Sources Sought
Pre-Solicitation Site Visit: Leavenworth Redundant Core Project
Department of Justice · Federal Prison System / Bureau of Prisons
More open Federal Prison System / Bureau of Prisons contracts
AI summarySources sought notice Leavenworth_Redundant_Core (Pre-Solicitation Site Visit: Leavenworth Redundant Core Project) from the Federal Bureau of Prisons (BOP) National Acquisitions office. The BOP is asking industry for feedback on a draft statement of work to design and install a backup radio core, a 100-foot tower and a hardened shelter at FCI Leavenworth, Kansas. It is market research only, not a solicitation. The response due date is November 5, 2026, 8:30 AM Central; a voluntary site visit is the same morning, and security forms for attendees are due October 28, 2026. More in the summary
Market research, not a bid. Replying is free and tells Federal Prison System / Bureau of Prisons who could do this work. Send a short reply to the contracting contact; no price is needed. See the contact
AI summary Beta
Sources sought notice Leavenworth_Redundant_Core (Pre-Solicitation Site Visit: Leavenworth Redundant Core Project) from the Federal Bureau of Prisons (BOP) National Acquisitions office. The BOP is asking industry for feedback on a draft statement of work to design and install a backup radio core, a 100-foot tower and a hardened shelter at FCI Leavenworth, Kansas. It is market research only, not a solicitation. The response due date is November 5, 2026, 8:30 AM Central; a voluntary site visit is the same morning, and security forms for attendees are due October 28, 2026.
Who can bid
- No set-aside: SAM.gov lists no set-aside used for this sources sought notice
- Site visit attendees (no more than two per vendor) must submit an NCIC background check form and pass the check in advance
- Draft statement of work: a small business subcontracting plan if the prime is a large business
How to submit: Email to Kasie Redman, Contracting Officer, k2redman@bop.gov. Site visit security forms go only to Tanner Marshall, tmarshall@bop.gov.. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (6)
From the version posted Oct 26, 2026.
- Serious: Site visit security forms due October 28, 2026. Each attendee needs a background check form submitted by October 28, 2026, 2:00 PM ET, or is denied access; the notice itself gives no time for this deadline.
- Serious: Site visit strongly encouraged; no second visit promised. The site visit is November 5, 2026, 8:30 AM local time, and the Government may not offer another one during the formal solicitation period. Attendance is voluntary.
- Worth checking: Large, complex mixed build. One award would cover tower construction, a bullet-resistant concrete shelter, P25 Phase II core integration and 300 radios, so a small business would likely need teaming partners.
Show all 6Show fewer
- Worth checking: Liquidated damages. The draft statement of work sets a charge for delay of $1,000 per calendar day.
- Worth checking: Strict cybersecurity requirements. The draft requires FedRAMP High authority for cloud applications, NIST framework compliance and an Authority to Operate before installing equipment.
- Minor: Working inside a prison. Contractor staff must follow BOP entry and security rules, and standard working hours are limited.
Read from the notice and 3 attachments. Show which files.
- FC Leavenworth Redundant Core - Draft.pdf (read)
- Site Visit Procedures.pdf (read)
- NCIC Form.pdf (read)
Full summary
What they want
- Design, install, test and commission a redundant core radio system at FCI Leavenworth that backs up the BOP radio cores at FCC Victorville and FCC Allenwood
- Build a 100-foot self-supporting steel radio tower with foundation, grounding, lightning protection, ice bridge and a perimeter fence with gate
- Supply a prefabricated, climate-controlled concrete equipment shelter with a security door, dual air conditioning units and a concrete pad
- Supply and program 290 standard subscriber radios and 10 LTE (cellular-capable) radios, with chargers, spare batteries, microphones with body alarm buttons, GPS capability and programming software
- Meet 95% radio coverage across the institution and its property, with encryption, cybersecurity and Authority to Operate (ATO) requirements
- Provide design submittals at 30%, 60% and 100%, test reports, as-built drawings, training for BOP staff and a 12-month warranty
- Send capability statements and comments on the draft statement of work, schedule and risks to the contracting officer
- Period of performance
- Work to be completed within 720 calendar days from Notice to Proceed (NTP), per the draft statement of work
- Place of performance
- FCI Leavenworth, 1300 Metropolitan Ave., Leavenworth, KS 66048
- Estimated value
- Not stated
- Offers due
- November 5, 2026, 8:30 AM Central (9:30 AM Eastern)
- How to submit
- Email to Kasie Redman, Contracting Officer, k2redman@bop.gov. Site visit security forms go only to Tanner Marshall, tmarshall@bop.gov.
