Combined Synopsis/Solicitation
GAOA Mesa Falls VC Roof Repairs in Caribou-Targhee National Forest, Idaho
Department of Agriculture · Forest Service · Sol. 1240LT27Q0003
Due in 53 daysSmall business
AI summary Beta
Some details are in the notice's attachments, which this summary didn't read. Check the attachments on SAM.gov.
The U.S. Forest Service wants a roofing contractor to replace the metal roof and paint and stain the outside of the Mesa Falls Visitor Center in the Caribou-Targhee National Forest near Idaho Falls, Idaho. It is a small business set-aside with a base bid and optional items. Offers are due December 1, 2026.
Watch out for
- Remote site. A visitor center in a national forest in Idaho can mean travel, lodging and weather issues that raise your cost.
- Optional bid items. You must price the optional items, and the government may or may not exercise them.
snow guards and the repair of all round framing at all overhangs will be Optional Bid Items
Read from the notice text only.
Full brief
What they want
- Remove and replace the corrugated metal panel roofing, trim and flashing
- Prep and stain or paint the exterior log walls, wood shingle walls, trim, doors and windows
- Repair woodpecker damage and other minor repairs
- Repair damaged overhang framing at one location
- Remove and properly dispose of all demolished materials
- Provide all materials
- Optional items: snow guards and repair of round framing at overhangs
- Place of performance
- Mesa Falls Visitor Center, Caribou-Targhee National Forest, Idaho Falls, ID
- Offers due
- 2026-12-01T15:00:00-07:00
What to include when you submit
- Price the Base Bid and the Optional Bid Items
You must have
- Small business set-aside (total). Only small businesses can compete.
Not in the notice text
- Contract type and how the award is decided
- Time allowed to finish the work
- Estimated value or magnitude
- Bonding, insurance or other requirements
- How to submit the offer
- Whether a site visit is held
Is this a fit for your business?
Create a free accountFedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Response due
- Dec 1, 2026, 10:00 PM UTC
- Posted
- Oct 7, 2026
- Notice type
- Combined Synopsis/Solicitation
- Solicitation
- 1240LT27Q0003
- Agency
- Department of Agriculture · Forest Service
- Office
- USDA Forest Service
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238160
- Product/service code
- Z2AZ
- Business type
- Construction & renovation
- Place of performance
- Idaho Falls, ID, 83401
- Contracting contact
- James Edingtonjames.edington@usda.gov
Full notice text from SAM.gov
This project consists of roof and other maintenance work on the Mesa Falls Visitor’s Center on the Caribou-Targhee National Forest to provide deferred maintenance work. The facility is operated by the Caribou-Targhee NF and Harriman State Park on the Ashton / Island Park Ranger District in Idaho Falls, Idaho. Reroofing, painting / staining the exterior, and other minor repairs will be part of the Base Bid, and snow guards and the repair of all round framing at all overhangs will be Optional Bid Items. The existing corrugated metal panel roofing and all metal trim and flashing will be removed and replaced. All exterior log walls, wood shingle walls, and all trim, doors, and windows will be prepped and stained / painted. Exterior woodpecker damage will be repaired as noted. Damaged overhang framing at one location will be repaired as noted. Work includes the removal and proper disposal of all demolished materials. Contractor shall provide all required materials.
Similar open opportunities
- 671-24-004 NRM Replace 2nd Floor RoofThe VA's Network Contract Office 17 is seeking sealed bids (an Invitation for Bid) to replace the 2nd floor roof at the South Texas Veterans Healthcare System in San Antonio, TX.…
- Dworshak Powerhouse Roof ReplacementThe Army Corps of Engineers Walla Walla District plans to replace the roofs at the Dworshak Powerhouse in Ahsahka, Idaho.
- PRD B290 RoofThe USDA Forest Service is buying a new insulated PVC roof (a "metal retrofit" over the existing metal roof) and new gutters for Building 290, the welding shop at the Pine Ridge…
- Mosquito Lake Control Tower Structural Standing Seam Metal Roof ReplacementThe U.S. Army Corps of Engineers, Pittsburgh District, wants a contractor to replace the standing seam metal roof on the Control Tower Building at Mosquito Creek Lake in…
- Replace Roof and Hatches, ITO ATCT, Hilo, HawaiiThe FAA is requesting offers to replace the roof and hatches at the Hilo Air Traffic Control Tower (ITO ATCT), 102 Ailolo Street, Hilo, Hawaii.