Presolicitation
Design-Bid-Build (DBB) Phase III Groundwater Treatment Plant Construction, Nwirp Bethpage, Wantagh, New York
Department of Defense · Department of the Navy
Response due Dec 3, 2026 · Notice says SDVOSB set-aside · Bethpage, NY
Advance notice of a coming solicitation, not a bid yet. If it asks for capability statements, sending one is free and puts you on Department of the Navy's list before the solicitation is posted. See the contact
AI summary Beta
The Navy (NAVFAC Mid-Atlantic) plans to issue Request for Proposals (RFP) N4008527R0048 for a design-bid-build groundwater treatment plant at the former Naval Weapons Industrial Reserve Plant (NWIRP) Bethpage, Wantagh, New York. It will be open to all businesses (full and open competition), not set aside. SAM.gov lists December 3, 2026, 2:00 PM Eastern as the response date, which is when the RFP is expected.
Who can bid
- Active registration in the System for Award Management (SAM)
- Large businesses must submit a subcontracting plan before award
How to submit: Solicitation documents on PIEE (piee.eb.mil) and SAM.gov, as PDF files. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (5)
From the version posted Nov 13, 2026.
- Serious: SAM.gov and the solicitation disagree on the set-aside. SAM.gov lists no set-aside, but the solicitation the AI read says a set-aside for small businesses. Ask the contracting officer which applies before you bid.
- Serious: Large project open to all sizes of business. Market research found too few small businesses would respond or qualify, so there is no small business set-aside and you would compete with large firms.
- Worth checking: Magnitude of $25,000,000 to $100,000,000. A project this size needs the capacity, and typically bonding, of a large construction firm; bonding is not stated in this notice.
Show all 5Show fewer
- Worth checking: Complex environmental treatment systems. The work includes advanced oxidation, carbon filtration, chemical feed and SCADA controls, so relevant experience will matter.
- Minor: RFP issue date. The RFP is to be issued by NAVFAC Mid-Atlantic CON22 on or about December 3, 2026; the response due date for this notice is also December 3, 2026.
Read from the notice text only.
Full summary
What they want
- Build and commission a new groundwater treatment plant with sand filters, an advanced oxidation process (AOP) and granular activated carbon (GAC) units
- Complete three groundwater recovery wells and the underground piping to bring contaminated water to the plant
- Build two new buildings (treatment plant and office) with structural, electrical, plumbing, HVAC and fire protection work
- Install tanks, filter vessels, pumps, blowers, chemical feed systems, and a PLC and SCADA control system
- Earthwork, site utilities, pavements and fencing
- Contract type
- Construction; source selection with a tradeoff approach (best value)
- Period of performance
- 1,095 calendar days after award
- Place of performance
- NWIRP Bethpage, Wantagh, New York (SAM.gov: Bethpage, NY)
- Estimated value
- Magnitude of construction between $25,000,000 and $100,000,000
- How they'll choose
- Best value tradeoff (FAR 15.103-1): the Government may pay more for a better technical and past performance offer
- Offers due
- Not stated; the RFP is to be issued on or about December 3, 2026
- How to submit
- Solicitation documents on PIEE (piee.eb.mil) and SAM.gov, as PDF files
What they'll judge offers on
- Non-price: technical and past performance
- Price
What to include when you submit
- Be registered in the System for Award Management (SAM)
- Register for the solicitation when downloading it; only registered contractors get email about amendments
- Send both non-price (technical and past performance) and price proposals
- Large businesses must submit a subcontracting plan before award
Current contractor
No incumbent is named. A sources sought notice and SBA Small Business Search were issued on 21 January 2026; the notice does not give how many firms responded, and the Contracting Officer concluded a small business set-aside was not feasible. Anticipated award is March 2027.
Not in the notice text
- The RFP is not yet posted; due dates, evaluation factors and proposal instructions will be in it
- Whether there is a site visit and whether it is required is not stated
- Whether a Davis-Bacon wage determination (the federal minimum pay rule for construction workers) applies is not stated
- Bonding requirements are not stated
More to check before you bid
- The notice names requirements:
- The notice text says this is set aside for service-disabled veteran-owned small businesses (SDVOSBs), but SAM.gov lists no set-aside. Check the notice before you bid.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 13, 2026
- Notice type
- Presolicitation
- Office
- Navfacsyscom Mid-Atlantic, Norfolk, VA
- Product/service code
- Y1NE · Construction of Water Supply Facilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237110)
- Attachments
Before you respond
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP)The Army Corps of Engineers (Louisville District) wants a contractor to demolish and build a wastewater treatment plant (WWTP) at Rough River Lake.
- HAVO 326181 Rehabilitate Rainshed&Water TreatmentThe National Park Service (NPS), Denver Service Center, wants a builder to rehabilitate the rainwater catchment and water treatment system and replace Buildings 43 and 241 at…
- Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant UpgradesSolicitation 6973GH-27-R-00005 is a total small business set-aside: only small businesses can bid.
- USACE SPK DBB Construction - Calaveras Wastewater Treatment Plant Improvements - Copperopolis, CAThe Army Corps of Engineers Sacramento District is asking contractors whether they can build upgrades to the Copper Cove Wastewater Treatment Plant in Copperopolis, CA, for the…
- NGWSP Cutter Lateral Reach 21 Booster PlantBureau of Reclamation (Upper Colorado Region) wants a small business to build the Cutter Lateral Reach 21 booster pump plant, solicitation 140RR027B0004, in San Juan County, New…