Solicitation
Timucuan Ecological and Historic Preserve TIMU-335
Department of the Interior · National Park Service
AI summaryThe National Park Service (Denver Service Center) wants a builder to stabilize the Kingsley Plantation shoreline at Timucuan Ecological and Historic Preserve in Jacksonville, FL, with a new vinyl sheet pile wall and an extension. The solicitation says it is a small business set-aside, which SAM.gov does not show. The response due date is November 6, 2026, 3:00 PM Eastern (an amendment moved it to Nov 13, 2026, 5:00 PM EST) on SAM.gov, but the solicitation and Amendment 0002 give 17:00 Eastern. More in the summary
A newer version of this notice was posted Oct 22, 2026. It moves the due date from Nov 6, 2026 to Nov 13, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of the version posted Oct 19, 2026. The notice was amended Oct 22, 2026. The due date moved from Nov 6, 2026 to Nov 13, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 4 of 16 attachments weren't read (B08_-_Attachment_07_-_Vol_II_-_GenRefs_doc.pdf, B08_-_Attachment_10_-_Limitation_on_Subcontracting_Report_Template_0002.xlsx and 2 more). Check the attachments on SAM.gov.
The National Park Service (Denver Service Center) wants a builder to stabilize the Kingsley Plantation shoreline at Timucuan Ecological and Historic Preserve in Jacksonville, FL, with a new vinyl sheet pile wall and an extension. The solicitation says it is a small business set-aside, which SAM.gov does not show. The response due date is November 6, 2026, 3:00 PM Eastern on SAM.gov, but the solicitation and Amendment 0002 give 17:00 Eastern.
Who can bid (5)
- Small business: the solicitation says it is a small business set-aside under NAICS 237990, size standard $45M (per Amendment 0002)
- Active SAM.gov registration when the offer is submitted
- Bid guarantee: a Standard Form 24 (SF 24) bid bond, or other suitable bid guarantee, with Volume II
Show all 5Show fewer
- Sheet pile driving experience (polyvinyl chloride, fiberglass-reinforced plastic or steel) for the key trades, shown in project experience
- Key personnel with resumes: Project Manager, Superintendent, On-site Quality Control Specialist and On-site Safety Specialist. The Superintendent cannot hold another role.
How to submit: Not visible in the text read; Section L of the solicitation sets how to submit proposals and questions, due November 6, 2026, 3:00 PM Eastern. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (12)
- Serious: Small business set-aside. Only small businesses can win this construction job; the size standard is $45M in average annual receipts.
- Serious: Bid bond required with the offer. You must send a Standard Form 24 bid bond or other suitable guarantee with Volume II, and the contract includes a performance and payment bonds clause, so you need a surety.
- Worth checking: Set-aside shown in the solicitation but not on SAM.gov. SAM.gov does not state a set-aside, while the solicitation says small business set-aside; confirm with the contracting officer before relying on either.
Show all 12Show fewer
- Worth checking: More amendments expected; permits not final. Natural resource protection requirements (Appendix C) will come in the next amendment, and the St. Johns River Water Management District permit is still in process.
- Worth checking: Three phases must run one after another. Each phase must be substantially complete before the next starts, and overlapping crews are not allowed, which limits how fast you can finish.
- Worth checking: Pile obstructions are on the contractor's price. Pre-augering and jetting are not allowed for the vinyl and FRP piles, so you must carry a contingency in your price for obstructions.
- Worth checking: Gopher tortoise permit and relocation are the contractor's job. You must get the permit and move the tortoises at your own cost and schedule risk, with burrows shown on drawing C1.4.
- Worth checking: Limits on subcontracting. A subcontracting percentage worksheet is required with the offer, and a limitations on subcontracting clause (FAR 52.219-14) is in the contract, so check how much you can hand to subcontractors.
- Minor: The site visit was Oct 20, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered.
