642-22-104 | Upgrade Substation Building 2 Phase 1 for Philadelphia VAMC
Department of Veterans Affairs
SDVOSB set-aside · PA
AI summary Beta
This summary may miss requirements: 30 of 42 attachments weren't read (ALL-31-SINGLE-LINES-ONE-FILE-012325.pdf, Building 2_LS_SB_G_B FOR REFERENCE ONLY.pdf and 28 more). Check the attachments on SAM.gov.
The Department of Veterans Affairs (Network Contracting Office 4) wants a construction contractor to replace Electrical Substations 1 and 2 in Building 2 at the Corporal Michael J. Crescenz VA Medical Center in Philadelphia, PA (project 642-22-104, solicitation 36C24426R0088). Only verified service-disabled veteran-owned small businesses (SDVOSB: at least 51% owned and run by service-disabled veterans) can bid. Work runs 1,000 calendar days from the notice to proceed (NTP: the go-ahead to start work), the construction magnitude is between $5,000,000 and $10,000,000, and the response due date is December 7, 2026, 4:00 PM EST under Amendment 0004.
Who can bid
- Total service-disabled veteran-owned small business set-aside: only verified SDVOSBs can bid From 36C24426R0088_1.docx
- Bid bond (offer guarantee) required with the offer From RFI 2 Upgrade Substation 36C24426R0088.docx
How to submit: Email to Kevin Rodgers, kevin.rodgers2@va.gov. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (9)
From the version posted Nov 20, 2026.
- Serious: SDVOSB set-aside. Only verified service-disabled veteran-owned small businesses can bid as prime. From 36C24426R0088_1.docx
- Serious: Bid bond and 100% performance and payment bonds. You need a surety willing to bond a $5,000,000 to $10,000,000 job before you bid, and full bonds after award. From RFI 2 Upgrade Substation 36C24426R0088.docx
- Serious: Signed 852.219-75 certificate required. Leaving out the signed limitations on subcontracting certificate removes your proposal from consideration. From 36C24426R0088_1.docx
Show all 9Show fewer
- Worth checking: Price Option 2 only, no bid schedule. The specifications and drawings show two options, but the VA wants one price based only on Option 2, with no line-item schedule. From RFI 2 Upgrade Substation 36C24426R0088.docx
- Worth checking: Prices held for 180 days. The VA confirmed offers must stay open 180 calendar days, so material and labor price risk sits with the bidder. From RFI 2 Upgrade Substation 36C24426R0088.docx
- Worth checking: Shutdown work at night and on weekends. All work needing an electrical shutdown happens off-hours in an operating hospital, which raises labor cost. From Attachment 2 P09 Final SOW Rev1 Building 2 Substation Phase 1 642-22-104 10202026.docx
- Minor: Off-site conditioned storage needed. There is no storage on site, so you must store materials in your own conditioned space and bring them in daily. From Attachment 2 P09 Final SOW Rev1 Building 2 Substation Phase 1 642-22-104 10202026.docx
- Minor: No more questions accepted. Amendment 0004 closed the question period, so build any open issues into your price or assumptions. From 36C24426R0088 0004.pdf
- Minor: Response due date moved to December 7, 2026. The notice text still shows November 20, 2026, but Amendment 0004 extended the response due date to December 7, 2026, 4:00 PM EST. From 36C24426R0088 0004.pdf
Read from the notice and 12 attachments. 30 of 42 not read. Show which files.
- RFI 2 Upgrade Substation 36C24426R0088.docx (read)
- 36C24426R0088 0004.pdf (read)
- 36C24426R0088 0003.pdf (read)
- 36C24426R0088 0002.docx (read)
- 36C24426R0088 0001.docx (read)
- S04 Pre-Bid Sign-In Sheet 36C24426R0088 - 642-22-104 - Upgrade Substation.pdf (read)
- 36C24426R0088_1.docx (read)
- Safety Coordination Meeting Safety Policies for SOW Project 642-22-104.pdf (read)
- Substations Upgrade Building 2-Phase 1_Bid Documents_Specification_10-21-24.pdf (read)
- Attachment 2 P09 Final SOW Rev1 Building 2 Substation Phase 1 642-22-104 10202026.docx (read)
- VHA Dir 7714 Asbestos Management Program.pdf (read)
- MANHOLES 19529-02 VA Hospital of Philedelphia 11.17.22.pdf (read)
- ALL-31-SINGLE-LINES-ONE-FILE-012325.pdf: not read (it couldn't be opened): open it on SAM.gov
- Building 2_LS_SB_G_B FOR REFERENCE ONLY.pdf: not summarized: open it on SAM.gov
- Confined Space Entry Program.pdf: not summarized: open it on SAM.gov
- B6-SITE-POWER-WITH-MANHOLES-DWG-FINAL-070623.pdf: not summarized: open it on SAM.gov
- B02-SUB-4.pdf: not summarized: open it on SAM.gov
- B02-SUB-3.pdf: not summarized: open it on SAM.gov
- B02-SUB-1.pdf: not summarized: open it on SAM.gov
- B02-SUB-2.pdf: not summarized: open it on SAM.gov
- 2024-12-03_Green Procedure Program.pdf: not summarized: open it on SAM.gov
- 2024-12-03_HAZARDOUS AND UNIVERSAL WASTE POLICY.pdf: not summarized: open it on SAM.gov
- Asbestos Control Regulation.pdf: not summarized: open it on SAM.gov
- Fire Plan.pdf: not summarized: open it on SAM.gov
- 2024-12-03_HAZARDOUS MATERIALS AND WASTE MANAGEMENT PLAN.pdf: not summarized: open it on SAM.gov
