Solicitation
SLV-CB Pumping Plant Roof
Department of the Interior · Bureau of Reclamation
AI summaryThe Bureau of Reclamation (Upper Colorado Regional Office, for its Alamosa Field Division) wants a small business to repair or replace the flat roof of the San Luis Lakes Pumping Plant near Mosca, Colorado. It is set aside for total small business and will be one firm-fixed-price (FFP) lump sum: one set price, whatever the work ends up costing. Work runs December 1, 2026 to April 1, 2027, the response due date is November 2, 2026, 1:00 PM MST, and a bid guarantee and bonds are required if the price is over $150,000. More in the summary
A newer version of this notice was posted Oct 22, 2026. See the latest version.
AI summary Beta
Summary of the version posted Oct 14, 2026. The notice was amended Oct 22, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 1 of 11 attachments weren't read (Attachment_2_-_Pricing_Schedule_fillable.xlsx). Check the attachments on SAM.gov.
The Bureau of Reclamation (Upper Colorado Regional Office, for its Alamosa Field Division) wants a small business to repair or replace the flat roof of the San Luis Lakes Pumping Plant near Mosca, Colorado. It is set aside for total small business and will be one firm-fixed-price (FFP) lump sum: one set price, whatever the work ends up costing. Work runs December 1, 2026 to April 1, 2027, the response due date is November 2, 2026, 1:00 PM MST, and a bid guarantee and bonds are required if the price is over $150,000.
Who can bid (5)
- Total small business set-aside under NAICS 238160 (Roofing Contractors), size standard $19.0M; only small businesses can bid.
- Active SAM.gov registration with a Unique Entity Identifier (UEI), which goes on the cover sheet.
- If the offer is over $150,000: a bid guarantee with the quote, then performance and payment bonds each for 100 percent of the contract price.
Show all 5Show fewer
- Contractors, subcontractors, manufacturers and suppliers must each have at least three years of roofing experience.
- The contractor must be a material manufacturer-certified installer.
How to submit: Email to Contract Specialist Ronda Lucero at ronda_lucero@ios.doi.gov, with the solicitation number 140R4026Q0141 in the subject line; each required document as a separate file. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (9)
- Serious: Total small business set-aside. Only small businesses can bid; larger firms are not eligible.
- Serious: Bid guarantee and bonds required if the price is over $150,000. Amendment 0002 added a bid guarantee (20 percent of the bid or $30,000.00, whichever is less) plus performance and payment bonds at 100 percent of price; a bid guarantee in the wrong form or amount may get the bid rejected.
- Worth checking: Payment protection rules differ between documents. The original solicitation requires a payment bond or letter of credit for 100 percent of price within 21 days of award, while Amendment 0002 requires bonds only above $150,000. Ask the contracting officer what applies at or below $150,000.
Show all 9Show fewer
- Worth checking: Repair or replacement is decided after assessment, but the quote must pick one. The statement of work says the work depends on direction given after assessment, yet bidders must submit either the repair or the replacement price schedule.
- Worth checking: Manufacturer-certified installer and 10-year material warranty. The contractor must be a manufacturer-certified installer and the manufacturer warranty must run at least 10 years, covering leaks, ponding, wind uplift and installation errors.
- Minor: The site visit was Oct 14, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered.
- Minor: Davis-Bacon wage rates apply. A Davis-Bacon Act wage determination (CO20260001, federal minimum pay for construction workers) is attached, so bid with those wages and keep payroll records.
- Minor: Government review of each submittal takes at least 21 calendar days. Schedule, safety plan and method submittals need Government approval before work, which can eat into the December 1, 2026 to April 1, 2027 performance period.
- Minor: Site security and ID rules for the crew. Crew needs Government-issued ID cards or badges, escorts in sensitive areas, and a signed Facility Security Agreement; lost cards can be charged up to $500 each.
Read from the notice and 10 attachments. 1 of 11 not read. Show which files.
- Sol_140R4026Q0141_Amd_0002.pdf (read)
- Sol_140R4026Q0141_Amd_0001.pdf (read)
- Sol_140R4026Q0141.pdf (read)
- Attachment_1_-_SLV-CB_PUMPING_PLANT_ROOF_SOW.docx (read)
- Attachment_4_-_SF24_0002.pdf (read)
- Attachment_5_-_SF25_0002.pdf (read)
- Attachment_6__-_SF25A_0002.pdf (read)
- Attachment_2a_-_Pricing_Schedule_Repair.docx (read)
- Attachment_2b_-_Pricing_Schedule_Replacement.docx (read)
- Attachment_3_-_DBA_WD_CO20260001.pdf (read)
- Attachment_2_-_Pricing_Schedule_fillable.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
Full summary
What they want
- Inspect the roof (membrane, deck, flashing, penetrations, drainage), then do either a repair or a full replacement of the flat roof, as directed after the assessment. The building footprint is approximately 2,200 square feet.
- Fix the low spot that ponds water: improve slope, replace weakened or damaged decking, install a new membrane, reseal, and repair or replace the roof drain and flashing.
- Remove and legally dispose of old roofing, insulation, fasteners and debris; clean the work area daily and haul debris away at least weekly.
- Keep the pumping plant running during the work and keep debris and water out of its mechanical and electrical systems.
- Provide a manufacturer warranty of at least 10 years, installed by a manufacturer-certified installer.
- Send the Government a project schedule within 14 days after award, a safety plan and job hazard analyses at least 7 days before mobilizing, and as-built drawings at least 21 days before the final invoice.
- Tell the Contracting Officer (CO) and Contracting Officer's Representative (COR) at least 5 working days before bringing people and equipment to the site.
