Solicitation
Lock and Dam 25 New 1,200 FT Lock Navigation and Ecosystem Sustainability Program (NESP)
Department of Defense · Department of the Army
AI summary Beta
Some details are in the notice's attachments, which this summary didn't read. Check the attachments on SAM.gov.
The Department of the Army (W07V ENDIST St. Louis) wants a contractor to build a new 1,200-foot lock at Lock and Dam 25, in the Missouri place of performance. The response due date is December 9, 2026, 10:00 AM Central. Most requirements are in attachments, and the plans must be requested by email.
Things to watch
From the version posted Nov 20, 2026.
- Worth checking: Plans and model must be requested by email. The plans and the 3D model are not posted with the notice, so a business has to ask for them before it can price the job.
- Worth checking: Site visit details are in an attachment. The notice points to an update labeled 0817 for the pre-proposal site visit. Whether the visit is required, and its date, are not in the notice text.
- Minor: Response due date extended by Amendment 0005. Amendment 0005 sets the response due date to 10:00 AM Central, Wednesday, December 9, 2026. The notice has had seven amendments, with more answers possibly in attachments.
Read from the notice text only.
Full summary
What they want
- Build a new 1,200-foot lock on drilled shaft foundations in the auxiliary miter gate bay (the existing lock's spare gate bay)
- Build a 1,200-foot upstream ported guard wall
- Build a 650-foot downstream guard wall
- Leave the existing 600-foot lock in place; it becomes an auxiliary lock chamber
- Place of performance
- MO
- Estimated value
- Not stated
- Offers due
- December 9, 2026, 10:00 AM Central
What to include when you submit
- Request Attachment 0004 Plans (Volume 1-7) and Attachment 0005 Navisworks Federated Model by email to Contract Specialist Whitney Dee at whitney.r.dee@usace.army.mil
- The files are sent through DoD SAFE (a Department of Defense secure file transfer service) because they are too large for PIEE or email
Not in the notice text
- The full solicitation, specifications, instructions and evaluation factors are in the attachments, which were not read
- Whether the pre-proposal site visit is required, and its date, are in the update labeled 0817
- Which wage rule applies; Amendment 0007 updates Section 00 21 16 and Wage Determinations, but the text does not name the wage law
- Contract type, period of performance, estimated value, bonding and set-aside are not stated in the text
- How to submit a proposal is not stated in the text
Notice details
Notice type, codes, versions and files
- Posted
- Nov 20, 2026
- Notice type
- Solicitation
- Office
- W07V ENDIST St Louis, Saint Louis, MO
- Product/service code
- Y1PZ · Construction of Other Non-Building Facilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237990)
- Versions
16 versions have been posted, newest first.
- Nov 20, 2026 · Amendment 0007 (this version)Due Dec 9, 2026
- Nov 12, 2026 · AmendmentDue Dec 9, 2026
- Oct 21, 2026 · AmendmentDue Dec 9, 2026 (changed)
- Oct 20, 2026 · AmendmentDue Nov 16, 2026
- Oct 6, 2026 · AmendmentDue Nov 16, 2026
- Sep 16, 2026 · AmendmentDue Nov 16, 2026
- Sep 2, 2026 · AmendmentDue Nov 16, 2026
- Aug 17, 2026 · AmendmentDue Nov 16, 2026
- Jul 14, 2026 · SolicitationDue Nov 16, 2026 (changed)
- Jul 14, 2026 · AmendmentDate Jul 14, 2026 (changed)
- Jun 2, 2026 · PresolicitationDate Jul 15, 2026 (changed)
- May 8, 2026 · Sources SoughtDue May 15, 2026 (changed)
- May 4, 2026 · AmendmentDate Jun 12, 2026
- May 4, 2026 · PresolicitationDate Jun 12, 2026 (changed)
- Apr 2, 2026 · AmendmentDate May 1, 2026
- Mar 31, 2026 · Special NoticeDate May 1, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
NESP LD25 1200 ft Lock --------- The new lock at Lock 25 will be constructed in the downstream direction in the auxiliary miter gate bay, which has minimum provisions for an adjacent 360-foot-long lock and is referred to as Location 3 in the System Feasibility Study (September 2004). This contract will consist of construction of a new 1,200-foot drilled shaft-founded lock in the auxiliary miter gate bay, a 1,200-foot upstream ported guard wall, and a 650-foot downstream guard wall. The existing 600-foot lock will remain in place and once the new lock is constructed and operational, will become an auxiliary lock chamber used primarily by recreation traffic or when the 1,200 ft lock is out of service. ------------ SEE ATTACHMENT FOR FULL DETAILS OF UPCOMING REQUIREMENT SOLICITATION. --------- Attachment 0004 Plans (Volume 1-7) and Attachment 0005 Navisworks Federated Model must be requested via email to Contract Specialist, Whitney Dee at whitney.r.dee@usace.army.mil. Upon request they will be sent via DoD SAFE, since the files are too large to attach within PIEE or send via email. ------ SEE UPDATE LABELED 0817 FOR FULL DETAILS OF UPCOMING PRE-PROPOSAL SITE VISIT. -------------------- AMENDMENT 0001 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 31 August 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0002 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 15 September 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0003 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 5 October 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0004 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 20 October 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0005 extends the proposal due date to 10:00AM CST, Wednesday, December 9, 2026. See all attachments for full details..-------------------- AMENDMENT 0006 provides updates in accordance with the final set of ProjNet Bidder Inquiries and Government Responses. See all attachments for full details.-------------------- AMENDMENT 0007 provides updates to Section 00 21 16 and Wage Determinations. See all attachments for full details.
Similar open opportunities
- Navigation Lock Tainter Valve (TV) Repair, TV1The U.S. Army Corps of Engineers (USACE) Portland District wants a contractor to repair and rehabilitate one Tainter Valve (TV1) at The Dalles Lock and Dam, WA, on a…
- John Day Dam Navigation Lock Tainter Valve (TV) Repairs TV3 and TV4The U.S. Army Corps of Engineers (USACE) Portland District wants construction firms to bid a firm-fixed-price (FFP: one set price, whatever the work costs) contract to repair and…
- Port Fourchon Navigation Channel, Maintenance Dredging FY26, Lafourche Parish, LAThe U.S. Army Corps of Engineers, New Orleans District, wants a contractor to maintenance-dredge the Port Fourchon Navigation Channel in Lafourche Parish, Louisiana and place the…
- Freshwater Bayou - Lock to The Gulf, Freshwater Bayou Maintenance Dredging #26-2, ED 26-025The U.S. Army Corps of Engineers, New Orleans District, wants a contractor to dredge the Freshwater Bayou navigation channel in Vermilion Parish, Louisiana, and pump the sand…
- Pensacola Harbor Navigation Channel Maintenance Dredging