The notice looks incomplete: The input itself left out part of the solicitation (about 123,000 characters, mostly clauses and provisions) and part of the SOW (about 96,000 characters, specification sections 013233 to 313215); check the full files on SAM.gov. Check the attachments on SAM.gov.
Only small businesses can bid. The Fish and Wildlife Service (Department of the Interior) wants a contractor to extend a water main at White Horse Hill National Game Preserve in St. Michael, North Dakota, solicitation 140FGA26R0044. It is firm-fixed-price (FFP: one set price, whatever the work ends up costing), with work from May 15, 2027 to August 15, 2027. The response due date is December 9, 2026, 2:00 PM Eastern, by email.
Who can bid (5)
- Small business set-aside: only small businesses can bid (NAICS 237110) From Sol_140FGA26R0044.pdf
- A bid bond (guarantee) must come with the offer From Notice_to_Offerors.pdf
- Registered in SAM.gov with online representations and certifications done before the response due date From Notice_to_Offerors.pdf
Show all 5Show fewer
- A drilling supervisor on site for all horizontal directional drilling who has supervised directional drilling of similar materials and subsurface conditions; drill operators trained on the specific equipment From SOW.pdf
- Three completed projects within the project magnitude, of similar nature and complexity (including water main extension work), federal or state, to be rated technically acceptable From Sol_140FGA26R0044.pdf
How to submit: Email to the contracting officer, Samantha LaGue (address in the solicitation). What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (11)
From the version posted Nov 20, 2026.
- Serious: Small business set-aside. Only small businesses can bid; a firm that is not small under NAICS 237110 cannot be considered. From Sol_140FGA26R0044.pdf
- Serious: Bid bond with the offer, then payment and performance bonds. A bid bond must come with the offer, and both payment and performance bonds are due within 10 calendar days of award. A firm that cannot get bonded cannot bid. From Notice_to_Offerors.pdf
- Serious: Three completed similar projects needed to be acceptable. The technical rating is only acceptable or unacceptable, and acceptable needs three completed projects of similar size, nature and complexity, including water main extension. Firms without them are rated unacceptable. From Sol_140FGA26R0044.pdf
Show all 11Show fewer
- Worth checking: Both pricing documents required. An offer with only the Price Schedule or only the breakdown by divisions and subdivisions is called incomplete. Every line item must be priced. From Sol_140FGA26R0044.pdf
- Worth checking: A pipe-size question is still open. The posted answer to question 2 asks contractors whether the 800 to 1,000 foot bore limit applies to both pipe types, and says another amendment will follow. Pipe size under the lake could change. From Questions_and_Answers_Amendment_1_0001.pdf
- Worth checking: Davis-Bacon wage rates apply. Workers must be paid at least the listed federal wage rates (wage decision ND20260046, Benson County, heavy construction), and certified payrolls go with each invoice. From Notice_to_Offerors.pdf
- Worth checking: Named brands and a single pipe manufacturer. The specifications call for pipe equal to JM Eagle and Hersey TruRead remote meter readouts, and all pipe of similar type must come from one manufacturer. Price these before bidding. From SOW.pdf
- Minor: Work hours differ between the solicitation and the specifications. Section H gives normal work hours of 7:30am to 5:00pm, Monday through Friday, while the specifications say 7:00 a.m. to 5:00 p.m. Weekend work needs approval and no work happens on federal holidays. Ask the contracting officer which governs. From Sol_140FGA26R0044.pdf
- Minor: Contractor posts crossing bonds and extra insurance if the crossed authority requires. For road, railroad or utility crossings, the contractor must post any bonds or deposits and get any extra insurance the governing authority requires; the amounts are not given. From SOW.pdf
- Minor: Payment for boring held until the drilling log is submitted. A typed drilling log book must go to the project engineer, and boring is not paid until it is in. From SOW.pdf
- Minor: The site visit was Nov 12, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From Sol_140FGA26R0044.pdf
Read from the notice and 8 attachments. Show which files.
