Fermi Forward Discovery Group, LLC (FFDG), the company that runs Fermilab for the Department of Energy, wants a general contractor to build an addition to the Central Utility Building (CUB) and renovate it, in Batavia, IL (solicitation RFP-376508-CD). The response due date is December 17, 2026, 4:00 PM Central (5:00 PM Eastern). No set-aside is used, a bid guarantee and 100 percent payment and performance bonds are part of the terms, and Davis-Bacon wages apply. In-person site visits are offered but not stated to be required.
Who can bid (4)
- Bid guarantee (bid bond) with the offer; FFDG may collect on it if the winner does not sign or post the required bonds From 1.0 RFP 376508-CD Instructions to Offerors.pdf
- Firm's current registration or license numbers in Illinois and how long the firm has worked in Illinois From 1.0 RFP 376508-CD Instructions to Offerors.pdf
- Key personnel (program executive, superintendent, project manager, safety officer, estimator) shown with resumes From 1.0 RFP 376508-CD Instructions to Offerors.pdf
Show all 4Show fewer
- Experience on similar projects, particularly projects valued at $50 million or more From 1.0 RFP 376508-CD Instructions to Offerors.pdf
Things to watch (11)
From the version posted Nov 19, 2026.
- Serious: Bid guarantee plus 100 percent payment and performance bonds. A bid bond comes with the offer, and the winner posts two bonds each equal to the full contract price, so a small business needs strong surety (bonding company) support. From 1.0 RFP 376508-CD Instructions to Offerors.pdf
- Serious: Large, complex utility project. The scoring asks for experience on projects of $50 million or more and for 18 months of workload and bonding capacity, which favors large builders. From 1.0 RFP 376508-CD Instructions to Offerors.pdf
- Worth checking: Work must fit Fermilab's accelerator shutdown window. Construction can start only on January 3, 2028, and the shutdown dates may change, so the schedule can move. From 1.0 RFP 376508-CD Instructions to Offerors.pdf
Show all 11Show fewer
- Worth checking: Live facility: 7-day maximum outages. The contractor must keep a base level of utility services running during the work, which adds planning and temporary power cost. From Amend 03 to RFP 376508-CD.pdf
- Worth checking: Hidden existing conditions priced in the base bid. Amendments tell bidders to field-verify existing cables and conduits and to price removal and replacement of unsuitable conduit in the base bid, with no change order. From Amend 04 to RFP 376508-CD.pdf
- Worth checking: Davis-Bacon wages and weekly certified payroll. Federal wage rates apply (General Decision IL202600008 is listed as Exhibit Q, attached but not read), and all tiers must file payroll weekly. From 1.0 RFP 376508-CD Instructions to Offerors.pdf
- Worth checking: Heavy proposal package, award without discussion. The proposal needs resumes, schedules, a safety plan and workload data, and FFDG may award without talking to bidders, so submit the best offer first. From 1.0 RFP 376508-CD Instructions to Offerors.pdf
- Worth checking: Site visits on December 2 and 3, 2026. Attendance is not stated to be required. Visits are limited to ten visitors each, first come first served, and access approval depends on citizenship status. From Amend 04 to RFP 376508-CD.pdf
- Worth checking: Completion date differs between documents. The Instructions to Offerors set final completion for September 28, 2029, while Exhibit A says October 1, 2029. From Exhibit A - Scope of Work UIP SP-1 CUB.pdf
- Minor: Site access request form due before each visit. Everyone attending a site visit must file an access request in advance, and non-U.S. citizens' requests get extra review. From Amend 02 to RFP 376508-CD.pdf
- Minor: Buy American rules for construction materials. Foreign materials need an approved exception or an alternate offer, and a request based on cost can add a price penalty in evaluation. From 1.0 RFP 376508-CD Instructions to Offerors.pdf
Read from the notice and 12 attachments. 15 of 27 not read. Show which files.
