specifications and the construction drawings were read; the middle of each was left out. Check them on SAM.gov for the completion time, key trades, options and proposal delivery details.
- The number of days to complete the work and the notice-to-proceed terms; the form's fields could not be read.
- Which wage rule applies: a wage determination file is attached, but its text could not be read. Check it on SAM.gov for the Davis-Bacon (federal construction wage) rates.
- The deadline for questions, and where to send the proposal and questions; these are in Section L pages that were not read.
- Whether there are option line items: Section B says to price "all option line items" and refers to Section H, but lists only base items 0001 to 0003.
- The performance and payment bond amounts and when they are due after award.
- Proposal page limits and file format for Volume I.
Eligibility and how to respond
- No set-aside: any business, large or small, can bid unless the notice says otherwise.
- How to submit, from the AI summary: Electronic: one electronic copy of the price volume, no hard copies. Where to send the proposal and questions is in Section L pages that were not read. Check it in the notice before you send anything.
- Construction contracts over $2,000 pay at least the local Davis-Bacon wage rates, from the wage determination in the solicitation. Price your labor from it: How to price a government contract, and how Davis-Bacon differs from the Service Contract Act.
Notice details
- Posted
- Oct 13, 2026
- Notice type
- Solicitation
- Office
- DSC Contracting Services Division, Denver, CO
- Product/service code
- Y1PZ · Construction of Other Non-Building Facilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237990)
- Versions
5 versions have been posted, newest first.
- Oct 22, 2026 · Amendment 0003Due Nov 13, 2026 (changed)
- Oct 19, 2026 · Amendment 0002Due Nov 6, 2026
- Oct 13, 2026 · Amendment 0001 (this version)Due Nov 6, 2026
- Oct 5, 2026 · SolicitationDue Nov 6, 2026 (changed)
- Sep 9, 2026 · PresolicitationDate Oct 30, 2026
- Attachments
Past awards and competition
Who has won work like this before, the likely incumbent, and what similar contracts paid, from USAspending.gov.
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation