Solicitation
Replace DSN-HDD Generator for 78th Signal Battalion, Camp Zama, Japan.
Department of Defense · Department of the Air Force
AI summaryThe Air Force contracting office 374 CONS PK, for the 78th Signal Battalion, wants a business to remove and dispose of an unserviceable 150 kilovolt-ampere (kVA) emergency diesel generator and install a new one at Building 121, Camp Zama, Japan. It is one firm-fixed-price lot (one set price, whatever the work ends up costing) with a minimum 2-year warranty, and all work is in Japan. No set-aside is used. The response due date is November 17, 2026, 2:00 PM (an amendment moved it to Nov 10, 2026, 2:00 PM JST · 12:00 AM Eastern) JST on SAM.gov, but Amendment 0001 says November 10, 2026. More in the summary
A newer version of this notice was posted Oct 19, 2026. It moves the due date from Nov 17, 2026 to Nov 10, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of the version posted Oct 18, 2026. The notice was amended Oct 19, 2026. The due date moved from Nov 17, 2026 to Nov 10, 2026. Check what else changed on SAM.gov.
The Air Force contracting office 374 CONS PK, for the 78th Signal Battalion, wants a business to remove and dispose of an unserviceable 150 kilovolt-ampere (kVA) emergency diesel generator and install a new one at Building 121, Camp Zama, Japan. It is one firm-fixed-price lot (one set price, whatever the work ends up costing) with a minimum 2-year warranty, and all work is in Japan. No set-aside is used. The response due date is November 17, 2026, 2:00 PM JST on SAM.gov, but Amendment 0001 says November 10, 2026.
Who can bid (6)
- No set-aside: open to any business, large or small
- Employees (yours or your subcontractors') must hold current Japanese electrical licenses and certifications for the whole contract, and verifiable evidence goes in with the quote
- If you are not physically located in Japan, an established partnership with a local authorized service provider in Japan that can do the on-site installation, removal, disposal and warranty work
Show all 6Show fewer
- Employees with demonstrated experience in work like this requirement
- Active SAM.gov registration with representations and certifications completed
- The generator must be a U.S.-made, qualifying country or designated country end product under the Trade Agreements Act (TAA: a law limiting which countries' products the Government buys)
How to submit: Email Word, Excel or PDF files (no zip files) to hiroko.takahashi.jp@us.af.mil and kaori.kanematsu.jp@us.af.mil; the Government confirms receipt by email reply, due November 17, 2026, 2:00 PM JST (SAM.gov); Amendment 0001 and the amended SF 1449 say November 10, 2026, 2:00 PM. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (12)
- Serious: Response due date: November 17 or November 10, 2026. SAM.gov shows November 17, 2026, 2:00 PM JST, but Amendment 0001 and the amended SF 1449 say November 10, 2026, 2:00 PM; ask the contracting officer which governs.
- Serious: Local partner in Japan required if you are based elsewhere. A quote from a business not located in Japan without proof of a local service partner is rated technically unacceptable and not considered for award.
- Serious: Japanese electrical licenses needed for all employees on the job. Staff need Japanese licenses and certifications for the whole contract; missing or unverifiable evidence at quote time can make the offer technically unacceptable.
Show all 12Show fewer
- Worth checking: License lists and timing differ between documents. The notice lists four certifications (Special Electric Officer, Chief Electrical Engineer Class I, II or III, Fire Defense Equipment Officer, Low-Voltage Electrical Worker Special Education). SOW paragraph 10.4 lists three different ones, and says copies are due before award, not with the quote. Ask the contracting officer.
- Worth checking: Check the generator works with the existing transfer switch before quoting. The SOW puts the compatibility check on the bidder before the quote is sent, and the price is fixed.
- Worth checking: Generator must come from a Trade Agreements Act country. Only U.S.-made, qualifying country or designated country products are considered, which limits which generator brands you can offer.