- Amend 04 to RFP 376508-CD.pdf (read)
- Amend 03 to RFP 376508-CD.pdf (read)
- Amend 02 to RFP 376508-CD.pdf (read)
- Amend 01 to RFP 376508-CD.pdf (read)
- 1.0 RFP 376508-CD Instructions to Offerors.pdf (read)
- Amend 03 CUB Electrical Upgrade As-Builts.pdf (read)
- Exhibit A - Scope of Work UIP SP-1 CUB.pdf (read)
- Exhibit E- Electrical (LV) Calculations.pdf (read)
- Exhibit F- Army Corp NPR-Letter.pdf (read)
- Exhibit G- FFDG General Terms and Conditions for Construction (08.2025).pdf (read)
- Exhibit H - Construction Insurance Requirements.pdf (read)
- Exhibit I - Statement of Acknowledgment (SF-1413).pdf (read)
- Amend 03 Transformer Pics.zip: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Exhibit C- Specification Set- New CHW Plant and CUB Upgrades.pdf: not read (it couldn't be opened): open it on SAM.gov
- Exhibit J - Fermilab Subcontractor Safety Information Questionnaire.pdf: not summarized: open it on SAM.gov
- Exhibit L- Subcontractor Annual RepsCerts-SARC. Rev 8.pdf: not summarized: open it on SAM.gov
- Exhibit N- Bond Bid FL-41.pdf: not summarized: open it on SAM.gov
- Exhibit P- Performance Bond_FL-40.pdf: not summarized: open it on SAM.gov
- Exhibit S- Sample Firm-Fixed-Price Subcontract.pdf: not summarized: open it on SAM.gov
- Amend 03 CUB Original As-Built Drawings.pdf: not summarized: open it on SAM.gov
- Amend 03 Submittal for DHP-CU-1.pdf: not summarized: open it on SAM.gov
- Exhibit B- Construction Drawing Set.pdf: not summarized: open it on SAM.gov
- Exhibit D- Geotechnical Engineering Report.pdf: not summarized: open it on SAM.gov
- Exhibit K- Price Proposal Form.pdf: not summarized: open it on SAM.gov
- Exhibit M- Proposal Cerftifications Form PUR-466_r5_10.14.25.pdf: not summarized: open it on SAM.gov
- Exhibit O- FL-42 (Rev 1.25) - Payment Bond.pdf: not summarized: open it on SAM.gov
- Exhibit Q- Davis Bacon Wage Rate.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Build a new addition to the Central Utility Building: foundation, structure and facade, for new chillers and more chilled-water capacity
- Renovate the existing building: demolition of old piping, equipment, conduit and ductwork, plus the exterior shell and the roof under the cooling towers
- Install medium-voltage (higher-voltage) power: new switches and transformers, plus low-voltage power, fire protection and fire alarm systems
- Improve the heating hot water systems that feed the campus, and do civil utility upgrades and pavement removal
- Keep utility services running during the work: the specification sets a 7-day maximum outage with a base level of service kept up
- Hit five milestones, from notice to proceed through December 30, 2027, to completion on September 28, 2029
- Work inside Fermilab's accelerator shutdown window, anticipated January 1, 2028 to January 1, 2030, which may change
- Contract type
- Firm-fixed-price subcontract (FFDG, a DOE contractor, is the buyer)
- Period of performance
- Notice to proceed through December 30, 2027 for submittals and shop drawings; construction may begin January 3, 2028; final completion September 28, 2029 (Exhibit A says by October 1, 2029)
- Place of performance
- Central Utility Building, Fermilab, Batavia, IL, USA
- Estimated value
- Not stated
- How they'll choose
- Best value tradeoff: the lowest price may not win; all factors other than price together matter significantly more than price. Part I Technical Proposal is worth 70 points.
- Offers due
- December 17, 2026, 4:00 PM Central (5:00 PM Eastern)
What they'll judge offers on
- Technical Proposal (70 points): Criteria 2 and 3 are equally important and both matter more than Criterion 1
- Criterion 2, Approach/Safety Compliance/Work Plan (25 points): project approach, cost savings ideas, phasing of chillers, medium-voltage transformers and switches and the new electrical room, scheduling and quality methods, sample and conceptual schedules, subcontractor plan, project-specific safety and quality execution plan
- Criterion 1, Organizational Structure and Key Personnel (20 points): firm details and Illinois registration numbers, experience for government agencies, organization chart and resumes of key personnel, joint venture details, 18-month workload and bonding picture
- Criterion 3 and the Part II Business Management and Price Proposal details were not in the text read
What to include when you submit
- Send the proposal in two separate parts: Part I Technical Proposal and Part II Business Management and Price Proposal. Do not bind them together; the Technical Proposal must not mention cost except in the past performance section
- Include a bid guarantee with the offer, using Exhibit N (Bid Bond, attached but not read)
- Acknowledge each amendment (now Amendments 01 to 04) by email to the Procurement Specialist, by signing and returning it, or in your proposal letter; failure to acknowledge may disqualify the proposal
- Use Revised Exhibit G (General Terms and Conditions, 10/2026), Revised Exhibit L (Subcontractor Annual Representations and Certifications) and Revised Exhibit M (Proposal Certifications) issued with Amendment 04, not the earlier versions