- Electrical Safety Program.pdf: not summarized: open it on SAM.gov
- FMS SOP 138-54 Hot Work Policy.pdf: not summarized: open it on SAM.gov
- FIRE SYSTEM permit 2021 blank.pdf: not summarized: open it on SAM.gov
- 7714_D_2017-04-06 ASBESTOS MANAGEMENT PROGRAM.pdf: not summarized: open it on SAM.gov
- FMS SOP 138-44 Fire and Smoke Barrier Penetration Policy.pdf: not summarized: open it on SAM.gov
- Fire and Smoke Barrier Pentration Permit.pdf: not summarized: open it on SAM.gov
- B6-SUB-PRIMARY-NORMAL-324-371-DWG-FINAL-070623.pdf: not summarized: open it on SAM.gov
- SAFE PRACTICES FOR WORKING WITH LIVE ELECTRICAL POWER.pdf: not summarized: open it on SAM.gov
- Safety and Health During Construction.pdf: not summarized: open it on SAM.gov
- Inspection Final RAC Blank Master.docx: not summarized: open it on SAM.gov
- INFECTION PREVENTION AND CONTROL POLICY BEHAVIORAL HEALTH SERVICES.pdf: not summarized: open it on SAM.gov
- FMS 138-54 Hot Work Policy.doc: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Blank Above Ceiling Permit.pdf: not summarized: open it on SAM.gov
- Attachment 1 RFI 1 Upgrade Substation 642-22-104.docx: not summarized: open it on SAM.gov
- Attachment 3 General Decision Number PA20260003 10012026.docx: not summarized: open it on SAM.gov
- VHA ICRA-1.2 Oct 1 2024.pdf: not summarized: open it on SAM.gov
- Substations Upgrade Building 2-Phase 1 Combined Drawings.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Replace Electrical Substations 1 and 2 with new 480/277V substations, each with a 1500 kVA transformer
- Install a temporary 480/277V substation with a 1500 kVA transformer to keep the hospital powered, and leave it in place as a spare
- Price Option 2 only: the third substation stays as a spare behind a permanent wall (RFI 2, Q10)
- Build a new electrical room, replace feeders, transformers and controls, and do an arc flash hazard analysis, load monitoring and site assessment
- Mechanical work: design and install the HVAC cooling the new electrical equipment needs
- Phase all work to keep the medical center running; electrical shutdowns happen off-hours (8:00 p.m. to 6:00 a.m. or weekends)
- Demolish and dispose of the old substations, saving all existing breakers for the VA
- After award: infection control (ICRA) barriers by certified installers, daily huddles, weekly schedules and certified payrolls, safety training records, and an in-person safety coordination meeting before construction
- Period of performance
- 1,000 calendar days from notice to proceed (Amendment 0003 changed it from 365 calendar days)
- Place of performance
- Corporal Michael J. Crescenz VA Medical Center, Building 2, 3900 Woodland Avenue, Philadelphia, PA 19104
- Remote work
- No. From RFI 2 Upgrade Substation 36C24426R0088.docx:
The Superintendent shall always be on-site during construction and oversee all ICRA barrier installation.
- Estimated value
- Magnitude of construction: between $5,000,000 and $10,000,000
- How they'll choose
- Best value trade-off (Request for Proposal)
- Offers due
- December 7, 2026, 4:00 PM EST
- How to submit
- Email to Kevin Rodgers, kevin.rodgers2@va.gov
What to include when you submit
- Submit pricing and technical proposals together by the response due date
- Submit price on Standard Form 1442 (SF 1442: the construction offer form you sign and return)
- Price Option 2 only; no bid schedule will be provided
- Return a signed copy of VA clause 852.219-75 (the limitations on subcontracting certificate), or the proposal won't be considered
- Include a bid bond (offer guarantee) with the offer
- Hold your offer open for at least 180 calendar days after the response due date
- Acknowledge Amendments 0001 through 0004 on the offer or by separate letter or email
- Make sure large email files arrive on time: the Government is not responsible for proposals lost to file size or system errors
After award, you must have
- Performance and payment bonds at 100% of the contract price From RFI 2 Upgrade Substation 36C24426R0088.docx:
…federal construction contracts over $150,000 USD require both performance and payment bonds at 100% of the original contract price…
- Certificate of liability insurance within 10 days after award From 36C24426R0088_1.docx:
…proof of liability insurance is required within ten (10) days after ward of the contract…
- An OSHA-certified competent person on site whenever the general contractor or subcontractors are working From 36C24426R0088_1.docx:
…will maintain a presence at the work site whenever the general or subcontractors are present…
- Superintendent on site at all times, usually the infection control competent person, with 8-hour infection control risk assessment (ICRA) training From RFI 2 Upgrade Substation 36C24426R0088.docx:
The GC Superintendent is typically designated as the Infection Control Competent Person and is required to have an ICRA 8-hour training.
