Solicitation
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
Department of Energy · Sol. RFP-376508-CD
Due in 44 days
AI summary Beta
No AI summary for this notice yet.
Save it to generate your own AI brief in its bid workspace: a plain-English summary, the red flags, and how well your business fits.
Is this a fit for your business?
Create a free accountFedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Response due
- Nov 17, 2026, 10:00 PM UTC
- Posted
- Sep 17, 2026
- Notice type
- Solicitation
- Solicitation
- RFP-376508-CD
- Agency
- Department of Energy
- Office
- Fermilab - DOE Contractor
- Set-aside
- No Set aside used
- NAICS
- 236210
- Product/service code
- Z2EZ
- Business type
- Construction & renovation
- Place of performance
- Batavia, IL, 60510
- Contracting contact
- Chris Daleycdaley@fnal.gov6308404256
Full notice text from SAM.gov
This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.
Similar open opportunities
- Tinker AFB 2026 Multiple Award Construction Contract (MACC)
- Building 215 Clean Room HEPA Filter Replacement
- Construction Contract Sources Sought
- 635-21-139 | Repair Parking Garage 1 Deficiencies | CON (VA-26-00041470) (NRM - SCIP# VHA19-635-2023-52398)The VA (Network Contract Office 19) needs an SDVOSB contractor to repair deficiencies in Parking Garage 1 at the Oklahoma City VA Medical Center, including striping, an ADA…
- Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)The U.S. Army Corps of Engineers, Kansas City District, wants a contractor to design and build access manholes to an existing seepage collection system in the Fairfax-Jersey…