- Provide an organization chart with Program Executive, Superintendent(s), Project Manager(s), Safety Officer and Estimator, with a resume for each key person; keep key personnel unless FFDG approves a change in writing
- Provide your own and your major subcontractors' workloads, active bonding drawdowns and expected backlog changes for the next 18 months
- Attach a sample schedule and a one-page conceptual level schedule that covers every category on the Measurement and Payment Schedule
- Provide a project-specific safety, health and quality control execution plan with a risk matrix, without corporate safety handbooks
- Describe past projects, particularly any valued at $50 million or more, and experience with other government agencies, especially Illinois or other DOE national laboratories
- If you plan a joint venture, show it on the organization chart and include letters of interest, principals, key personnel resumes and proof of required licenses
- To ask for a Buy American determination, send the request to the Procurement Specialist before you submit; an alternate offer needs a separate Standard Form 1442 and a price comparison table
- Send questions in writing to Chris Daley, cdaley@fnal.gov, (630) 840-4256
After award, you must have
- Payment bond for 100 percent of the contract price within 10 calendar days after the subcontract takes effect From 1.0 RFP 376508-CD Instructions to Offerors.pdf:
Bond in the amount of 100 percent of the original subcontract price within (10) calendar days after the…
- Performance bond for 100 percent of the contract price From 1.0 RFP 376508-CD Instructions to Offerors.pdf:
Performance Bond in the amount of 100 percent of the original subcontract price using Exhibit P,…
- Certificates of insurance, with FFDG, the University of Chicago, Universities Research Association and the U.S. Government as additional insureds, before physical work starts From 1.0 RFP 376508-CD Instructions to Offerors.pdf:
…before physical work at the site commences.
- Davis-Bacon wage rates and weekly certified payroll through LCPTracker, passed down to every lower-tier subcontractor From 1.0 RFP 376508-CD Instructions to Offerors.pdf:
The awarded Subcontract is subject to the wage and labor standards under the Davis-Bacon Act and the…
Not in the notice text
- Part of the text is missing: the middle of the Instructions to Offerors (Criterion 3, the Business Management and Price Proposal, pass/fail items, submission method) was left out, and the drawings (Exhibit B), specifications (Exhibit C), price form (Exhibit K), geotechnical report (Exhibit D), bid bond form (Exhibit N), Davis-Bacon wage rates (Exhibit Q) and the safety questionnaire (Exhibit J) are attached but not read
- How and where to submit the proposal, and any page limits, are not in the text read
- The bid guarantee amount is not in the text read
- The Government's estimate or contract value is not given
- The text read does not say whether the December 2 and 3, 2026 site visits or the October 1, 2026 pre-proposal meeting are required; the meeting is described as strongly recommended
Notice details
Notice type, codes, versions and files
- Posted
- Nov 19, 2026
- Notice type
- Solicitation
- Office
- Fermilab - DOE Contractor, Batavia, IL
- Product/service code
- Z2EZ · Repair or Alteration of Other Industrial Buildings
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236210)
- Versions
5 versions have been posted, newest first.
- Nov 19, 2026 · Amendment 0004 (this version)Due Dec 17, 2026
- Oct 30, 2026 · Amendment 0003Due Dec 17, 2026 (changed)
- Oct 7, 2026 · Amendment 0002Due Nov 17, 2026
- Oct 6, 2026 · Amendment 0001Due Nov 17, 2026
- Sep 17, 2026 · SolicitationDue Nov 17, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- Design-Build Renovation of Building 164, Outdoor Recreation Center, Homestead Air Reserve Base, FloridaThe Department of the Air Force (contracting office FA6648 482 LSS LGC) wants a firm-fixed-price design-build contractor to renovate the Outdoor Recreation Center, Building 164,…
- Hangar 140 Renovations at Naval Air Staton (NAS) Jacksonville (JAX), Jacksonville, FloridaNAVFAC Southeast (Naval Facilities Engineering Systems Command) is doing market research (a sources sought notice, not a solicitation) for a design-bid-build renovation of the…
- $95M Tenant Renovation of Secure Spaces (TRSS) Multiple Award Task Order Contract (MATOC)The U.S. Army Corps of Engineers (USACE) Omaha District is running a sources sought (market research, not a request for offers) for a $95M Tenant Renovation of Secure Spaces…
- Building 262 Renovation, FLETC Glynco, GeorgiaThe Federal Law Enforcement Training Center (FLETC) at Glynco, Georgia wants a contractor to renovate Building 262 under solicitation 70LGLY27RSSB00001, one firm-fixed-price…
- 673-901 Brooksville CBOC Renovation Minor Design-Build - Brooksville, FLThis is a sources sought notice, not a solicitation: the Department of Veterans Affairs (VA) is asking firms for capability statements by December 3, 2026, 1:00 PM Eastern, for a…