- Worth checking: U.S. vendors tracked in SPOT under Japan clause. A U.S. awardee must account for its personnel and dependents in SPOT to be covered by the Status of Forces Agreement, which adds paperwork after award.
- Minor: The site visit was Oct 7, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered.
- Minor: Price includes Japanese taxes except those exempt under the Status of Forces Agreement. Your fixed price must cover all applicable taxes and duties except the ones the U.S. and Japan agreed do not apply; the notice does not say which currency quotes use.
- Minor: Panel names for the transfer switch differ. The notice says Panel P-M/L-M, SOW paragraph 5.1 says Panel P-M, and paragraph 6.1 says Panel L-M, so confirm which panel holds the switch.
- Minor: Award date stated before the response due date. The notice says award is expected around October 30, 2026, while the response due date is in November; ask the contracting officer.
- Minor: Advance notice and bilingual paperwork after award. The construction schedule and any power outage requests go in 30 business days ahead, and final reports and manuals must be in English and Japanese.
Read from the notice and 4 attachments. Show which files.
- Solicitation Amendment FA520926Q00770001 SF 30.pdf (read)
- Solicitation Amendment - FA520926Q00770001.pdf (read)
- Solicitation - FA520926Q0077.pdf (read)
- SOW 24 Aug Clear Copy.pdf (read)
Full summary
What they want
- Disconnect, remove and demolish the old generator (Toyo Denki Seizo / TYND-215), and dispose of it and its fuel, coolant, oil and batteries off-base under Japanese rules, with disposal receipts and photos
- Supply and install a new diesel generator: 150 kVA / 120 kW, 208/120 VAC, 50 Hz, 3-phase 4-wire plus ground, with a water jacket heater, a local output breaker and voltage and amperage meters
- Connect it to the existing automatic transfer switch (ATS: the switch that moves the building onto generator power) and the existing diesel fuel tank; existing wires, exhaust piping and ducts may be reused if they pass inspection
- Meet performance limits: start and accept the full emergency load within 10 seconds, hold frequency at 49.5 to 50.5 Hz and voltage within plus or minus 5 percent
- Test and commission, including a minimum 8-hour load test using site loads; a draft test and commissioning plan goes to the Government Representative (GR) 30 days before final acceptance
- Train 78th Signal Battalion and DoD personnel on operating and maintaining the generator
- Deliver three sets of reports, as-built drawings, manuals and warranty documents in English and Japanese within 15 calendar days after the work is completed
- Provide a minimum 2-year warranty covering parts and labor, with on-site repair or replacement at off-post locations in Japan
- Contract type
- Firm-fixed-price (FFP: one set price, whatever the work ends up costing); one lot, CLIN 0001 (contract line item number: one priced line of the order); commercial products and services (FAR Part 12) request for quotes
- Period of performance
- The SF 1449 delivery schedule reads 1 Calendar Year with a start of Date of Award Receipt, for 1 Lot; plus a minimum 2-year warranty. The notice says award is expected around October 30, 2026 (subject to change).