- Attend a post-award conference before starting work, in person at the Alamosa Field Division office and virtually through Microsoft Teams.
- Contract type
- Single firm-fixed-price (FFP) purchase order, lump sum, awarded by comparative evaluation
- Period of performance
- December 1, 2026 to April 1, 2027
- Place of performance
- San Luis Lakes State Wildlife Area, 16399 Lane 6 N, Mosca, CO 81146 (Alamosa County)
- Estimated value
- Government's estimate of the project's magnitude: between $100,000 and $250,000
- How they'll choose
- Comparative evaluation of all quotes for best value; a higher-priced quote may be selected if it offers greater technical value. Non-price factors combined are approximately equal to price.
- Offers due
- November 2, 2026, 1:00 PM MST (from the version posted Oct 14, 2026; amended since)
- How to submit
- Email to Contract Specialist Ronda Lucero at ronda_lucero@ios.doi.gov, with the solicitation number 140R4026Q0141 in the subject line; each required document as a separate file
What they'll judge offers on
- Technical Approach: clarity, feasibility and soundness of the approach to repair or full roof replacement, drainage improvements, debris management, safety compliance and project coordination
- Relevant Experience / Past Performance: relevance and quality of prior projects, with emphasis on comparable work
- Price: total proposed price, checked for reasonableness and overall value
What to include when you submit
- File 1, cover sheet: business name and contact information, Unique Entity Identifier (UEI), point of contact, and quotation acceptance period.
- File 2, signed Standard Form 1442 (SF 1442, the construction offer form), with acknowledgment of Amendment 0001 and Amendment 0002.
- File 3, technical approach narrative: how all SOW work will be done, including repair or full roof replacement, drainage improvements, debris management, safety compliance and overall project coordination.
- File 4, relevant experience: up to three examples of similar roofing projects completed within the past five years (flat roof repair, replacement or upgrade, flashing, drainage improvements, protection of adjacent facility operations).
- For each project give name and location, description of work, actual dates and duration, and a reference contact (name, phone, email) from the acquiring customer; if subcontractors are proposed, include examples for each.
- File 5, price quote: the completed Price Schedule for your proposed repair (Attachment 2a) or replacement (Attachment 2b) at a firm fixed price for all work, plus a detailed price breakdown (labor categories, hours and rates; equipment and materials; subcontractors; travel; other direct costs; overhead, G&A and profit). Partial quotes will not be considered.
- If the price is over $150,000, include a bid guarantee (such as a bid bond on Standard Form 24) of 20 percent of the bid price or $30,000.00, whichever is less.
- Verify with the Contract Specialist that the email was received.
After award, you must have
- All crew and subcontractor staff with site access must be U.S. citizens or foreign individuals legally residing in or legally admitted to the U.S., and must hold a Government-issued ID card or visitor badge. From Sol_140R4026Q0141.pdf:
…with access to the work site shall be U.S. citizens…
- Payment protection (a payment bond or irrevocable letter of credit) for 100 percent of the contract price within 21 days of award. From Sol_140R4026Q0141.pdf:
The submission of the payment protection is required within 21 days of contract award.
Not in the notice text
- Attachment 2 - Pricing Schedule_fillable.xlsx is attached but not read; the repair and replacement price schedules (Attachments 2a and 2b) were read.
- Whether the Government will direct repair or full replacement after assessment is not stated; drawings are reference only and design data is available only on request.
- Whether any payment protection is needed when the price is $150,000 or less is not clear (see red flags).
- How many days the quote must be held (the quotation acceptance period) is left for the bidder to state on the cover sheet.
Eligibility and how to respond
- Set aside for small businesses: only a business that counts as small under this notice's NAICS code can bid as the prime contractor. More open small business set-asides under NAICS 238160
- How to submit, from the AI summary: Email to Contract Specialist Ronda Lucero at ronda_lucero@ios.doi.gov, with the solicitation number 140R4026Q0141 in the subject line; each required document as a separate file. Check it in the notice before you send anything.
- SAM.gov has no description for this notice beyond its title. The work is described in its attachments, listed under Notice details.
- Construction contracts over $2,000 pay at least the local Davis-Bacon wage rates, from the wage determination in the solicitation. Price your labor from it: How to price a government contract, and how Davis-Bacon differs from the Service Contract Act.
Notice details
- Posted
- Oct 14, 2026
- Notice type
- Solicitation
- Office
- Upper Colorado Regional Office, Salt Lake City, UT
- Product/service code
- Z2EB · Repair or Alteration of Maintenance Buildings
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 238160)
- Versions
4 versions have been posted, newest first.
- Oct 22, 2026 · Amendment 0003Due Nov 2, 2026
- Oct 14, 2026 · Amendment 0002 (this version)Due Nov 2, 2026
- Oct 13, 2026 · Amendment 0001Due Nov 2, 2026
- Oct 8, 2026 · SolicitationDue Nov 2, 2026
- Attachments
Past awards and competition
Who has won work like this before, the likely incumbent, and what similar contracts paid, from USAspending.gov.
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Roof RepairThe U.S. Department of Agriculture's Animal and Plant Health Inspection Service (APHIS) plant protection office in Wilmington, NC wants the shingle roof replaced on its building…
- GAOA Mesa Falls VC Roof Repairs in Caribou-Targhee National Forest, IdahoThe USDA Forest Service (Caribou-Targhee National Forest) wants a small business roofing contractor to replace the corrugated metal roof and flashing on the Mesa Falls Visitor…
- N0017327Q5317- Roof Membrane Replacement and Waterproofing
- USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CAThe U.S. Army Corps of Engineers Sacramento District wants a construction contractor to renovate three irrigation pumping plants (Elkhorn, Riverside and Pritchard) along the…