Sources Sought
Request for Information for On-Site Fabrication and Assembly of a Three-Bay High-Performance Magazine (HPM) Structure
Department of Defense · Department of the Army
AI summaryThis is a sources sought notice (a request for information, not a solicitation) W912HZ27X1CTB from the Army's Engineer Research and Development Center (ERDC), for its Geotechnical and Structures Laboratory. It asks which firms could build one three-bay reinforced concrete High-Performance Magazine (HPM) test structure on site at Fort Polk, LA, that will later be destroyed in testing. Capability responses are due November 4, 2026, 3:00 PM Central. More in the summary
Market research, not a bid. Replying is free and tells Department of the Army who could do this work. Send a short reply to the contracting contact; no price is needed. See the contact
AI summary Beta
This is a sources sought notice (a request for information, not a solicitation) W912HZ27X1CTB from the Army's Engineer Research and Development Center (ERDC), for its Geotechnical and Structures Laboratory. It asks which firms could build one three-bay reinforced concrete High-Performance Magazine (HPM) test structure on site at Fort Polk, LA, that will later be destroyed in testing. Capability responses are due November 4, 2026, 3:00 PM Central.
Who can bid
- Submissions must come from a U.S.-based contractor, and the draft requirement says the company must be U.S.-owned
- Contractor must be a United States (US) owned company
How to submit: Email to Shinita Jordan at Shinita.M.Jordan@usace.army.mil and Sonia Boyd at Sonia.J.Boyd@usace.army.mil. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (6)
From the version posted Oct 21, 2026.
- Serious: U.S.-owned company required. Foreign-owned firms are not eligible under the draft requirement.
- Serious: Specialized high-strength concrete and rebar work. The job needs 10,000 PSI self-consolidating concrete and continuous unspliced rebar in dense walls; only firms with similar big-project experience will be competitive.
- Worth checking: Information request only, not an offer. No solicitation exists yet. A response does not bid on the work, and not responding does not shut you out of a later request for quotes.
Show all 6Show fewer
- Worth checking: Draft requirement can change. The attached description is a draft; full drawings and specifications come only with a formal solicitation.
- Worth checking: 240-day completion window. All site work must be finished and ready for inspection within 240 days of award, with the whole structure built in the stated sequence.
- Minor: Project experience requested. Responses should show two to four similar completed projects from the last 7 years.
Read from the notice and 1 attachment. Show which files.
- DRAFT DoR_3-Bay HPM_Ft Polk_21OCT2026.pdf (read)
Full summary
What they want
- Build one (1) three-bay, cast-in-place reinforced concrete HPM test structure at Range 19, Fort Polk, LA
- Buy and deliver all materials and equipment; build, brace and remove all formwork (the molds that hold wet concrete)
- Place 10,000 PSI self-consolidating concrete (SCC: concrete that flows into place without vibrating) per approved mix design
- Install continuous, unspliced #8 and #4 rebar (steel reinforcing bars) in congested walls, slabs and roof
- Fill wall cavities with dry structural sand to 100 PCF (pounds per cubic foot)
- Cast three reinforced concrete blast doors per bay and install steel closure plates
- Test concrete on each placement (cylinders, slump flow, T-50, J-Ring) and pass Government inspections at hold points
- Finish all site work and have the structure ready for inspection within 240 days after contract award
- Contract type
- Not stated; sources sought only. The draft requirement calls for firm-fixed pricing for the whole structure
- Period of performance
- Draft: all site activities done and the structure ready for inspection no later than 240 days after contract award
- Place of performance
- Range 19, Mill Creek Road, Fort Polk, Louisiana 71459
- Estimated value
- Not stated
- Offers due
- November 4, 2026, 3:00 PM Central
- How to submit
- Email to Shinita Jordan at Shinita.M.Jordan@usace.army.mil and Sonia Boyd at Sonia.J.Boyd@usace.army.mil
What to include when you submit
- Contact information: company name, address, point of contact, business title, telephone, email, CAGE code, primary NAICS code, business size (large or small, and the small category), current SAM registration, web address
- Capabilities statement covering the required items and capabilities in the RFI and draft requirement, plus experience; contract numbers and customers are recommended
- Business status under NAICS 238120 (8(a), HUBZone, Service-Disabled Veteran-Owned, Small Disadvantaged Business and similar)
- Question 1: give at least two (2) and no more than four (4) projects completed within the last 7 years of similar scale and complexity, with concrete strength, cubic yards placed, rebar density, and your role
- Question 2: describe your experience with high-strength self-consolidating concrete: mix design submittal, managing formwork pressure, on-site quality control testing
- Question 3: say whether you design formwork in-house or subcontract it, and describe a hard formwork job you handled
- Question 4: describe your methods for installing long, heavy, continuous rebar in congested walls and slabs
- Question 5: say which of formwork, rebar, concrete placement, earthwork and site logistics, and materials quality testing you self-perform versus subcontract
- Question 6: say whether you can buy all materials and fully carry out the work, and what you cannot provide
- Send questions in writing to both contacts; verbal questions are not accepted
Not in the notice text
- Whether a site visit is planned is not stated.
- Which wage rule applies (Davis-Bacon wage determination) is not stated; this is a construction NAICS code (238120).
- The set-aside for any later solicitation is not stated; SAM.gov shows none and the RFI asks about business status.
- The Government's estimate or budget is not given.
- When a request for quotes will be released is not stated.
Eligibility and how to respond
- No set-aside. Any business can reply: this is market research, and no bid is being taken yet.
- To respond, send a short reply to the contracting contact near the top of this page. No price is needed.
- Construction contracts over $2,000 pay at least the local Davis-Bacon wage rates, from the wage determination in the solicitation. Price your labor from it: How to price a government contract, and how Davis-Bacon differs from the Service Contract Act.
Notice details
- Posted
- Oct 21, 2026
- Notice type
- Sources Sought
- Office
- W2R2 USA Engr R & D CTR, Vicksburg, MS
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 238120)
- Attachments
Past awards and competition
Who has won work like this before, the likely incumbent, and what similar contracts paid, from USAspending.gov.
Before you respond
Terms on this notice: Sources sought notice
Full notice text from SAM.gov
Similar open opportunities
- WWYK260004 - Repair Structural Integrity, B1134, Post 34 & North WallOnly holders of a Tinker AFB MAC BOA (a basic ordering agreement (BOA): a standing agreement that lets the base place orders) can bid, and the order is set aside for small…