Solicitation
M82 Energetics
Department of Defense · Department of the Army
AI summary Beta
This summary may miss requirements: 6 of 11 attachments weren't read (Attchment 0001 -Price Matrix dated 12 Nov 2026.xlsx, Exhibit A - CDRLs.pdf and 4 more). Check the attachments on SAM.gov.
Army Contracting Command - Rock Island (ACC-RI), for Pine Bluff Arsenal in Arkansas, wants three explosive parts for the M82 Simulant Screening Grenade: booster burster, delay and slider assemblies. It is a firm-fixed-price base quantity plus options, open to all businesses with no set-aside. The response due date is December 18, 2026, 11:30 AM Central on SAM.gov, but the solicitation text says 3:00 PM CST that day.
Who can bid (5)
- Certified under the US/Canada Joint Certification Program with an approved DD Form 2345 (a military critical technical data agreement); the data custodian named on it must request the restricted drawings From W519TC27RA003 0001.pdf
- Active SAM.gov registration, and a SAM.gov account to reach the drawings From W519TC27RA003 0001.pdf
- Quality system that meets ISO 9001:2015, shown by independent certification or an equivalent system, or a plan to become compliant From W519TC27RA003 0001.pdf
Show all 5Show fewer
- Recent and relevant past performance on Department of Defense work From W519TC27RA003 0001.pdf
- Key personnel whose qualifications meet the minimums set in the solicitation (minimums are in Section L, not read) From W519TC27RA003 0001.pdf
Things to watch (10)
From the version posted Nov 17, 2026.
- Serious: Restricted drawings need a DD Form 2345 first. You can't see the drawings, and can't price or plan the work, until you hold a certified DD Form 2345 and the data custodian requests access; certification takes time. From W519TC27RA003 0001.pdf
- Serious: Instructions to offerors (Section L) were not fully read. Volume contents, page limits and the submission method are in Section L, which was only partly available; read the full solicitation on SAM.gov before bidding.
- Worth checking: Quote validity period conflicts: 240 days and 60 days. One paragraph says proposals stay valid for 240 days after final proposals are received; another says 60 days. Ask the contracting officer which governs. From W519TC27RA003 0001.pdf
Show all 10Show fewer
- Worth checking: First Article Test required. Sample units must be built, measured and approved before production, adding cost and time early in the contract. From W519TC27RA003 0001.pdf
- Worth checking: Every technical subfactor must pass. One Unacceptable rating on production capability, quality system, program management or delivery schedule removes the offer from consideration, whatever the price. From W519TC27RA003 0001.pdf
- Worth checking: Option quantities use range pricing. Option unit prices depend on the total quantity ordered, and the Government must be able to execute your prices at each range limit.
- Worth checking: Small Business Participation Plan required from all bidders. Every bidder, large or small, must submit a plan; it is scored against goals such as 25% small business. From Attachment 0004 - Small Business Participation Plan.pdf
- Worth checking: Government-furnished property is as-is. Repairs, replacement and refurbishment of the furnished parts are at the contractor's expense. From W519TC27RA003 0001.pdf
- Minor: Inspection and acceptance location unclear. The amendment says inspection and acceptance are at origin, while Section E says inspection is at origin and acceptance is at destination. From W519TC27RA003 0001.pdf
- Minor: Questions due November 27, 2026. Questions about the solicitation and drawings go by email to the two named contacts by 3:00 PM CST on November 27, 2026. From W519TC27RA003 0001.pdf
Read from the notice and 5 attachments. 6 of 11 not read. Show which files.
- Solicitation - W519TC27RA003.pdf (read)
- W519TC27RA003 0001.pdf (read)
- Attachment 0002 - GFP Attachment - 27RA0003.pdf (read)
- Attachment 0004 - Small Business Participation Plan.pdf (read)
- Attachment 0003 - Past Performance Questionnaire.pdf (read)
- Attchment 0001 -Price Matrix dated 12 Nov 2026.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Exhibit A - CDRLs.pdf: not summarized: open it on SAM.gov
- 13-19-156F Booster Burster Assembly ZIP File.zip: not read (access is restricted): request it on SAM.gov
- 13-19-152F Delay Assembly zip file.zip: not read (access is restricted): request it on SAM.gov
- 13-19-152F Slider Assembly ZIP FILE.zip: not read (access is restricted): request it on SAM.gov
- Attachment 0005 - EA-G-1723.pdf: not read (access is restricted): request it on SAM.gov
Full summary
What they want
- Make booster burster assemblies, delay assemblies and slider assemblies to restricted drawings (the technical data package, or TDP); base QTY 97,250 Each of each item in the original schedule, plus options for up to 97,250 each
- Complete a First Article Test (FAT: an early sample test the Government approves before production) for each item, due 90 days after the contract date, with a FAT report measuring every drawing requirement
- Start production deliveries 120 days after FAT approval
- Pass inspection at the maker's plant by the Defense Contract Management Agency (DCMA), using MIL-STD-1916 sampling
- Package and mark containers per MIL-STD-1168, naming the contractor, contract number, item description and lot or batch number
- Manage Government-furnished property (retainers and housings for the items) under a written property management plan
- Contract type
