Solicitation
537-24-106 Create Contractor Lie-Down Zone
Department of Veterans Affairs
AI summary says SDVOSB set-aside · IL
AI summary Beta
This summary may miss requirements: 6 of 18 attachments weren't read (S04 - Site Visit Sign-In Sheet.pdf, S02 - 852.219-75.docx and 4 more). Check the attachments on SAM.gov.
Solicitation 36C25226B0030: the solicitation text says only certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) can bid, but SAM.gov lists no set-aside. The Department of Veterans Affairs wants a contractor laydown area and security upgrades built at Jesse Brown VA Medical Center in Chicago, Illinois. Work includes site prep, eight shipping-container units, fencing, power and cameras, finished within 295 calendar days after notice to proceed. The response due date is January 14, 2027, 10:00 AM Central (Amendment 0008). A bid guarantee is required.
Who can bid (6)
- Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside: the bidder must be a certified SDVOSB and a small business under NAICS 236220 ($45M size standard) From 36C25226B0030_1.docx
- Listed as SDVOSB certified in the SBA Small Business Search database From 36C25226B0030_1.docx
- Bid guarantee (SF 24) of at least 20 percent of the bid price, up to $2,000,000, with the bid From 36C25226B0030_1.docx
Show all 6Show fewer
- Limitations on subcontracting: for general construction, no more than 85 percent of the amount paid, excluding materials, may go to firms that are not certified SDVOSBs From 36C25226B0030_1.docx
- Safety and environmental record certification (OSHA and EPA violation limits) From 36C25226B0030_1.docx
- Electrical work on systems of 50 volts or more by a State Licensed Master Electrician or Registered Journeyman Electrician From S02 - SOW.pdf
How to submit: Email to both the Contract Specialist (Misty.Gates1@va.gov) and the Contracting Officer (Stacy.Hoover2@va.gov); no hard copy needed. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (10)
From the version posted Nov 17, 2026.
- Serious: Service-Disabled Veteran-Owned set-aside, but SAM.gov shows none. The solicitation limits bids to certified SDVOSB firms while SAM.gov says the set-aside is not stated; ask the contracting officer which governs. From 36C25226B0030_1.docx
- Serious: Bid guarantee required with the bid. A bid bond of at least 20 percent of the bid price, up to $2,000,000, must arrive by bid opening or the bid is rejected in most cases. From 36C25226B0030_1.docx
- Serious: Limit on subcontracting. A certified SDVOSB prime must keep at least 15 percent of the amount paid, excluding materials, for itself or other certified SDVOSBs. From 36C25226B0030_1.docx
Show all 10Show fewer
- Worth checking: Bid responsiveness items that can sink a bid. A missing VAAR 852.219-75 certificate makes the bid non-responsive and ineligible for award. From 36C25226B0030_1.docx
- Worth checking: Safety record and EMR review before award. Bidders must send OSHA and EPA violation history and an EMR letter; these feed the responsibility decision. From 36C25226B0030_1.docx
- Worth checking: Brand-name security cameras and certified distributor. Cameras must work with the VA's Avigilon system and be installed by a certified Avigilon distributor, so most bidders need a partner. From S02 - SOW.pdf
- Worth checking: Working in an active hospital campus. Roadways are shared with patients and staff, deliveries should be off hours, and there is no on-site office or parking. From 36C25226B0030_1.docx
- Worth checking: Wage rates not read. Construction wage rates are attached but were not read here; check the Davis-Bacon rates on SAM.gov before pricing. From 36C25226B0030_1.docx
- Minor: The site visit was Aug 19, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From 36C25226B0030_1.docx
- Minor: Questions were due Aug 24, 2026. Check the amendments for the agency's answers. From 36C25226B0030_1.docx
Read from the notice and 12 attachments. 6 of 18 not read. Show which files.
- 36C25226B0030 0008.docx (read)
- 36C25226B0030 0007.docx (read)
- 36C25226B0030 0006.docx (read)
- 36C25226B0030 0005.docx (read)
- 36C25226B0030 0004.docx (read)
- 36C25226B0030 0003.docx (read)
- 36C25226B0030 0002.docx (read)
- 36C25226B0030 0001.docx (read)
- 36C25226B0030_1.docx (read)
- S02 - Specifications.pdf (read)
- S02 - SOW.pdf (read)
- S02 - DF Brand Name_Executed.pdf (read)
- S04 - Site Visit Sign-In Sheet.pdf: not summarized: open it on SAM.gov
- S02 - 852.219-75.docx: not summarized: open it on SAM.gov
- S02 - SOW - Photos.pdf: not summarized: open it on SAM.gov
- S02 - Wage Rates - Landscape.pdf: not summarized: open it on SAM.gov
- S02 - Wage Rates.pdf: not summarized: open it on SAM.gov
- S02 - Drawing.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Prepare the ground: mark underground utilities, clear the plot, have a licensed geotechnical engineer set footings, add gravel grid fill
- Furnish and install eight new 20-foot containers (four storage, four office), double stacked, with footings, stairs, windows, doors and paint
- Install a 7-foot chain link fence and a 20-foot sliding gate around the zone
- Install a 200A breaker panel, four energy meters, outlets, lights and flood lights, and feed power to each container stack
- Rebuild the sidewalk and curb as a ramp for vehicle access to the gated zone
- Install security cameras that connect to the VA's existing Avigilon system, with a camera plan approved by the VA and VA Police
- Submit schedules, a schedule of values, shop drawings, daily production reports, red-line drawings and closeout documents on the Notice to Proceed (NTP) timeline