What to include when you submit
- Send company name, UEI (unique entity ID) or DUNS number, and CAGE code
- Send point of contact information and business size or category under NAICS 334220
- Send comments, recommendations or questions on the draft statement of work's clarity, feasibility, assumptions and risk areas
- Send capability statements showing experience with P25 Phase II trunked radio installation, ANSI/TIA-222 tower construction, secure communications shelters and core-level radio integrations
- Give feedback on the schedule, phasing and deliverables, and mention any subcontracting opportunities
- To attend the site visit, send an NCIC (National Crime Information Center) background check form for each attendee to Tanner Marshall by Wednesday, October 28, 2026, at 2:00 PM ET, with the email subject format given in the Site Visit Procedures
- Responses are voluntary and do not affect taking part in any future solicitation
After award, you must have
- Draft statement of work: an Authority to Operate (ATO) must be completed before any equipment is installed From FC Leavenworth Redundant Core - Draft.pdf:
An (ATO) Authority to Operate must be completed prior to installation of any equipment.
Current contractor
No incumbent is named. The draft statement of work says the new core must work with existing BOP radio infrastructure (FCC Victorville and FCC Allenwood cores) and that equipment will be maintained under a BOP maintenance contract.
Not in the notice text
- This is a draft statement of work for a sources sought notice; the final requirements, contract type, evaluation method and set-aside are not given
- The Government's estimate or budget is not stated
- Whether a Davis-Bacon wage determination (federal construction wage rule) applies is not stated, though the work includes tower and shelter construction
- The final fence requirements will be set at the initial site assessment and proposed in the 30% design submittal
- The wind speed for the tower design is given as 90-120 mph with site-specific load to be confirmed
Eligibility and how to respond
- No set-aside. Any business can reply: this is market research, and no bid is being taken yet.
- To respond, send a short reply to the contracting contact near the top of this page. No price is needed.
Notice details
- Posted
- Oct 26, 2026
- Notice type
- Sources Sought
- Office
- National Acquisitions - Co, Washington, DC
- Product/service code
- 5821 · Radio and Television Communication Equipment, Airborne
- Business type
- Electronic parts & equipment (supplies) (FedReady's grouping, from NAICS 334220)
- Versions
2 versions have been posted, newest first.
- Oct 26, 2026 · Amendment 0001 (this version)Due Nov 5, 2026
- Oct 23, 2026 · Sources SoughtDue Nov 5, 2026
- Attachments
Past awards and competition
Who has won work like this before, the likely incumbent, and what similar contracts paid, from USAspending.gov.
Before you respond
Terms on this notice: Sources sought notice
Full notice text from SAM.gov
Similar open opportunities
- Legacy Attitude Heading & Reference System (AHRS) Component Replacements – Low-cost Avionics Modernization Program II (LAMP II)The Air Force T-38 Program Office at Hill AFB, Utah is doing market research (a Sources Sought / Request for Information) to find off-the-shelf replacements for obsolete analog…
- Request For Information M67854-26-I-2023: Own Force Monitoring at Echelon (OFM-E) Electromagnetic Spectrum SensingThe Marine Corps is asking industry about a system that lets units see and analyze their own radio signals, called Own Force Monitoring at Echelon (OFM-E).
- Request for Information (RFI) for Group 1 and Group 2 Unmanned Aircraft System (UAS) Training, Mission Planning, Mission Rehearsal, Simulation, and Qualification Management SystemsThe Naval Air Systems Command Aircraft Project Management Office is running a request for information (RFI), which is market research and not a solicitation, on Group 1 and Group…
- Control, Radio SetDefense Logistics Agency (DLA) Aviation at Philadelphia wants quotes for a radio set control, solicitation SPRPA127QRA28.
- Receiver-Transmitte, in Repair/Modification ofThe Navy (NAVSUP Weapon Systems Support) wants a RECEIVER-TRANSMITTE, part number 822-2158-002, repaired and tested back to ready-for-issue condition.