- Firm-fixed-price (FFP: one set price, whatever the work ends up costing), base quantity plus option quantity; options use range pricing
- Period of performance
- Five-year period of performance, running from award through the last scheduled base and option deliveries
- Place of performance
- Pine Bluff, AR, USA (SAM.gov field); items go to Pine Bluff Arsenal, Central Receiving Shipping Point, Bldg 53990
- Estimated value
- Not stated
- How they'll choose
- Lowest priced technically acceptable (LPTA): award goes to the lowest evaluated price among offers rated Acceptable on the technical factor and on past performance
- Offers due
- December 18, 2026, 11:30 AM Central (SAM.gov); the solicitation text says 3:00 PM CST on 18 December 2026
What they'll judge offers on
- Volume I Technical (pass or fail; all four subfactors must be Acceptable): (1) production capability, (2) quality system, (3) program management plan, (4) delivery schedule
- Volume II Past Performance (pass or fail): recent and relevant Department of Defense work; no record is rated Acceptable
- Volume III Price: lowest total evaluated price from the price matrix, checked for reasonableness and unbalanced pricing
- Volume IV Small Business Participation Plan: proposed percentages compared with the Government's goals, rated Acceptable or Unacceptable
What to include when you submit
- Send four volumes: Technical, Past Performance, Price and Small Business Participation Plan
- Price: send the completed Attachment 0001 Price Matrix as an electronic Microsoft Excel file, plus an addendum explaining any pricing assumptions; unit prices go to two decimal places
- Prices must be fully executable at the unit prices and quantity range limits in the price matrix; prices are FOB Origin; price the separate FAT lines too
- Technical: include a manufacturing plan with flow chart, cycle times, scrap rates and facilities, a General Quality Manual, a program management plan with key personnel, a property management plan and a delivery schedule
- Past performance: contract references must show recent, relevant Department of Defense work
- Small business: complete the Small Business Participation Plan (Attachment 0004) with percentages by category
- Provide a signed copy of the solicitation and all its amendments, and acknowledge each amendment
- Provide your CAGE code and SAM unique entity identifier (UEI)
- Email questions about the solicitation and drawings to MichelleAnn Hulett and Michelle Lund with the RFP number in the subject line
After award, you must have
- Employees who need base access but no Common Access Card (CAC) must pass background screening (NCIC III and Terrorist Screening Database) before entering the installation From W519TC27RA003 0001.pdf:
Contract and all associated sub-contractors employees shall comply with adjudication standards…
Not in the notice text
- Parts of the solicitation and Amendment 0001 text were left out (about 184,000 and 89,000 characters), including most of Section L (instructions to offerors), so volume contents, page limits and the submission method are not confirmed.
- Attachment 0001 Price Matrix dated 12 Nov 2026 is attached but not read; the line quantities and price ranges are there.
- Exhibit A - CDRLs (contract data requirements list) is a scanned PDF that was not read.
- The drawings (Booster Burster, Delay and Slider ZIP files) and Attachment 0005 EA-G-1723 are controlled files; request access on SAM.gov.
- The Government's estimate or contract value is not stated.
- Minimum key personnel requirements are not in the text read.
- The delivery schedule by quantity after initial delivery is not in the text read.
More to check before you bid
- The AI summary also reads the notice as naming requirements:
- The AI summary's reading of the notice and its attachments says a bidder needs: DD 2345 export approval. The summary's list is under Who can bid; check it in the notice before you bid.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 17, 2026
- Notice type
- Solicitation
- Office
- W6QK ACC-Ri, Rock Island, IL
- Product/service code
- 1330 · Grenades
- Business type
- Weapons & ammunition (FedReady's grouping, from NAICS 332993)
- Versions
2 versions have been posted, newest first.
- Nov 17, 2026 · Amendment 0001 (this version)Due Dec 18, 2026
- Nov 6, 2026 · SolicitationDue Dec 18, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- 155mm Modular Artillery for Combat Effectiveness (MACE)Army Contracting Command - Rock Island at Picatinny seeks proposals for the 155mm Modular Artillery for Combat Effectiveness (MACE) prototype project, solicitation W15QKN26R1C5R…
- M231/M232A2, Modular Artillery Charge System (MACS) Load, Assemble, and Pack (LAP)SAM.gov lists a response date of February 15, 2027, 5:00 PM Eastern, but the notice says the formal solicitation is expected in Quarter 2, FY27.
- Cockpit Selectable Height of Burst Sensor (CHOBS)The Air Force Life Cycle Management Center at Hill Air Force Base is asking which companies can build the Cockpit Selectable Height of Burst Sensor (CHOBS), a bomb fuze sensor…
- RFI forRecoverable Exercise Torpedo (REXTORP) and Fire Control Assembly (FCA) Production, Testing, and Sustainment SupportThis is a sources sought notice (a request for information, not a bid request).
- Solicitation: Holder, Ammunition (NSN: 1398-01-330-9529)Only small businesses can bid on this sealed-bid invitation for bids (IFB) from the Army (W6QK ACC-DTA), solicitation W912CH-27-B-A030, for 3 Each of Holder, Ammunition, National…