Combined Synopsis/Solicitation
Eaton Powerware System Replacement
Department of Veterans Affairs
SDVOSB set-aside · Manchester, NH
A newer version of this notice was posted Nov 18, 2026. It moves the due date from Nov 26, 2026 to Nov 30, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of the version posted Nov 10, 2026. The notice was amended Nov 18, 2026. The due date moved from Nov 26, 2026 to Nov 30, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 2 of 4 attachments weren't read (Attachment A - Eaton 93E UPS manufacturer cut sheets and site electrical drawings Start-Up.pdf, Attachment B - Wage Determination No 2015-4019 rev 35.pdf). Check the attachments on SAM.gov.
Only service-disabled veteran-owned small businesses (SDVOSBs) can quote on solicitation 36C24127Q0030 from the Department of Veterans Affairs (VA). The VA wants an old Eaton Powerware 9390 uninterruptible power supply (UPS, battery backup power) replaced at the Manchester VA Medical Center in New Hampshire, then maintained. The base year runs January 4, 2027 to January 3, 2028, with four option years. The response due date is November 26, 2026, 5:00 PM Eastern.
Who can bid (5)
- Service-disabled veteran-owned small business (SDVOSB): the notice is 100% set aside for SDVOSBs, verified in the SBA Veteran Small Business Certification (VetCert) database From 36C24127Q0030.docx
- Registered in the System for Award Management (SAM) when the quote is submitted, with annual representations and certifications completed there From 36C24127Q0030.docx
- Qualified and authorized to work on Eaton products, with access to Eaton's proprietary software From 36C24127Q0030.docx
Show all 5Show fewer
- Pay no more than 50% of the amount paid by the Government (excluding materials) to subcontractors that are not similarly situated entities, and certify this with the quote From 36C24127Q0030.docx
- Staff hold required qualifications, certifications and trade licenses; journeyman tradespeople are licensed for their trades From 36C24127Q0030.docx
How to submit: Email to Shawn.Lawrence@va.gov, due November 26, 2026, 5:00 PM Eastern. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (10)
- Serious: Only SDVOSBs can bid. The buy is limited to service-disabled veteran-owned small businesses verified in the SBA VetCert database; other businesses cannot be awarded it. From 36C24127Q0030.docx
- Serious: Must be authorized to work on Eaton equipment. A firm that isn't authorized by Eaton and doesn't have its proprietary software can't meet the requirement and would need an authorized subcontractor. From 36C24127Q0030.docx
- Serious: Subcontracting limit certificate must come with the quote. No more than 50% of the amount paid can go to firms that are not similarly situated, which limits how much you can subcontract to an Eaton-authorized firm; a missing certificate means no evaluation. From 36C24127Q0030.docx
Show all 10Show fewer
- Worth checking: The site visit was Nov 16, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From 36C24127Q0030.docx
- Worth checking: Drawings and wage determination not read. Attachment A (Eaton cut sheets and electrical drawings) and Attachment B (wage determination) are scanned files whose text could not be read here; check them on SAM.gov.
- Worth checking: Service Contract Act wages apply. Wage Determination 2015-4019, Revision 35, for Hillsborough County, NH sets the minimum pay for the labor lines, so price against it. From 36C24127Q0030.docx
- Worth checking: Parts rules: $500 per item per visit and $2,500 yearly cap. The statement of work says the contractor supplies parts at $500 per equipment item per visit and a cost proposal within 24 hours above that; the price schedule fixes the parts line at $2,500 NTE per year. How the two fit is unclear. From 36C24127Q0030.docx
- Worth checking: Fast response and repair times. Emergency call-backs need a 4-hour response, and repairs must be finished within 24 hours after the need is identified. From 36C24127Q0030.docx
- Minor: Two weeks' notice before any UPS power-down. Any service that powers down the UPS needs two weeks' notice to the VA for outage coordination, which affects scheduling. From 36C24127Q0030.docx
- Minor: Attachment letters don't match. The attachment list shows the subcontracting certificate as Attachment C, while the clause table calls it Attachment E and gives Attachment C to the VAAR 852.240-70 certification; ask the contracting officer which applies. From 36C24127Q0030.docx
Read from the notice and 2 attachments. 2 of 4 not read. Show which files.
