Presolicitation
Space Propulsion Research and Innovation for Neutralizing Satellite Threats (SPRINT) Broad Agency Announcement (BAA)
Department of Defense · Department of the Air Force
Response due Jan 23, 2027 · USA (varies by award and 1 more place (from the AI summary)
Advance notice of a coming solicitation, not a bid yet. If it asks for capability statements, sending one is free and puts you on Department of the Air Force's list before the solicitation is posted. See the contact
A newer version of this notice was posted Apr 30, 2026. It moves the due date from Jan 23, 2024 to Jan 23, 2027, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of another version of this notice: check what changed on SAM.gov.
The Air Force Research Laboratory (AFRL) Rocket Division at Edwards AFB runs an open, long-term Broad Agency Announcement (BAA) called SPRINT. It funds research and development of spacecraft propulsion technology (chemical, electric and multi-mode thrusters, plume studies and mission analysis) to make satellites more resilient. You send a short white paper at any time, and the Air Force may then request a full proposal; awards are expected to run 3 to 60 months and be mostly cost-reimbursement.
Who can bid (6)
- Unrestricted competition; small businesses are encouraged but there is no set-aside From BAA-RQR-2019-0001_SPRINT_BAA Amendment 10 30 Apr 26.docx
- Foreign persons and foreign-owned firms cannot propose From BAA-RQR-2019-0001_SPRINT_BAA Amendment 10 30 Apr 26.docx
- Register and certify with the Defense Logistics Services Center for the Military Critical Technical Data Agreement (DD Form 2345) and submit the approved copy with your white paper From BAA-RQR-2019-0001_SPRINT_BAA Amendment 10 30 Apr 26.docx
Show all 6Show fewer
- Active SAM.gov registration before award and through final payment From BAA-RQR-2019-0001_SPRINT_BAA Amendment 10 30 Apr 26.docx
- An accounting system adequate for tracking costs, because cost-reimbursement contracts are expected From BAA-RQR-2019-0001_SPRINT_BAA Amendment 10 30 Apr 26.docx
- Some calls may need security clearances up to Top Secret/SCI, and export-control (ITAR/EAR) handling From BAA-RQR-2019-0001_SPRINT_BAA Amendment 10 30 Apr 26.docx
How to submit: Email white papers (PDF) to AFTC.SPRINT.BAA@us.af.mil and CC the contracting officer, Alessandra Barzaghi-Martin. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (7)
From the version posted Apr 30, 2026.
- Serious: Foreign-owned firms barred. Any foreign person or foreign-owned firm is excluded from proposing, which also affects teaming choices. From BAA-RQR-2019-0001_SPRINT_BAA Amendment 10 30 Apr 26.docx
- Serious: Classified work possible. Some calls may require Top Secret/SCI access, which needs a facility and staff clearances most small firms do not have. From BAA-RQR-2019-0001_SPRINT_BAA Amendment 10 30 Apr 26.docx
- Worth checking: No funding committed. No award is guaranteed, and you bear your own white paper and proposal costs. From BAA-RQR-2019-0001_SPRINT_BAA Amendment 10 30 Apr 26.docx
Show all 7Show fewer
- Worth checking: Government wants broad data rights. The Air Force expects unlimited rights in technical data and software developed at its expense, which can be a problem for firms with proprietary technology. From BAA-RQR-2019-0001_SPRINT_BAA Amendment 10 30 Apr 26.docx
- Worth checking: Cost-reimbursement contracting. Cost-plus awards need an accounting system the government considers adequate, and a pre-award survey may be required for firms without one. From BAA-RQR-2019-0001_SPRINT_BAA Amendment 10 30 Apr 26.docx
- Minor: Submissions shared with outside advisors. Your proposal data may be released to four named support contractors unless you opt out before submitting. From BAA-RQR-2019-0001_SPRINT_BAA Amendment 10 30 Apr 26.docx
- Minor: Unclear due date. The SAM.gov notice shows a January 23, 2027 deadline, but the BAA says white papers can be sent any time in its 20-year open period, so confirm with the contracting officer. From BAA-RQR-2019-0001_SPRINT_BAA Amendment 10 30 Apr 26.docx
Read from the notice and 3 attachments. Show which files.
- BAA-RQR-2019-0001_SPRINT_BAA Amendment 10 30 Apr 26.docx (read)
- BAA-RQR-2019-0001 Title Page.pdf (read)
- BAA-RQR-2019-0001_Attachment_1_SPRINT_QA_4-8-2019.pdf (read)
Full summary
What they want
- Chemical monopropellant thrusters, components and complete propulsion systems
- Chemical bipropellant thrusters, components and complete propulsion systems
- Electric propulsion thrusters, components and complete systems
- Multi-mode thrusters, components and complete systems
- Plume phenomenology studies (experiments and/or modeling and simulation)
- Mission utility of propulsion research concepts and related operating concepts or architectures
- Work can range from studies and modeling to ground or space experiments and maturing specific technologies
- Contract type
- Open BAA; awards are anticipated to generally be cost-plus-fixed-fee (cost reimbursement), but the Air Force may use any appropriate FAR contract type
- Period of performance
- Each award is anticipated to be 3 to 60 months, tailored to each award; the BAA itself is open for 20 years
- Place of performance
- USA (varies by award; the issuing office and technical lead are at Edwards AFB, CA)
- Estimated value
- Individual awards are anticipated at $100K to $50M per contract; no ceiling on the program and maximum award value of $50M or less
- How they'll choose
- White papers are screened on three yes/no style questions. Full proposals are later judged on criteria set in each call or letter request for proposal, which will include at least technical and price/cost criteria. Proposals are then rated Highly Recommended, Selectable or Not Selectable.
