Solicitation
Freshwater Bayou - Lock to The Gulf, Freshwater Bayou Maintenance Dredging #26-2, ED 26-025
Department of Defense · Department of the Army
AI summary Beta
This summary may miss requirements: 1 of 2 attachments weren't read (W912P826BA017_Advertised_Plans.pdf). Check the attachments on SAM.gov.
The U.S. Army Corps of Engineers, New Orleans District, wants a contractor to dredge the Freshwater Bayou navigation channel in Vermilion Parish, Louisiana, and pump the sand onto the Gulf shoreline west of the channel as beach nourishment. It is a sealed-bid, firm-fixed-price job estimated at $10 to $25 million, open to all bidders (not a set-aside). The bid opening date will be set by a later amendment.
Who can bid (6)
- Active SAM registration From W912P826BA017 Package FINAL.pdf
- Bid guarantee of 20% of the bid price or $3,000,000, whichever is less From W912P826BA017 Package FINAL.pdf
- Current USACE National Dredging Quality Management (DQM) certification for the dredge instrumentation system From W912P826BA017 Package FINAL.pdf
Show all 6Show fewer
- A cutterhead dredge and attendant plant meeting the data sheet From W912P826BA017 Package FINAL.pdf
- Representations and certifications must be submitted with the bid From W912P826BA017 Package FINAL.pdf
- Open to all bidders, no set-aside
How to submit: Sealed bid to the Corps (hand-carried bids are mentioned); questions to Evan Woitha at EVAN.G.WOITHA@USACE.ARMY.MIL or (504) 862-1214, email preferred. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (6)
From the version posted Jun 22, 2026.
- Serious: Heavy equipment and big dollars. This is a $10 to $25 million dredging job needing a cutterhead pipeline dredge, tenders and survey boats, plus a bid guarantee up to $3 million, which few small businesses can field. From W912P826BA017 Package FINAL.pdf
- Worth checking: Real-time dredge monitoring system required. The dredge must have a certified USACE DQM system sending data continuously, and data gaps can cost up to 10% of progress payments. From W912P826BA017 Package FINAL.pdf
- Worth checking: Weather risk without pay. Rough weather can stop work with no payment for lost time, though you may ask for more contract time. From W912P826BA017 Package FINAL.pdf
Show all 6Show fewer
- Worth checking: Price rules can knock out a bid. A bid is non-responsive if both unit price and total are left blank for any item, and materially unbalanced line items can be rejected. From W912P826BA017 Package FINAL.pdf
- Worth checking: Davis-Bacon wages likely apply (a general rule). This is the general rule, not something the notice says: federal construction over $2,000 in the U.S. pays at least the Davis-Bacon wage rates in the wage determination attached to the solicitation. This summary doesn't name one: find it on SAM.gov and price your labor from it.
- Minor: Bid date not set and middle of package missing. The bid opening will come by amendment, and key parts of the package (contract duration, liquidated damages, bonding, other specifications) were not readable.
Read from the notice and 1 attachment. 1 of 2 not read. Show which files.
- W912P826BA017 Package FINAL.pdf (read)
- W912P826BA017_Advertised_Plans.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Dredge about 900,000 cubic yards (700,000 plus up to 200,000 more) from Freshwater Bayou channel, station 70+00 (mile 1.3) to station -210+00 (mile -4.0), down to elevation -16.0 MLG
- Pump the dredged material to the Gulf shoreline beach disposal area, building a continuous deposit at +4.5 to +5.0 feet MLG
- Mobilize and demobilize the dredge plant
- Provide aerial photography documentation
- Use a cutterhead pipeline dredge with a current USACE Dredging Quality Management (DQM) certification and send real-time dredge data to the Corps
- Submit a plan for disposal of dredged material at least 7 days before starting
- Meet EM 385-1-1 safety requirements and a contractor quality control program
- Contract type
- Sealed bid (IFB), firm-fixed-price, unit-priced bidding schedule; award as a whole to one bidder
- Place of performance
- Freshwater Bayou channel and Gulf shoreline, Vermilion Parish, Louisiana
- Estimated value
- Magnitude of construction between $10,000,000 and $25,000,000
- How they'll choose
- Sealed bid: bidders price each line item and one bidder gets the whole award. The readable text does not spell out the award basis.
- Offers due
- Bid opening to be set by amendment; SAM.gov currently lists Jun 18, 2028 10:00 AM (UTC-05:00), which looks like a placeholder
- How to submit
- Sealed bid to the Corps (hand-carried bids are mentioned); questions to Evan Woitha at EVAN.G.WOITHA@USACE.ARMY.MIL or (504) 862-1214, email preferred
What to include when you submit
- Fill in unit prices and extended amounts for every line; leaving both blank makes the bid non-responsive
- Submit a bid guarantee with the bid
- Complete the Section 00 45 00 representations and certifications, or attach SAM online reps and certs that are valid through award
- Acknowledge all amendments
- Fill in the Dredge and Attendant Plant Data Sheet describing your equipment
Not in the notice text
- Contract performance period and completion deadline (SF 1442 blanks and the middle of the package were not readable)
- Whether performance and payment bonds are required after award, and any liquidated damages amount
- The actual bid opening date and time
- Plans and drawings (the advertised plans PDF is a scan and could not be read)
- Contents of the large middle portion of the package that was left out of the text
- Whether there's a site visit: this summary doesn't say. Check the solicitation and its amendments on SAM.gov.
Notice details
Notice type, codes, versions and files
- Posted
- Jun 22, 2026
- Notice type
- Solicitation
- Office
- W07V ENDIST New Orleans, LA
- Product/service code
- Y1KF · Construction of Dredging Facilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237990)
- Versions
2 versions have been posted, newest first.
- Jun 22, 2026 · Amendment 0001 (this version)Due Jun 18, 2028
- Jun 18, 2026 · SolicitationDue Jun 18, 2028
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 2-2025 (OM25276)The Army Corps of Engineers New Orleans District plans to solicit a fully crewed cutterhead dredge to do maintenance dredging in the Mississippi River Southwest Pass.
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275)The U.S. Army Corps of Engineers New Orleans District wants one fully crewed cutterhead dredge for maintenance dredging of the Mississippi River Southwest Pass in Plaquemines…
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)The Army Corps of Engineers New Orleans District wants one fully crewed cutterhead dredge (30 inch or larger discharge) to maintenance-dredge the Mississippi River at Southwest…
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 4-2025 (OM25278)The U.S. Army Corps of Engineers New Orleans District wants a contractor to supply one fully crewed cutterhead dredge for maintenance dredging of the Mississippi River Southwest…
- Tiger Pass Dredging Over Utility Corridor, Plaquemines Parish,The U.S. Army Corps of Engineers, New Orleans District wants a contractor to dredge the Tiger Pass Bar Channel over a utility corridor in Plaquemines Parish, Louisiana, dispose…