- Minor: Work hours and delivery days are restricted. Amendment 0002 gives work hours of 8am to 5pm Monday to Friday with no weekend work, and large deliveries are unlikely to be approved outside Monday and Tuesday, when the park is closed.
- Minor: Two-year plant establishment as a warranty. Spartina plantings carry a 730-day warranty, with no retainage or extra bonding, so you may have to replace dead plants after finishing.
- Minor: Florida license question left to the bidder. NPS did not say whether a Florida contractor license is required, so check with the state before bidding.
Read from the notice and 12 attachments. 4 of 16 not read. Show which files.
- Sol_140P2026R0081_Amd_0002.pdf (read)
- Sol_140P2026R0081_Amd_0001.pdf (read)
- Sol_140P2026R0081.pdf (read)
- B08_-_Attachment_01_-_TIMU_335507_Div_01_Specifications.pdf (read)
- B08_-_Attachment_02_-_TIMU_335507_Div_02_TO_49_Technical_Specifications.pdf (read)
- 20260915_USACE_NWP_Permit_0002.pdf (read)
- B08_-_Attachment_05_-_Vol_I_Exp_Updated_0002.docx (read)
- B08_-_Attachment_06_-_Vol_I_PastPerf_Updated_0002.docx (read)
- B08_-_Attachment_08_-_SF-24_Bid_Bond.pdf (read)
- B08_-_Attachment_09_-_Pre-Bid_Walk_Map.pdf (read)
- B08_-_Attachment_05_-_Vol_I_Exp.docx (read)
- B08_-_Attachment_06_-_Vol_I_PastPerf.docx (read)
- B08_-_Attachment_07_-_Vol_II_-_GenRefs_doc.pdf: not summarized: open it on SAM.gov
- B08_-_Attachment_10_-_Limitation_on_Subcontracting_Report_Template_0002.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- B08_-_Attachment_03_-_TIMU_335507_Construction_Drawings.pdf: not summarized: open it on SAM.gov
- B08_-_Attachment_04_-_Wage_Determination_WD_FL20260202.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Selectively demolish parts of the existing wall and install a new weatherable rigid vinyl sheet pile wall with tie rods and a vinyl deadman wall (anchor wall) in front of the existing polyvinyl chloride (PVC) sheet pile wall, in two phases
- Install a new structural fiberglass-reinforced plastic (FRP) composite sheet pile wall extending east of the existing wall, as the third phase
- Do the civil work: excavation, soil and gravel backfill, limestone riprap in front of the wall, sodding, and Spartina marsh grass planting (about 0.019 acre Spartina alterniflora and 0.010 acre Spartina patens)
- Build and later remove a temporary haul road and staging area, then seed them
- Get the permit for, and relocate, gopher tortoises as needed
- Install at least two vibration monitoring devices (Visitor Center and Planter's House) during pile driving
- Finish within the contract duration (259 days referenced in Amendment 0002), then handle a 730-day plant warranty period
- Contract type
- Firm-fixed-price (FFP): one set price, whatever the work ends up costing. Negotiated request for proposal (RFP), single prime contract, three lump-sum line items, no options.
- Period of performance
- Start work within 10 calendar days after notice to proceed (NTP); 259-day contract duration referenced in Amendment 0002; then a 730-day plant warranty period
- Place of performance
- Timucuan Ecological and Historical Preserve, 11676 Palmetto Avenue, Jacksonville, FL
- Estimated value
- Magnitude of construction stated as between $1,000,000 and $5,000,000
- How they'll choose
- Best value tradeoff: the Government may pay more for a stronger proposal. All non-price factors combined are significantly more important than price. Award is intended without discussions.
