Solicitation
Timucuan Ecological and Historic Preserve TIMU-335
Department of the Interior · National Park Service
AI summaryThe National Park Service (Interior Department, DSC Contracting Services Division) wants a prime contractor for solicitation 140P2026R0081 to stabilize the Kingsley Plantation shoreline with a seawall extension at Timucuan Ecological and Historic Preserve, Jacksonville, Florida. The response due date is November 13, 2026, 5:00 PM Eastern, after Amendment 0003 extended it. The contract duration is 259 days, in three phases that must follow one another, with a magnitude of construction stated as $1,000,000 to $5,000,000. More in the summary
AI summary Beta
This summary may miss requirements: 6 of 18 attachments weren't read (B08_-_Attachment_05_-_Vol_I_Exp.docx, B08_-_Attachment_06_-_Vol_I_PastPerf.docx and 4 more). Check the attachments on SAM.gov.
The National Park Service (Interior Department, DSC Contracting Services Division) wants a prime contractor for solicitation 140P2026R0081 to stabilize the Kingsley Plantation shoreline with a seawall extension at Timucuan Ecological and Historic Preserve, Jacksonville, Florida. The response due date is November 13, 2026, 5:00 PM Eastern, after Amendment 0003 extended it. The contract duration is 259 days, in three phases that must follow one another, with a magnitude of construction stated as $1,000,000 to $5,000,000.
Who can bid
- Small business under NAICS 237990 (size standard $45M); the solicitation form says the acquisition is a small business set-aside
- Bid guarantee with the offer: SF 24 Bid Bond or other suitable bid guarantee
- Key trades and key personnel with sheet pile driving experience (steel, vinyl or FRP); a quality control (QC) manager, a site safety and health officer (SSHO) and a superintendent are named positions
Things to watch (11)
From the version posted Oct 22, 2026.
- Serious: Set-aside differs between SAM.gov and the solicitation. SAM.gov does not state a set-aside, but the solicitation form says this is a small business set-aside; check with the contracting officer which governs.
- Serious: Bid guarantee and bonds. A bid bond or other guarantee goes in with the offer, and performance and payment bonds follow award; the amounts were in parts of the solicitation not read.
- Worth checking: Phases must run one after another. No overlapping crews or phases are allowed, which limits how a bidder can shorten the 259 days.
Show all 11Show fewer
- Worth checking: Obstructions during pile driving are the bidder's risk. Pre-augering and jetting are prohibited for vinyl/FRP piles, and bidders must price a contingency for refusal on unexpected obstructions.
- Worth checking: Low-tide, daylight-only shoreline work. Shoreline pile driving, riprap and plantings only happen at low tide, in daylight, with a limit of 5 synthetic sheet piles per day, and no tree cutting during bat pup season.
- Worth checking: Permit still in process. The St. Johns River Water Management District permit is not finished; its conditions will be shared when available and could affect pricing.
- Minor: 730-day plant warranty after completion. Spartina plantings carry a 730-day warranty period with no retainage; the government can call for replacement plants.
- Minor: Work hours and delivery days limited. Work runs 8am to 5pm Monday to Friday per the answers; the division 01 specification says 8:00 a.m. to 4:30 p.m., so ask which hours govern. Large deliveries are limited to Monday and Tuesday.
- Minor: Response due date moved to November 13, 2026. Amendment 0003 extended the response due date; the original form showed 11/06/2026 at 1700, and the earlier answers refer to a November 6 deadline.
- Minor: The site visit was Oct 20, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered.
- Minor: Florida contractor license not confirmed. The government did not say if a Florida general or marine contractor license or county registration is needed; bidders must check with the state.
Read from the notice and 12 attachments. 6 of 18 not read. Show which files.
- Sol_140P2026R0081_Amd_0003.pdf (read)
- Sol_140P2026R0081_Amd_0002.pdf (read)
- Sol_140P2026R0081_Amd_0001.pdf (read)
- Sol_140P2026R0081.pdf (read)
- B08_-_Attachment_01_-_TIMU_335507_Div_01_Specifications.pdf (read)
- B08_-_Attachment_02_-_TIMU_335507_Div_02_TO_49_Technical_Specifications.pdf (read)
- 20260915_USACE_NWP_Permit_0002.pdf (read)
- B08_-_Attachment_11_-_Appendix_C-Procedure_for_Environmental_Protection_2026-10-22_Opt_0003.pdf (read)
- B08_-_Attachment_05_-_Vol_I_Exp_Updated_0002.docx (read)
- B08_-_Attachment_06_-_Vol_I_PastPerf_Updated_0002.docx (read)
- B08_-_Attachment_08_-_SF-24_Bid_Bond.pdf (read)
- B08_-_Attachment_09_-_Pre-Bid_Walk_Map.pdf (read)
- B08_-_Attachment_05_-_Vol_I_Exp.docx: not summarized: open it on SAM.gov
- B08_-_Attachment_06_-_Vol_I_PastPerf.docx: not summarized: open it on SAM.gov
- B08_-_Attachment_07_-_Vol_II_-_GenRefs_doc.pdf: not summarized: open it on SAM.gov
- B08_-_Attachment_10_-_Limitation_on_Subcontracting_Report_Template_0002.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- B08_-_Attachment_03_-_TIMU_335507_Construction_Drawings.pdf: not summarized: open it on SAM.gov
- B08_-_Attachment_04_-_Wage_Determination_WD_FL20260202.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Phases 1 and 2: build a new weatherable rigid vinyl sheet pile wall with tie rods and a vinyl deadman wall (a buried anchor wall) in front of the existing wall, west end first, then east end
- Phase 3: install a new structural fiber-reinforced plastic (FRP) composite sheet pile wall to extend the wall east
- Do selective demolition, excavation, soil and gravel backfill, sodding, spartina sea grass planting, and limestone riprap (hand-installed stone) in front of the wall
- Build and later remove a temporary haul road and fence, then seed the haul road and staging area
- Protect gopher tortoises, wetlands, trees and archaeological resources, and install at least two vibration monitors near pile driving
- Warranty work: a 730-day warranty on the spartina plantings and a 1-year general warranty after final acceptance
- Contract type
- Construction under a single prime contract; 3 contract line items (CLINs) 0001-0003, no options
- Period of performance
- 259-day contract duration per the Amendment 0003 answers; start of work 10 calendar days after notice to proceed; three sequential phases
- Place of performance
- Timucuan Ecological and Historical Preserve, 11676 Palmetto Avenue, Jacksonville, FL 32226
- Estimated value
- Magnitude of construction stated as between $1,000,000 and $5,000,000
- How they'll choose
- Best value tradeoff (Best Value Continuum process under FAR Part 15.1); the contracting officer is the source selection authority. All non-price factors combined are significantly more important than price. The Government intends to award without discussions.
