Solicitation
155mm Modular Artillery for Combat Effectiveness (MACE)
Department of Defense · Department of the Army
A newer version of this notice was posted Nov 23, 2026. See the latest version.
AI summary Beta
Summary of the version posted Nov 17, 2026. The notice was amended Nov 23, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 13 of 14 attachments weren't read (Attachment 26 - Updated MACE Offeror Questions Addressed (Dated10-15).xlsx, Attachment_36___Updated_MACE_Offeror_Questions_Addressed__Dated11_16xlsx.xlsx and 11 more). Check the attachments on SAM.gov.
Army Contracting Command - Rock Island at Picatinny seeks proposals for the 155mm Modular Artillery for Combat Effectiveness (MACE) prototype project, solicitation W15QKN26R1C5R (W15QKN-26-R-1C5R), to award up to two prototype Other Transaction Agreements (OTAs: special agreements that are not standard contracts). One proposal covers both phases: Phase I (range 30-35 km) and Phase II (range beyond 35 km). Proposals are due November 30, 2026, 3:00 PM Eastern, through the Procurement Integrated Enterprise Environment (PIEE) Proposal Manager Module. Only bidders meeting a nontraditional-contractor, small-business or cost-share test are eligible.
Who can bid (5)
- Meet one of the four statutory tests: a nontraditional defense contractor or nonprofit research institution participating to a significant extent; all significant participants small businesses or nontraditional contractors; at least one third of cost paid by non-Federal sources; or a written exceptional-circumstances finding. From PPON MACE Extended Updated Attachments- W15QKN26R1C5R (Dated 10-15).docx
- Register in SAM.gov to get a CAGE code and Unique Entity Identifier; register in Wide Area Work Flow (WAWF) through PIEE to be paid after award. From PPON MACE Extended Updated Attachments- W15QKN26R1C5R (Dated 10-15).docx
- Current DD 2345 (Military Critical Technical Data Agreement), signed non-disclosure agreement and technical data questionnaire to receive the controlled Purchase Description and drawings; distribution is limited to Department of War (DoW) and U.S. DoW contractors. From PPON MACE Extended Updated Attachments- W15QKN26R1C5R (Dated 10-15).docx
Show all 5Show fewer
- Agreements Officer finds the bidder responsible and not suspended, debarred or barred by law or executive order. From PPON MACE Extended Updated Attachments- W15QKN26R1C5R (Dated 10-15).docx
- Section 889 certification: evidence of the SAM.gov entry for FAR provision 52.204-26 (and 52.204-24 if applicable) on certain telecommunications and video surveillance equipment. From PPON MACE Extended Updated Attachments- W15QKN26R1C5R (Dated 10-15).docx
How to submit: Electronically through the Procurement Integrated Enterprise Environment (PIEE) Proposal Manager Module (piee.eb.mil), per Amendment 0009; the direct solicitation link is on the SAM.gov notice. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (10)
- Serious: Eligibility test for prototype agreements. A traditional defense contractor must team with a nontraditional contractor, qualify as small business, or offer a one-third cost share to be considered. From PPON MACE Extended Updated Attachments- W15QKN26R1C5R (Dated 10-15).docx
- Serious: Both phases are proposed together. This notice is for the full proposal covering Phase I and Phase II at once, and the Government may start Phase II before Phase I is finished. From PPON MACE Extended Updated Attachments- W15QKN26R1C5R (Dated 10-15).docx
- Serious: Controlled technical data needed to bid. Purchase Description and drawings come only after signed agreements and a DD 2345; other attachments (Questions Addressed spreadsheets, specifications) also need access on SAM.gov.
Show all 10Show fewer
- Serious: Explosive-loaded projectiles. Hazard class 1.1D items require arms, ammunition and explosives handling, safety data sheets and compliance with ITAR, so facilities and security matter. From PPON MACE Extended Updated Attachments- W15QKN26R1C5R (Dated 10-15).docx
- Worth checking: Submission portal is PIEE, not SAM.gov. The PPON text says to submit through SAM.gov, but Amendment 0009 changed it to the PIEE Proposal Manager Module, which needs a PIEE account.
- Worth checking: Questions were due Nov 18, 2026. Check the amendments for the agency's answers.
- Worth checking: Terms and Conditions are not negotiated. A bidder that cannot accept the Government's terms may lose the award to another bidder. From PPON MACE Extended Updated Attachments- W15QKN26R1C5R (Dated 10-15).docx
- Worth checking: Funding not fully obligated at award. Funds arrive when appropriated, and the schedule, milestones or statement of work may be renegotiated. From PPON MACE Extended Updated Attachments- W15QKN26R1C5R (Dated 10-15).docx
- Worth checking: Excess pages are not read. Volumes I and II are capped at 23 pages each, and pricing anywhere outside Volume III breaks the rules. From PPON MACE Extended Updated Attachments- W15QKN26R1C5R (Dated 10-15).docx
- Minor: Scale-up to 10,000 projectiles per year. Proposals must show a design approach for a follow-on production capability of this size. From PPON MACE Extended Updated Attachments- W15QKN26R1C5R (Dated 10-15).docx
Read from the notice and 1 attachment. 13 of 14 not read. Show which files.
- PPON MACE Extended Updated Attachments- W15QKN26R1C5R (Dated 10-15).docx (read)
- Attachment 26 - Updated MACE Offeror Questions Addressed (Dated10-15).xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attachment_36___Updated_MACE_Offeror_Questions_Addressed__Dated11_16xlsx.xlsx: not read (access is restricted): request it on SAM.gov
- Attachment_35___Updated_MACE_Offeror_Questions_Addressed__Dated11_12.xlsx: not read (access is restricted): request it on SAM.gov
- Attachment 34 - 12961016 - Rotating Band Cover.pdf: not read (access is restricted): request it on SAM.gov
- Attachment_33___Updated_MACE_Offeror_Questions_Addressed__Dated11_5.xlsx: not read (access is restricted): request it on SAM.gov
- Attachment 19 - M1128 Base Bleed Package.pdf: not read (access is restricted): request it on SAM.gov
- Attachment 21 - rf_smoke_payload.pdf: not read (access is restricted): request it on SAM.gov
- Attachment 22 - SPEC_MIL-DTL-32720_M1128_Base_Burner 5.pdf: not read (access is restricted): request it on SAM.gov
- Attachment 17 - 3D Model Creation and Standardization Guidance Document - 13 Dec 2021.docx: not read (access is restricted): request it on SAM.gov
- Attachment 18 - Contract Quality Requirements for MACE.docx: not read (access is restricted): request it on SAM.gov
- Attachment 20 - MACE_BB_Motor_Assembly_Components_20260626.xlsx: not read (access is restricted): request it on SAM.gov
- Attachment 8 - Purchase Description - MUST BE SUBMITTED FOR TDP ACCESS.pdf: not read (access is restricted): request it on SAM.gov
- Attachment 9 - Packaging and Unitization - MUST BE SUBMITTED FOR TDP.pdf: not read (access is restricted): request it on SAM.gov
Full summary
What they want
- Design and prototype a manufacturing process for 155mm cargo-carrying artillery projectiles (MACE) that accept different payloads.
- Phase I: develop and qualify a projectile reaching 30-35 km, and deliver loaded, assembled and packed (LAP) projectiles for engineering, safety, qualification and soldier tests.
- Phase II: develop and qualify a projectile with a new range-extension design reaching beyond 35 km, and deliver LAP projectiles for testing.
- Show how the process could scale to up to 10,000 artillery projectile systems per year under a possible follow-on production contract or agreement.
- Send one proposal with four volumes: Phase I, Phase II, Cost/Price (Contract Line Item Numbers (CLINs) 0001 through 0026), and agreement documents.
- Follow arms, ammunition and explosives rules (Department of Defense Manual 5100.76-M), packing and marking rules and export rules (ITAR) for the explosive-loaded projectiles.
- Contract type
- Prototype Other Transaction Agreement (OTA) under 10 U.S.C. 4022, anticipated as cost-plus-fixed-fee (the Government pays your costs plus a set fee); up to two awards
- Period of performance
- Phase I estimated at thirty-four (34) months; Phase II duration to be defined. Amendment 0007 gives an anticipated award date of March 29, 2027.
- Estimated value
- Not stated
- Contract vehicle
- Prototype OTA competed under 10 U.S.C. 4022; a follow-on production contract or transaction may be awarded without further competition
- How they'll choose
- Best value: an integrated assessment of all factors, not lowest price. Cost/Price is evaluated but not rated; non-cost factors are significantly more important. Up to two awards, possibly one or none.
- Offers due
- November 30, 2026, 3:00 PM Eastern (from the version posted Nov 17, 2026; amended since)
- How to submit
- Electronically through the Procurement Integrated Enterprise Environment (PIEE) Proposal Manager Module (piee.eb.mil), per Amendment 0009; the direct solicitation link is on the SAM.gov notice
- Page limits
- Volume I Phase I: maximum 23 pages. Volume II Phase II: maximum 23 pages. Cover letter: maximum 2 pages. Schedule narratives: maximum 3 pages each.
What they'll judge offers on
- Factor 1, Phase I (155mm MACE to 30-35 km): Sub-factor 1.1 Schedule (most important for Phase I), Sub-factor 1.2 Technical
- Factor 2, Phase II (alternate range extension beyond 35 km): Sub-factor 2.1 Technical (most important for Phase II), Sub-factor 2.2 Schedule
- Factor 3, Cost/Price: Total Evaluated Price is Phase I plus Phase II, less any proposed cost share; checked for realism, reasonableness, allowability and allocability
What to include when you submit
- Volume I (Phase I) and Volume II (Phase II): each covers Technical and Schedule. Include an Integrated Master Schedule (IMS) as a PDF and a Microsoft Project file; only the PDF is evaluated.
- Volume III (Cost/Price): Microsoft Excel with working formulas, a price for every CLIN 0001 through 0026 with cost and fixed fee, a basis of estimate, and a completed SOW Section 6.0 milestone table. No pricing in the other volumes.
- Volume IV (agreement documents): cover letter, Terms and Conditions returned with highlighted blanks completed and requested minor deviations in tracked changes, Business Status Certification (Attachments 2 and 3), and Section 889 certification evidence.
- Cover letter must give company name, point of contact, UEI (unique entity ID) and CAGE code (a number identifying a business to the government), SAM.gov confirmation for NAICS 332993, small business status, team members, a six-month proposal validity statement and authorized signatures.
- Use searchable MS Office or PDF files in Arial type (12-point text); no ZIP files, self-extracting files or hyperlinks. The proposal stays valid for six (6) months.
- To get the Purchase Description and packing drawings, first sign and send Attachment 12 (Technical Data Request Questionnaire), Attachment 6 (Non-Disclosure and Non Use Agreement) and Attachment 14 (DD 2345).
- Use the November 16, 2026 documents (Terms and Conditions, PPON, CLIN structures and timelines) as the sole basis for the proposal, per Amendment 0011.
Current contractor
No incumbent is named. The notice has gone through eleven amendments and 19 versions; the response deadline moved from September 30, 2026 to October 30, 2026 (Amendment 0001) and then to November 30, 2026 (Amendment 0007).
Not in the notice text
- The solicitation's controlled files (Purchase Description, packing drawings, specifications, the questions-and-answers spreadsheets) are attached on SAM.gov but were not read; request access there.
- The text read is the October 15, 2026 version of the proposal notice (PPON); the November 16, 2026 version, Terms and Conditions, CLIN Matrix and Statement of Work are not in what was read. Check SAM.gov.
- The October 15, 2026 PPON still lists the submission portal as SAM.gov and the due date as October 30, 2026; later amendments replace them.
- The set-aside is not stated on SAM.gov; the notice's own eligibility tests are described above.
- Government estimate or ceiling value, place of performance and quantities per CLIN are not stated in the text read.
- Phase II duration is described as to be defined.
More to check before you bid
- The AI summary also reads the notice as naming requirements:
- The AI summary's reading of the notice and its attachments says a bidder needs: DD 2345 export approval. The summary's list is under Who can bid; check it in the notice before you bid.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 17, 2026
- Notice type
- Solicitation
- Office
- W6QK ACC-Ri-Picatinny, Picatinny Arsenal, NJ
- Product/service code
- 1320 · Ammunition, Over 125MM
- Business type
- Weapons & ammunition (FedReady's grouping, from NAICS 332993)
- Versions
20 versions have been posted, newest first.
- Nov 23, 2026 · AmendmentDue Nov 30, 2026
- Nov 17, 2026 · AmendmentDue Nov 30, 2026
- Nov 17, 2026 · Amendment 0012 (this version)Due Nov 30, 2026
- Nov 12, 2026 · AmendmentDue Nov 30, 2026
- Nov 12, 2026 · AmendmentDue Nov 30, 2026
- Nov 9, 2026 · AmendmentDue Nov 30, 2026
- Nov 9, 2026 · AmendmentDue Nov 30, 2026
- Oct 30, 2026 · AmendmentDue Nov 30, 2026
- Oct 27, 2026 · AmendmentDue Nov 30, 2026 (changed)
- Oct 16, 2026 · AmendmentDue Oct 30, 2026
- Oct 6, 2026 · AmendmentDue Oct 30, 2026
- Sep 24, 2026 · AmendmentDue Oct 30, 2026
- Sep 24, 2026 · AmendmentDue Oct 30, 2026
- Sep 18, 2026 · AmendmentDue Oct 30, 2026
- Sep 9, 2026 · AmendmentDue Oct 30, 2026
- Sep 1, 2026 · AmendmentDue Oct 30, 2026
- Sep 1, 2026 · AmendmentDue Oct 30, 2026
- Aug 31, 2026 · AmendmentDue Oct 30, 2026 (changed)
- Aug 19, 2026 · AmendmentDue Sep 30, 2026
- Aug 19, 2026 · SolicitationDue Sep 30, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- M231/M232A2, Modular Artillery Charge System (MACS) Load, Assemble, and Pack (LAP)SAM.gov lists a response date of February 15, 2027, 5:00 PM Eastern, but the notice says the formal solicitation is expected in Quarter 2, FY27.
- M82 EnergeticsArmy Contracting Command - Rock Island (ACC-RI), for Pine Bluff Arsenal in Arkansas, wants three explosive parts for the M82 Simulant Screening Grenade: booster burster, delay…
- Cockpit Selectable Height of Burst Sensor (CHOBS)The Air Force Life Cycle Management Center at Hill Air Force Base is asking which companies can build the Cockpit Selectable Height of Burst Sensor (CHOBS), a bomb fuze sensor…
- RFI forRecoverable Exercise Torpedo (REXTORP) and Fire Control Assembly (FCA) Production, Testing, and Sustainment SupportThis is a sources sought notice (a request for information, not a bid request).
- Solicitation: Holder, Ammunition (NSN: 1398-01-330-9529)Only small businesses can bid on this sealed-bid invitation for bids (IFB) from the Army (W6QK ACC-DTA), solicitation W912CH-27-B-A030, for 3 Each of Holder, Ammunition, National…