- Offers due
- November 6, 2026, 3:00 PM Eastern (from the version posted Oct 19, 2026; amended since)
- How to submit
- Not visible in the text read; Section L of the solicitation sets how to submit proposals and questions
What they'll judge offers on
- Factor 1, Technical Approach
- Factor 2, Schedule: critical path, sequencing, lead times and completion within the required period
- Factor 3, Management Approach
- Factor 4, Safety: overview, risk assessment, safety personnel, OSHA 300A incident counts and experience modification rate (EMR)
- Factor 5, Project Experience: relevant projects of similar scope and size, including natural and cultural resource protection and seawall construction
- Factor 6, Key Personnel Experience: resumes for Project Manager, Superintendent, On-site Quality Control Specialist, On-site Safety Specialist
- Factor 7, Past Performance
- Price: checked for fairness, reasonableness and unbalanced line items
What to include when you submit
- Send two volumes: Volume I (non-price technical proposal) and Volume II (business and price proposal); Volume II is one electronic copy, no hard copies
- Volume I: address Factors 1 to 7, with resumes for the four key personnel (no preprinted form)
- Project experience: use the Project Experience Questionnaire; the same projects are also used for past performance
- Past performance: send the Past Performance Questionnaire to your references (or a CPARS report instead), include copies with the reference contact details, and disclose any less than fully satisfactory past performance with remedial action
- Volume I has no other required submittals (Amendment 0002)
- Volume II folders: Standard Form 1442 (SF 1442, the offer form, blocks 14 to 20C only, signed by someone who can bind the company), amendments acknowledged, Section B price schedule with a schedule of values for each line item, SF 24 bid bond or other suitable bid guarantee, Section K representations and certifications, General References form, and Subcontracting Percentage Worksheet
- Acknowledge all amendments (Amendments 0001 and 0002 so far)
After award, you must have
- Gopher tortoise permit and relocation done by the contractor during the work From Sol_140P2026R0081_Amd_0002.pdf:
…contractor will be responsible for obtaining the permit and relocating gopher tortoises as needed for construction.
Not in the notice text
- Much of the solicitation (Sections F through L, including key personnel and trades, bonding terms, number of projects to send, page limits and how to submit) is in the middle of Sol_140P2026R0081.pdf, attached but only partly read.
- Wage determination WD FL20260202 is attached but not read, so which wage rule applies (such as Davis-Bacon) is not confirmed here.
- The construction drawings, the General References form and the Limitation on Subcontracting template are attached but not read; the specifications and the permit file were only partly read.
- How many past projects to submit and the time window for them are not visible in the text read.
- Amendment 0001 asks firms to email the contracting officer to attend the site visit but gives no RSVP deadline.
- The liquidated damages rate for late completion is not visible in the text read.
- The Appendix C natural resource protection requirements and the final St. Johns River Water Management District permit are not yet posted.
Eligibility and how to respond
- No set-aside: any business, large or small, can bid unless the notice says otherwise.
- How to submit, from the AI summary: Not visible in the text read; Section L of the solicitation sets how to submit proposals and questions. Check it in the notice before you send anything.
- Construction contracts over $2,000 pay at least the local Davis-Bacon wage rates, from the wage determination in the solicitation. Price your labor from it: How to price a government contract, and how Davis-Bacon differs from the Service Contract Act.
Notice details
- Posted
- Oct 19, 2026
- Notice type
- Solicitation
- Office
- DSC Contracting Services Division, Denver, CO
- Product/service code
- Y1PZ · Construction of Other Non-Building Facilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237990)
- Versions
5 versions have been posted, newest first.
- Oct 22, 2026 · Amendment 0003Due Nov 13, 2026 (changed)
- Oct 19, 2026 · Amendment 0002 (this version)Due Nov 6, 2026
- Oct 13, 2026 · Amendment 0001Due Nov 6, 2026
- Oct 5, 2026 · SolicitationDue Nov 6, 2026 (changed)
- Sep 9, 2026 · PresolicitationDate Oct 30, 2026
- Attachments
Past awards and competition
Who has won work like this before, the likely incumbent, and what similar contracts paid, from USAspending.gov.