- Place of performance
- Building 121, Camp Zama, Japan (SAM.gov: Zama, JP-14, Japan); warranty service at off-post locations in Japan
- Estimated value
- Not stated
- How they'll choose
- Lowest total evaluated price (TEP) among quotes whose new generator passes a pass/fail technical check; the Government may do a price realism review (a check that the price is not unrealistically low)
- Offers due
- November 17, 2026, 2:00 PM JST (SAM.gov); Amendment 0001 and the amended SF 1449 say November 10, 2026, 2:00 PM (from the version posted Oct 18, 2026; amended since)
- How to submit
- Email Word, Excel or PDF files (no zip files) to hiroko.takahashi.jp@us.af.mil and kaori.kanematsu.jp@us.af.mil; the Government confirms receipt by email reply
What they'll judge offers on
- Price: award to the lowest Total Evaluated Price for CLIN 0001
- New Generator Acceptability (pass/fail): the proposed new generator must meet every requirement in paragraph 3 of the statement of work (SOW: the document describing the work)
What to include when you submit
- Complete and sign Standard Form 1449 (SF 1449: the form you sign and return as your offer), blocks 12, 17a, 30a, 30b and 30c, which accepts the contract terms as written
- Enter unit price and extended amount for CLIN 0001 in the SF 1449 schedule (blocks 19 to 24); the math must be correct
- Send the make, model, specifications and catalog cut (manufacturer data sheet) of the new generator
- Send copies of the licenses required by paragraph 10.4 of the SOW; without them the quoter may not be found responsible and may be ineligible for award
- If your business is not physically located in Japan, send a document showing an established partnership with a local authorized service provider in Japan, with its name, address, responsible person's name, email and phone
- Complete the representations and certifications at SAM.gov; any provision not completed there must be sent with the quote
- Acknowledge all solicitation amendments, including Amendment 0001
- Identify any exception to the solicitation terms and give the reason
- Hold your prices firm for 60 calendar days from the date specified for receipt of offers
- Confirm before quoting that the proposed generator works with the existing ATS (the SOW makes the contractor responsible for pre-proposal surveys)
After award, you must have
- A U.S. vendor's contract will include a clause requiring contractor personnel and dependents to be tracked in the Synchronized Predeployment and Operational Tracker (SPOT: a Department of Defense personnel tracking system) to be covered by the Status of Forces Agreement From the notice:
…resulting contract will include DFARS clause 252.225-7976, Contractor Personnel Performing in Japan…
Not in the notice text
- The currency for quotes and any exchange-rate terms are not stated.
- The Government's estimate or budget for this work is not stated.
- Which due date applies, November 17 or November 10, 2026, is not settled; ask the contracting officer.
- The SOW refers to site survey files, as-built drawings and tank drawings that are not in the text read; ask the contracting officer for them.
- The calendar-year completion period on the SF 1449 does not say when the install must be finished or how it relates to the 2-year warranty.
Eligibility and how to respond
- No set-aside: any business, large or small, can bid unless the notice says otherwise.
- How to submit, from the AI summary: Email Word, Excel or PDF files (no zip files) to hiroko.takahashi.jp@us.af.mil and kaori.kanematsu.jp@us.af.mil; the Government confirms receipt by email reply. Check it in the notice before you send anything.
Notice details
- Posted
- Oct 18, 2026
- Notice type
- Solicitation
- Office
- FA5209 374 CONS PK
- Product/service code
- 6115 · Generators and Generator Sets, Electrical
- Business type
- Electronic parts & equipment (supplies) (FedReady's grouping, from NAICS 335312)
- Versions
3 versions have been posted, newest first.
- Oct 19, 2026 · Amendment 0002Due Nov 10, 2026 (changed)
- Oct 18, 2026 · Amendment 0001 (this version)Due Nov 17, 2026 (changed)
- Sep 8, 2026 · SolicitationDue Oct 19, 2026
- Attachments
Past awards and competition
Who has won work like this before, the likely incumbent, and what similar contracts paid, from USAspending.gov.
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- Generator, Alternati, in Repair/Modification ofNAVSUP Weapon Systems Support (Department of the Navy) has posted a solicitation to repair an alternating-current generator (title: 61--GENERATOR,ALTERNATI, IN…
- Stator Assembly, GenThe Defense Logistics Agency (DLA) Aviation office in Philadelphia wants a generator stator assembly.
- Brake, ElectricThe Defense Logistics Agency (DLA), Aviation office in Philadelphia, is buying electric brakes (a Federal Supply Class 61 item) under a request for proposal.
- Synchro, Control TransfDefense Logistics Agency (DLA) Weapons Support wants quotes on QTY 46, unit of issue EA (each), of SYNCHRO,CONTROL TRANSF, national stock number (NSN) 5990009285593.
- Power DistributionThe Defense Logistics Agency in Mechanicsburg, PA wants to buy a manufactured part called POWER DISTRIBUTION, built to a Government drawing (drawing 53711, CAGE 8328922).