- Sol_140FGA26R0044_Amd_0001.pdf (read)
- Sol_140FGA26R0044.pdf (read)
- SOW.pdf (read)
- Notice_to_Offerors.pdf (read)
- Price_Schedule.pdf (read)
- Questions_and_Answers_Amendment_1_0001.pdf (read)
- Drawings.pdf (read)
- DOL_Wage_Determination.pdf (read)
Full summary
What they want
- Install a new water main extension (PVC pipe) connected to the preserve's existing water distribution system
- Horizontal drilling for pipe runs, including about 1,375 LF of HDPE pipe under the lake and 250 LF under the gate
- Underground utility crossing, including 3-inch pipe inside a steel casing for 50 LF
- Water meter and concrete valve vault, air/vacuum release valves, gate valve and box
- Carry out the work to the drawings and specifications (about 78 pages of specifications, 8 pages of drawings)
- Provide a written work progress plan at the pre-work conference, and a construction schedule, daily reports and progress photos
- Test the pipe (leakage and hydrostatic pressure tests), disinfect it, and provide as-built drawings and a drilling log
- Get the permits and pay the fees, including the storm water discharge permit
- Send certified payrolls with each invoice through the Treasury's Invoice Processing Platform (IPP)
- Contract type
- Firm-fixed-price (FFP)
- Period of performance
- May 15, 2027 to August 15, 2027 (Amendment 0001 changed it from January 4, 2027 to April 4, 2027). The solicitation also says to start within 10 calendar days of notice to proceed and finish within 60 days of it.
- Place of performance
- White Horse Hill National Game Preserve, 2107 Park Drive, St. Michael, ND 58370 (Benson County)
- Estimated value
- Project magnitude: $250,000 and $500,000 (Notice to Offerors)
- How they'll choose
- Lowest-price technically acceptable (LPTA): the lowest-priced offer that is technically acceptable wins. Price is ranked first, then the lowest price is checked for technical acceptability, then the firm's responsibility is checked.
- Offers due
- December 9, 2026, 2:00 PM Eastern (Amendment 0001 writes 2:00 PM EST)
- How to submit
- Email to the contracting officer, Samantha LaGue (address in the solicitation)
What they'll judge offers on
- Price: lump-sum Price Schedule plus a pricing breakdown by divisions and subdivisions
- Past Performance / Technical Qualifications: no more than three recent, relevant federal or state projects within the project magnitude, of similar nature and complexity, including water main extension work
- Vendor Responsibility: checked in FAPIIS/CPARS and SAM records
What to include when you submit
- Send a filled-out Standard Form 1442 (SF 1442), the solicitation, offer and award form (blocks 14 through 20C)
- Send signed amendment forms (SF 30) or an acknowledgment of every amendment, including Amendment 0001
- Complete the Price Schedule with lump-sum values, and also send your pricing broken down by divisions and subdivisions; missing either makes the offer incomplete
- Send no more than three recent, relevant past projects, within the project magnitude and of similar nature and complexity, federal or state
- Send representations and certifications under FAR 52.204-8 and 52.219-1, or state that they are already in SAM.gov
- Send the bid guarantee (bid bond) with the offer
- Offers must stay valid for 60 days
- Put the solicitation number in the email subject line
After award, you must have
- Payment and performance bonds, due no later than 10 calendar days after award From Notice_to_Offerors.pdf:
…both payment and performance bonds will be required.
Not in the notice text
- The input itself left out part of the solicitation (about 123,000 characters, mostly clauses and provisions) and part of the SOW (about 96,000 characters, specification sections 013233 to 313215); check the full files on SAM.gov.
- The specifications contain template leftovers (for example '(insert state)' in the storm water permit paragraph, bid schedule unit prices, and two spare insulated covers for Spirit Lake Water Resource Management), so some may not apply to this project; ask the contracting officer.
- The amount of the bid guarantee (bid bond) is not stated in the text read.
- The answer to the engineering team's counter-question about pipe size and bore length is to come in another amendment.
- Whether another site visit will be scheduled is not stated; Amendment 0001 only invites firms that missed the visit to email the contracting officer.
- The place of performance field on SAM.gov is blank; the address comes from the attachments.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 20, 2026
- Notice type
- Solicitation
- Office
- FWS Contracting Activity, Falls Church, VA
- Product/service code
- Y1NE · Construction of Water Supply Facilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237110)
- Versions
3 versions have been posted, newest first.
- Nov 20, 2026 · Amendment 0001 (this version)Due Dec 9, 2026 (changed)
- Nov 3, 2026 · SolicitationDue Dec 3, 2026
- Oct 19, 2026 · PresolicitationDate Dec 3, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant UpgradesSolicitation 6973GH-27-R-00005 is a total small business set-aside: only small businesses can bid.
- HAVO 326181 Rehabilitate Rainshed&Water TreatmentThe National Park Service (NPS), Denver Service Center, wants a builder to rehabilitate the rainwater catchment and water treatment system and replace Buildings 43 and 241 at…
- 550-26-121 FY27 NRM Emergent Repairs North Water Tower 71 & South Water Tower 94 CONThe Department of Veterans Affairs (VA) wants emergent repairs to the North Water Tower 71 and South Water Tower 94 in Danville, Illinois.