- 36C24127Q0030_1.docx (read)
- 36C24127Q0030.docx (read)
- Attachment A - Eaton 93E UPS manufacturer cut sheets and site electrical drawings Start-Up.pdf: not summarized: open it on SAM.gov
- Attachment B - Wage Determination No 2015-4019 rev 35.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Replace the existing Eaton Powerware 9390 UPS with an Eaton 93E UPS and Extended Battery Cabinet, or equal (CLIN 0005, QTY 1 JOB; a CLIN is one priced line of the order)
- Train staff on daily maintenance inspections and basic Eaton UPS operation (CLIN 0006, QTY 1 JOB)
- Quarterly and annual preventative maintenance and inspection of the UPS and batteries (CLIN 0001, QTY 4 QTR each year)
- Standby labor for large electrical shutdowns twice a year, 12 hours each (CLIN 0002, QTY 48 HR each year)
- Emergency on-call labor with a 4-hour response (CLIN 0003, QTY 32 HR each year)
- Non-routine parts and materials at a Government-set not-to-exceed (NTE) amount of $2,500 per year (CLIN 0004, QTY 1 YR)
- Written report within one week of each maintenance activity, plus a calendar-year maintenance schedule, safety plans and a lock-out/tag-out plan before work starts
- Contract type
- Request for quotation (RFQ) with line-item pricing; a combined synopsis/solicitation, so no separate solicitation document will be issued
- Period of performance
- Base year January 4, 2027 through January 3, 2028, plus four 12-month option years; FAR 52.217-9 allows an extension of the term
- Place of performance
- Manchester VA Medical Center, 718 Smyth Road, Manchester, NH 03104
- Remote work
- No. From 36C24127Q0030.docx:
The Contractor shall operate on premises 0700–1630 unless otherwise authorized…
- Estimated value
- Not stated
- How they'll choose
- Award to the offer most advantageous to the Government, price and other factors considered
- Offers due
- November 26, 2026, 5:00 PM Eastern (from the version posted Nov 10, 2026; amended since)
- How to submit
- Email to Shawn.Lawrence@va.gov
What they'll judge offers on
- Technical or Quality: how well the quote meets or exceeds the statement of work (SOW) requirements
- Past Performance: relative risk based on past performance records, customer surveys, questionnaires and CPARS (government contractor performance reports)
- Price: the sum of all line-item prices, base year plus all options; unbalanced option prices may be rejected
What to include when you submit
- Fill in unit and extended prices for every priced line; carry the $2,500 NTE amount on the parts line (CLIN X004) as shown and don't price it competitively
- Include one of the two required statements that the solicitation's terms and conditions are acceptable, with or without listed exceptions and reasons
- Return the signed VAAR 852.219-75 Certificate of Compliance (limits on subcontracting) with the quote
- Return the completed VAAR 852.240-70 certification with the quote (listed as Attachment C in the clause table)
- Include qualification and certification information for proposed employees and subcontractors
- Include the solicitation number, your name, address and phone, your unique entity identifier (UEI) and a statement of agreement with all terms
- Submit written questions to the point of contact by 5:00 PM EST on November 19, 2026
Current contractor
No incumbent is named. The statement of work says the current Eaton Powerware 9390 unit has needed periodic preventative maintenance, but it names no maintenance contractor.
Not in the notice text
- Attachment A (Eaton cut sheets, site and electrical drawings, start-up scope of work) and Attachment B (wage determination) are on SAM.gov but their scanned text couldn't be read here; check them there
- The evaluation provision refers to information requested in a "Section 7" that isn't in the text read, so exactly what a quote must contain beyond the items above is unclear
- The text for VAAR 852.240-70 (Attachment C per the clause table) and VAAR 852.204-72 (Attachment D) wasn't included
- No dollar estimate is given for the contract as a whole
- Whether the Government will pick the winner by trade-off or another method isn't spelled out beyond the three factors
More to check before you bid
- Not certified through VetCert yet? Apply on VetCert (SBA), or start with the SDVOSB guide. More open service-disabled veteran-owned set-asides under NAICS 811310
Notice details
Notice type, codes, versions and files
- Posted
- Nov 10, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- 241-Network Contract Office 01 (36C241), Togus, ME
- Product/service code
- J061 · Maint/Repair/Rebuild of Equipment – Electric Wire and Power Distribution Equipment
- Business type
- Equipment repair & maintenance (FedReady's grouping, from NAICS 811310)
- Versions
3 versions have been posted, newest first.
- Nov 18, 2026 · Amendment 0002Due Nov 30, 2026 (changed)
- Nov 10, 2026 · Amendment 0001 (this version)Due Nov 26, 2026
- Nov 4, 2026 · Combined Synopsis/SolicitationDue Nov 26, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Open SDVOSB set-aside contracts
Terms on this notice: Solicitation, SDVOSB (service-disabled veteran-owned small business), Set-aside