- Offers due
- November 13, 2026, 5:00 PM Eastern
What they'll judge offers on
- Factor 1 Technical Approach: realistic, efficient approach that shows scope understanding
- Factor 2 Schedule: construction schedule with critical path, sequencing, procurement lead time and staging, finished within the required period
- Factor 3 Management Approach: management practices, cost and quality control, team roles and communication
- Factor 4 Safety: project-specific safety overview and risk assessment, safety personnel qualifications, OSHA 300A incidents and experience modification rate (EMR)
- Factor 5 Project Experience: similar projects, sheet pile driving experience, working near wetlands and sensitive cultural resources, seawall construction on time and within budget
- Factor 6 Key Personnel Experience: same or similar key positions on relevant projects
- Factor 7 Past Performance: recent, relevant projects, using survey responses and CPARS (Contractor Performance Assessment Reporting System) data
- Price: checked for fairness, reasonableness and unbalanced line items
What to include when you submit
- Send two volumes: Volume I non-price proposal and Volume II business and price proposal; the exact method and page limits are in Section L, which was left out of the text read
- Volume II: Standard Form 1442 (SF 1442), the solicitation, offer and award form, completed
- Volume II: acknowledge each amendment by the response due date; late or improper acknowledgment is checked
- Volume II: Section B price schedule, priced for all 3 line items; unbalanced line items are checked
- Volume II: bid guarantee on Standard Form 24 (SF 24 Bid Bond) or other suitable bid guarantee
- Volume II: Section K representations and certifications
- Volume II: General References form (Attachment 07), used to check responsibility
- Volume II: Limitation on Subcontracting report template (Attachment 10) filled with projected amounts based on your pricing and your subcontractors
- Volume I: no other submittals are required beyond those Section L lists
- Volume I project experience uses the Project Experience Questionnaire; the offeror completes the Past Performance Questionnaire sections A and B and sends it to each reference, who returns it to the contracting officer
- Key trades experience can be steel, vinyl or FRP sheet pile driving
- Send questions at least 7 days before the response due date
- Page limits and the number of projects to submit are in Section L, which was not fully read
After award, you must have
- Agree to furnish performance and payment bonds after award (the contract includes the performance and payment bonds clause) From Sol_140P2026R0081.pdf:
18. The offeror agrees to furnish any required performance and payment bonds.
- Gopher tortoise permit and relocation are the contractor's job during the work From Sol_140P2026R0081_Amd_0003.pdf:
Gopher Tortoise relocation and associated permitting will…
Not in the notice text
- Only part of the 68-page solicitation was read: Section L (full proposal instructions, page limits, number of projects) and Section H (key personnel and key trades rules) were left out, and the drawings, Vol I and Vol II forms, General References form and Limitation on Subcontracting template were attached but not read.
- Which wage rule applies is not stated in the text read; a wage determination file (Attachment 04, WD FL20260202) is attached but not read, and the bid guarantee percentage and bond amounts were not seen.
- SAM.gov shows no set-aside while the solicitation form says small business set-aside; ask the contracting officer.
- Whether a Florida state contractor license or county registration is required is not stated; the answer tells bidders to check with the state.
- Conditions of the St. Johns River Water Management District permit, still in process, are not yet available.
- The question deadline is 7 days before the response due date; Section L may give more detail.
Eligibility and how to respond
- No set-aside: any business, large or small, can bid unless the notice says otherwise.
- How and where to submit is in the notice text and its attachments on SAM.gov.
- Construction contracts over $2,000 pay at least the local Davis-Bacon wage rates, from the wage determination in the solicitation. Price your labor from it: How to price a government contract, and how Davis-Bacon differs from the Service Contract Act.
Notice details
- Posted
- Oct 22, 2026
- Notice type
- Solicitation
- Office
- DSC Contracting Services Division, Denver, CO
- Product/service code
- Y1PZ · Construction of Other Non-Building Facilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237990)
- Versions
5 versions have been posted, newest first.
- Oct 22, 2026 · Amendment 0003 (this version)Due Nov 13, 2026 (changed)
- Oct 19, 2026 · Amendment 0002Due Nov 6, 2026
- Oct 13, 2026 · Amendment 0001Due Nov 6, 2026
- Oct 5, 2026 · SolicitationDue Nov 6, 2026 (changed)
- Sep 9, 2026 · PresolicitationDate Oct 30, 2026
- Attachments
Past awards and competition
Who has won work like this before, the likely incumbent, and what similar contracts paid, from USAspending.gov.
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract