Solicitation
HAVO 326181 Rehabilitate Rainshed&Water Treatment
Department of the Interior · National Park Service
AI summary Beta
This summary may miss requirements: 19 of 31 attachments weren't read (B09_Att_(25)_Revised-RFI-102-Response_0004.xlsx, B09_Att_(26)_Supplemental-Technical-Addendum_02_0004.xlsx and 17 more). Check the attachments on SAM.gov.
The National Park Service (NPS), Denver Service Center, wants a builder to rehabilitate the rainwater catchment and water treatment system and replace Buildings 43 and 241 at Hawaii Volcanoes National Park, Volcano, Hawaii (solicitation 140P2026R0091, Amendment 4). No set-aside is used and the stated magnitude of construction is over $25 Million. Proposals are due November 27, 2026, 4:00 PM Hawaii time, and need a bid guarantee.
Who can bid (4)
- Bid guarantee with the proposal: SF 24 bid bond (money-backed promise that you will sign the contract if chosen) or other suitable guarantee From Sol_140P2026R0091.pdf
- Current, active registration in the System for Award Management (SAM) when the offer is submitted From Sol_140P2026R0091.pdf
- Project experience and past performance on similar work (water infrastructure, tank rehabilitation, phased work, National Park or sensitive settings) are scored From Sol_140P2026R0091.pdf
Show all 4Show fewer
- Key Trades and Key Personnel are evaluated for appropriate experience and capability From Sol_140P2026R0091.pdf
How to submit: Electronic copy; the portion of the solicitation that gives the submittal address and method (Section L) was left out of the input. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (7)
From the version posted Nov 20, 2026.
- Serious: Bid guarantee required with the proposal. A small business needs a surety (bonding company) to issue an SF 24 bid bond for a project over $25 Million before it can send a proposal. From Sol_140P2026R0091.pdf
- Serious: Magnitude of construction over $25 Million. A project this large needs substantial bonding capacity, crews and financing, which many small firms lack. From Sol_140P2026R0091.pdf
- Worth checking: Remote Hawaii site with water service that must keep running. The work must keep water production going through phased shutdowns, with shipping to Hawaii, active park operations and resource protection limits. From Sol_140P2026R0091.pdf
Show all 7Show fewer
- Worth checking: Period of performance and delivery dates differ. The line items show performance from November 1, 2026 to July 3, 2028, while the schedule shows delivery on 12/21/2028; ask which governs.
- Worth checking: The site visit was Sep 30, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From Sol_140P2026R0091_Amd_0001.pdf
- Worth checking: Optional line items are priced and evaluated with the base. Failing to price every optional line item may make the proposal unacceptable. From Sol_140P2026R0091.pdf
- Minor: Response due date extended three times. Amendment 0004 sets the due date at November 27, 2026; earlier amendments moved it from October 23, 2026 to November 6, then November 20. From Sol_140P2026R0091_Amd_0004.pdf
Read from the notice and 12 attachments. 19 of 31 not read. Show which files.
- Sol_140P2026R0091_Amd_0004.pdf (read)
- Sol_140P2026R0091_Amd_0003.pdf (read)
- Sol_140P2026R0091_Amd_0002.pdf (read)
- Sol_140P2026R0091_Amd_0001.pdf (read)
- Sol_140P2026R0091.pdf (read)
- B08_Att_(1)_HAVO_326181_26-0908_Project_Specifications.pdf (read)
- B09_Att_(17)_A-E-Technical-Addendum_0003.pdf (read)
- B09_Att_(16)_Pre-Proposal_RFI_Responses_0003.pdf (read)
- B09_Att_(18)_Spec-09-65-00_Resilient-Base_0003.pdf (read)
- B09_Att_(19)_Spec-09-67-23_Resinous-Flooring_0003.pdf (read)
- B09_Att_(15)_HAVO_326181_-_Site_Walk_Requirements_30JUL2026_0001.pdf (read)
- B08_Att_(8)_HAVO_326181_Construction_Phasing_Memo.pdf (read)
- B09_Att_(25)_Revised-RFI-102-Response_0004.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- B09_Att_(26)_Supplemental-Technical-Addendum_02_0004.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- B09_Att_(24)_REFERENCE_PrePropSiteVisitSignInSheet_0003.pdf: not summarized: open it on SAM.gov
- B08_Att_(13)_HAVO_326181_Final_CD_Basis_of_Design_Product_Files.pdf: not read (it couldn't be opened): open it on SAM.gov
- B08_Att_(7)_HAVO_326181_Construction_Phasing_Calcs.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- B08_Att_(9)_Redwood_Water_Tanks_Trip_Rpt_and_Prelim_Treat_Recs__2018.pdf: not summarized: open it on SAM.gov
- B08_Att_(11)_Solit_PSP_Vol_II_SubKPlan.docx: not summarized: open it on SAM.gov
- B08_Att_(12)_GenRefs.docx: not summarized: open it on SAM.gov
- B09_Att_(20)_REFERENCE_ElectricalAsBuiltDrawings_0003.pdf: not summarized: open it on SAM.gov
- B09_Att_(21)_REFERENCE_Redwood-Water-Tank-Drawing_0003.pdf: not summarized: open it on SAM.gov
- B09_Att_(22)_REFERENCE_RedwoodTanks2018TripReport_0003.pdf: not summarized: open it on SAM.gov
- B09_Att_(23)_REFERENCE_2024TankInspectionReports_0003.pdf: not summarized: open it on SAM.gov
- B08_Att_(2)_HAVO_326181_26_0908_Final_CD_Drawing_Set.pdf: not summarized: open it on SAM.gov
- B08_Att_(3)_2024_08_26_-_Geotechnical_Data_Report_-_HAVO_Rainsheds_Shear_Wave_Velocity_Survey.pdf: not summarized: open it on SAM.gov
- B08_Att_(5)_HAER_Drawings_HAVO_Rainshed.pdf: not summarized: open it on SAM.gov
- B08_Att_(4)_2025_01_02_-_Geotechnical_Report_HAVO_Rehabilitate_Water_Treatment_System.pdf: not summarized: open it on SAM.gov
- B08_Att_(6)_HAER_HAVO_Water_Collection_System_HI-76__Final_report.pdf: not summarized: open it on SAM.gov
- B08_Att_(14)_Hazardous_Material_Survey_HAVO_Rainshed_Enviroquest_May2025.pdf: not summarized: open it on SAM.gov
- B08_Att_(10)_Davis-Bacon_Act_WD__HI20260001.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Rehabilitate the park's rainwater catchment system: ground catchment, collection pipes, filtration, storage tanks and equipment
- Replace site pavement affected by the work and replace the perimeter security fence
- Demolish and replace Building 43 with a new pre-engineered metal building
- Demolish and replace Building 241 with an open-air steel-column structure, remove two smaller accessory buildings, and build a new one-story concrete block (CMU) building
- CLIN 4: Buildings 43 and 241 Section 106 (historic preservation review) mitigation
- Optional line items (CLINs, priced separately): A replace Building 241 SAR, B repair and improve the water treatment system, C replace the perimeter fence, D replace ground catchment pavement
- Keep water system production running during the work, with phased construction and utility shutdowns and tie-ins
- Protect park resources, including archeological and endangered bird protections in the specifications
- Contract type
- Firm-fixed-price (one set price, whatever the work costs) construction contract with four base line items and four optional line items; best value tradeoff negotiated procurement (RFP)
- Period of performance
- Line items show November 1, 2026 to July 3, 2028; the schedule also shows delivery on 12/21/2028
- Place of performance
- Hawaii Volcanoes National Park, Rainshed in Kīlauea Headquarters Area, Volcano, Hawaii
- Estimated value
- Magnitude of construction: over $25 Million (as stated in the solicitation, not a price estimate)
- How they'll choose
- Best value tradeoff under FAR Part 15 (the Government may pay more for a stronger proposal); non-price factors combined are approximately equal in importance to price; award may be made without discussions
- Offers due
- November 27, 2026, 4:00 PM Hawaii time (9:00 PM Eastern)
- How to submit
- Electronic copy; the portion of the solicitation that gives the submittal address and method (Section L) was left out of the input
What they'll judge offers on
- Factor 1 Technical and Management: Subfactor 1 Project Experience, Subfactor 2 Technical Approach, Subfactor 3 Management Approach, Subfactor 4 Construction Schedule (in descending order of importance)
- Factor 2 Past Performance
- Price: reasonableness and balance across line items, with all optional line items added to the base price
What to include when you submit
- Send one electronic copy only; no hard copies
- Volume I (non-price): Technical and Management proposal covering project experience, technical approach, management approach and construction schedule, plus past performance
- Volume II (business and price): SF 1442 blocks 14 through 20C signed by someone who can bind the company
- Acknowledge every amendment, using one of the methods in block 11 of Standard Form 30
- Section B price schedule with a separate Schedule of Values for each line item, pricing the base and all optional line items
- Bid guarantee: SF 24 bid bond or another suitable guarantee allowed under FAR 52.228-1
- Section K representations and certifications fill-ins, with a current, active SAM.gov registration
- General References form, used to check responsibility
- Past performance: if you have none, send a statement explaining why; disclose any less-than-satisfactory project with the facts and fixes
- Large businesses must also submit a small business subcontracting plan; small businesses do not
After award, you must have
- Performance and payment bonds clause (FAR 52.228-15) is part of the contract; the bond amount and due date are in parts of the solicitation left out of the input From Sol_140P2026R0091.pdf:
52.228-15 PERFORMANCE AND PAYMENT BONDS-CONSTRUCTION (DEVIATION MAY 2023)
Not in the notice text
- Parts of the solicitation (about 162,615 characters, including Section H special requirements, the bond and key personnel terms, the site visit instruction and the start of Section L) and most of the project specifications were left out of the input; check the full documents on SAM.gov
- Whether the September 30, 2026 site visit was required is not shown in the text read
- Whether a Davis-Bacon wage determination applies is not shown in the text read (this is construction, NAICS 237110)
- How and where to submit the proposal (Section L), and the question deadline, are in the part left out
- Performance and payment bond amounts and when they are due after award are in the part left out
- The Technical and Management volume's page limits and format rules are not shown in the text read
- The SF 1442 bond question and the performance days in blocks 11 and 12 could not be read; check the form on SAM.gov
- The clause list includes the HUBZone small business price evaluation preference notice while the form says no set-aside is used; the text read does not explain how it applies
Notice details
Notice type, codes, versions and files
- Posted
- Nov 20, 2026
- Notice type
- Solicitation
- Office
- DSC Contracting Services Division, Denver, CO
- Product/service code
- Y1NE · Construction of Water Supply Facilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237110)
- Versions
5 versions have been posted, newest first.
- Nov 20, 2026 · Amendment 0004 (this version)Due Nov 27, 2026 (changed)
- Nov 5, 2026 · Amendment 0003Due Nov 20, 2026 (changed)
- Oct 13, 2026 · Amendment 0002Due Nov 6, 2026 (changed)
- Sep 28, 2026 · Amendment 0001Due Oct 23, 2026
- Sep 18, 2026 · SolicitationDue Oct 23, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Latest amendment note (Amendment 4) from SAM.gov
Similar open opportunities
- Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant UpgradesSolicitation 6973GH-27-R-00005 is a total small business set-aside: only small businesses can bid.
- Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP)The Army Corps of Engineers (Louisville District) wants a contractor to demolish and build a wastewater treatment plant (WWTP) at Rough River Lake.
- Design-Bid-Build (DBB) Phase III Groundwater Treatment Plant Construction, Nwirp Bethpage, Wantagh, New YorkThe Navy (NAVFAC Mid-Atlantic) plans to issue Request for Proposals (RFP) N4008527R0048 for a design-bid-build groundwater treatment plant at the former Naval Weapons Industrial…
- 550-26-121 FY27 NRM Emergent Repairs North Water Tower 71 & South Water Tower 94 CONThe Department of Veterans Affairs (VA) wants emergent repairs to the North Water Tower 71 and South Water Tower 94 in Danville, Illinois.
- White Horse Hill National Game Preserve Water MainOnly small businesses can bid. The Fish and Wildlife Service (Department of the Interior) wants a contractor to extend a water main at White Horse Hill National Game Preserve in…