- Offers due
- White papers may be sent anytime during the 20-year open period; the SAM.gov notice shows a response deadline of Jan 23, 2027 2:00 PM Pacific. Calls issued under the BAA set their own proposal due dates.
- How to submit
- Email white papers (PDF) to AFTC.SPRINT.BAA@us.af.mil and CC the contracting officer, Alessandra Barzaghi-Martin
- Page limits
- White paper limited to 5 pages (including the title page), PDF, 12-point font, double-spaced, 8.5x11 with 1-inch margins
What they'll judge offers on
- White paper: is the technical approach consistent with the technologies listed in the Statement of Needs?
- White paper: is the research of interest to the Government?
- White paper: is appropriate funding available?
- Proposals (per call or letter RFP): technical and cost/price criteria at a minimum, possibly management and past performance
What to include when you submit
- White paper sections: A title page (program title, company, CAGE, SAM UEI, contracting and technical contacts), B period of performance and task objectives, C technical summary and proposed deliverables, D cost of task / rough order of magnitude (ROM)
- Give only a time-phased bottom-line ROM cost; no detailed cost support in the white paper
- Optional title page template is provided as an attachment
- If the Air Force is interested you receive a letter RFP asking for a full technical and cost proposal that includes a non-proprietary statement of work
- Proposals should state they are valid at least 180 days; otherwise 360 days is assumed
- Include data rights assertions if you propose anything less than unlimited or government purpose rights
- Never send classified or ITAR-restricted material to the white paper email; contact the contracting officer for handling instructions first
- Proposals must reference the BAA number and follow RFO 52.215-1
Not in the notice text
- Specific calls, topics, dollar amounts and due dates under this BAA are not yet issued; they will be announced separately
- Number of awards and anticipated award dates
- Whether a given call will require a security clearance or facility clearance
- Reason the SAM.gov response deadline is Jan 23, 2027 when the BAA accepts white papers all year
More to check before you bid
- The AI summary also reads the notice as naming requirements:
- The AI summary's reading of the notice and its attachments says a bidder needs: DD 2345 export approval. The summary's list is under Who can bid; check it in the notice before you bid.
Notice details
Notice type, codes, versions and files
- Posted
- Dec 10, 2020
- Notice type
- Presolicitation
- Office
- FA9300 AFTC PZR, Edwards AFB, CA
- Product/service code
- AD22 · R&D – Defense Other: Services (Applied Research/Exploratory Development)
- Business type
- Engineering, architecture & research (FedReady's grouping, from NAICS 541715)
- Versions
11 versions have been posted, newest first.
- Apr 30, 2026 · AmendmentDue Jan 23, 2027
- Apr 30, 2026 · AmendmentDue Jan 23, 2027
- Jan 27, 2026 · AmendmentDue Jan 23, 2027 (changed)
- Aug 26, 2024 · AmendmentDate Jan 23, 2026
- Feb 8, 2024 · AmendmentDate Jan 23, 2026
- Jan 16, 2024 · AmendmentDate Jan 23, 2026
- Jan 24, 2023 · AmendmentDate Jan 23, 2026
- Apr 13, 2022 · AmendmentDate Jan 23, 2026 (changed)
- Dec 10, 2020 · Amendment 0010 (this version)Date Jan 23, 2024
- Sep 3, 2020 · AmendmentNo date on SAM.gov
- Sep 3, 2020 · PresolicitationNo date on SAM.gov
- Attachments
Before you respond
Terms on this notice: Solicitation
Latest amendment note (Amendment 10) from SAM.gov
Similar open opportunities
- Space Power and Reactor Capabilities (SPARC) - Final Request for Proposals (RFP)NASA Glenn Research Center plans several multiple-award indefinite delivery, indefinite quantity (IDIQ: a contract that sets a ceiling and orders work later through task orders)…
- Strategic Technology Office-wide Innovation Solutions Opening AnnouncementDARPA-PS-26-09 is a two-step research call: anyone may send a short abstract on a rolling basis, but full proposals are accepted only from firms DARPA invites after an abstract…
- SDA Proliferated Warfighter Space Architecture (PWSA) - Systems, Technologies, and Emerging Capabilities (STEC) Broad Agency Announcement (BAA)The Space Development Agency (SDA) is asking companies, universities and labs for new ideas, studies, designs and prototypes that could improve its Proliferated Warfighter Space…
- ManTech special Broad Agency Announcement (sBAA): Accelerating Maritime Modernization: Innovation in Naval Manufacturing, Sustainment, and Industrial Base CapabilityThe Office of Naval Research (Navy ManTech program) is asking for research and development ideas that speed up shipbuilding, repair and the industrial base behind it.
- Expedited Research Innovation System (ERIS)DARPA, working with its marketplace manager the Applied Research Institute (ARI), runs a long-term open call for breakthrough technology ideas.