- Workers who handle or transport waste certified in RCRA, DOT and HAZWOPER (hazardous waste rules and training) From Attachment 2 P09 Final SOW Rev1 Building 2 Substation Phase 1 642-22-104 10202026.docx:
…must be certified in RCRA, DOT and HAZWOPER requirements…
- Key personnel of the contractor and subcontractors must get a PIV (federal ID) badge with a Tier 1 fingerprint and background check From RFI 2 Upgrade Substation 36C24426R0088.docx:
All PIV badges shall be issued under Tier 1 (fingerprint and NBIS background investigation).
Not in the notice text
- The evaluation factors and the middle of the solicitation (36C24426R0088_1.docx), most of the specifications and safety policies, and many Amendment 0004 attachments (drawings, RFI 1 answers, wage determination PA20260003) are attached but not read; check them on SAM.gov.
- The evaluation factors, their order of importance and any page limits are not in the text read.
- How far back past performance may go: RFI 2 says the VA won't extend it to 8 years, but the limit itself is in a section not read.
- The site visit was held July 22, 2026; the text read doesn't say it was mandatory. The specifications say visits are by appointment with the Medical Center's Engineering Officer.
- Wage rule: Amendment 0003 incorporates General Decision Number PA20260003 (a Davis-Bacon wage determination); the rates themselves were only partly read.
- The contract type (for example firm-fixed-price) isn't stated in the text read.
More to check before you bid
- Not certified through VetCert yet? Apply on VetCert (SBA), or start with the SDVOSB guide. More open service-disabled veteran-owned set-asides under NAICS 236220
Notice details
Notice type, codes, versions and files
- Posted
- Nov 20, 2026
- Notice type
- Solicitation
- Office
- 244-Network Contract Office 4 (36C244), Pittsburgh, PA
- Product/service code
- Z1DA · Maintenance of Hospitals and Infirmaries
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
8 versions have been posted, newest first.
- Nov 20, 2026 · Amendment 0007 (this version)Due Dec 7, 2026 (changed)
- Oct 27, 2026 · Amendment 0006Due Nov 20, 2026
- Oct 23, 2026 · Amendment 0005Due Nov 20, 2026
- Oct 22, 2026 · Amendment 0004Due Nov 20, 2026 (changed)
- Oct 22, 2026 · Amendment 0003Due Aug 31, 2026
- Aug 31, 2026 · Amendment 0002Due Aug 31, 2026
- Aug 4, 2026 · Amendment 0001Due Aug 31, 2026 (changed)
- Jul 2, 2026 · SolicitationDue Aug 19, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Open SDVOSB set-aside contracts
Terms on this notice: Solicitation, SDVOSB (service-disabled veteran-owned small business), Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Design Building (DB) 626-27-504 MHEOCC Compliance TVHS VAMC (Nashville Campus)Step 1 of 2: Standard Form 330 (SF330, the architect-engineer qualifications form) packages are due December 2, 2026, 1:00 PM Central Time.
- 523A4-CSI-288 3.0T MRI Site Prep - Design Build West Roxbury VA Medical Center (VAMC West Roxbury, MAPresolicitation: only service-disabled veteran-owned small businesses (SDVOSBs) can bid on this design-build project, which the Department of Veterans Affairs Program Contracting…
- Project Number 653-105, Seismic Retrofit of Building 16, Roseburg VAMC, OregonOnly certified service-disabled veteran-owned small businesses (SDVOSB) can bid on solicitation 36C10F26R0084, a Veterans Affairs request for proposals (RFP) for a seismic…
- Project Number 657-507, Correct Seismic Deficiencies for Building 14, Marion VAMC, Illinois Construction of New Boiler Plant and Demolition of ExistingSolicitation 36C10F26R0085: only Veterans Affairs-verified service-disabled veteran-owned small businesses listed in VA's Vendor Information Pages (VIP) database can bid.
- FY27 NRM - EHRM Base 630-22-700 EHRM Infrastructure Upgrades - Manhattan VAMCThe Department of Veterans Affairs (VA) is asking construction firms to show interest in infrastructure upgrades for its electronic health record system at the Margaret Cochran…