- Join weekly Microsoft Teams progress meetings and give a one-year parts and labor warranty
- Contract type
- Firm-fixed-price (FFP: one set price, whatever the work ends up costing), one all-inclusive bid line; single award on the base bid
- Period of performance
- 295 calendar days after receipt of the notice to proceed (NTP), from kick-off submittals through closeout; the SOW (statement of work) allots 14 days for each VA review
- Place of performance
- Jesse Brown VA Medical Center, 820 S. Damen Ave, Chicago, IL 60612 (Building 1A, Eastern Exterior Grounds)
- Estimated value
- Project magnitude between $1,000,000.00 and $2,000,000.00, per the solicitation (a range, not a Government estimate)
- How they'll choose
- Sealed-bid style: award to the responsible bidder with the lowest priced responsive bid
- Offers due
- January 14, 2027, 10:00 AM Central
- How to submit
- Email to both the Contract Specialist (Misty.Gates1@va.gov) and the Contracting Officer (Stacy.Hoover2@va.gov); no hard copy needed
What they'll judge offers on
- Price: all-inclusive bid for CLIN (contract line item number: one priced line of the order) 0001
- Responsiveness: complete bid with bid guarantee and the VAAR 852.219-75 limitations on subcontracting certificate
- Responsibility: safety and environmental record and Experience Modification Rate (EMR: an insurer's workers' compensation rating)
What to include when you submit
- Include the bid guarantee on Standard Form 24 (SF 24) with the bid: at least 20 percent of the bid price, up to $2,000,000
- Include the completed VAAR 852.219-75 limitations on subcontracting certificate of compliance, or the bid is non-responsive
- Fill in CLIN 0001, the all-inclusive bid price, and complete the SF 1442 offer pages and contractor information block
- Send a safety and environmental record certification: no more than three serious, one repeat or one willful OSHA violation, or any EPA violation, in three years; otherwise explain
- Send your current EMR on the insurance carrier's letterhead; if it is above 1.0, add the carrier's written explanation
- Complete the Pre-Award Contractor Safety and Environmental Record Evaluation Form and attach OSHA 300 and 300A forms
- If bidding as a joint venture, include a copy of the joint-venture agreement
- Acknowledge every amendment, and use the current SF 24, SF 25 and SF 25A bond forms
- Send the bid at least one hour before the opening time to avoid email delays (strongly recommended)
After award, you must have
- Payment bond (SF 25A) and performance bond (SF 25), each equal to the awarded contract value, from the awarded bidder From 36C25226B0030_1.docx:
The bidder to whom a contract is awarded will be required to furnish a Payment Bond, on form SF25A, and a Performance Bond, on form SF25.
- Licensed Geotechnical Engineer hired by the general contractor to assess soil and set footings From S02 - SOW.pdf:
…c. A licensed Geotechnical Engineer (hired by the General Contractor) shall assess…
- Cameras installed and integrated by a certified Avigilon distributor From S02 - SOW.pdf:
Damen Dispatch by a certified Avigilon Distributor.
Current contractor
No incumbent is named. A justification for other than full competition covers only the camera system: Avigilon-compatible equipment, with a Government estimate of about $4,500 for those items, while the overall job is competed as an SDVOSB set-aside.
Not in the notice text
- Part of the solicitation form and most of the specifications are attached but were not read; wage rates, drawing, photos and the VAAR 852.219-75 form were attached but not read, and the site visit sign-in sheet is a scan.
- The SAM.gov set-aside is not stated, while the solicitation text says SDVOSB; the contracting officer must confirm.
- Whether the bid opening is still held at 10:00 AM CT: the original text gave bids due 9:00 AM CT and the opening at 10:00 AM CT, while Amendment 0008 gives 10:00 AM CT.
- The current wage determination and Davis-Bacon rates: wage rate files were not read.
- Whether a questions deadline applies after the date change is not restated.
More to check before you bid
- The notice names requirements:
- The AI summary says this is set aside for service-disabled veteran-owned small businesses (SDVOSBs), but SAM.gov lists no set-aside. Check the notice before you bid.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 17, 2026
- Notice type
- Solicitation
- Office
- 252-Network Contract Office 12 (36C252), Milwaukee, WI
- Product/service code
- Z2DA · Repair or Alteration of Hospitals and Infirmaries
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
10 versions have been posted, newest first.
- Nov 17, 2026 · Amendment 0008 (this version)Due Jan 14, 2027 (changed)
- Oct 21, 2026 · AmendmentDue Nov 20, 2026 (changed)
- Oct 5, 2026 · AmendmentDue Oct 28, 2026 (changed)
- Sep 24, 2026 · AmendmentDue Oct 7, 2026 (changed)
- Sep 15, 2026 · AmendmentDue Sep 25, 2026
- Sep 14, 2026 · AmendmentDue Sep 25, 2026 (changed)
- Sep 4, 2026 · AmendmentDue Sep 15, 2026 (changed)
- Aug 20, 2026 · AmendmentDue Sep 8, 2026
- Aug 10, 2026 · AmendmentDue Sep 8, 2026 (changed)
- Aug 6, 2026 · SolicitationDue Sep 7, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- General Contractor for the Seismic Retrofit Project at the Clemente Ruiz Nazario U.S. Courthouse, San Juan, Puerto RicoTwo-phase buy: Phase I asks firms for technical qualifications (experience and past performance); only firms selected go on to Phase II, which covers operating strategy,…