Solicitation
NGWSP Cutter Lateral Reach 21 Booster Plant
Department of the Interior · Bureau of Reclamation
Small business set-aside · NM
A newer version of this notice was posted Nov 16, 2026. See the latest version.
AI summary Beta
Summary of the version posted Nov 4, 2026. The notice was amended Nov 16, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 2 of 10 attachments weren't read (Reach_21_Booster_Site_Visit_meet_up_location_change_4Nov26_0001.pdf, Attachment_2_-_00_00_02_100__DRAWINGS_34x22_20261027_rev_Final_97_pg.pdf). Check the attachments on SAM.gov.
The Bureau of Reclamation (Upper Colorado Regional Office) wants a small business to build the Cutter Lateral Reach 21 booster pumping plant, part of the Navajo-Gallup Water Supply Project, in San Juan County, New Mexico. Solicitation 140RR027B0004 is a sealed bid, so the lowest-priced responsible bidder wins. Work runs April 5, 2027 to May 22, 2028, the notice sizes the project at $10,000,000 to $25,000,000, and the response due date is January 25, 2027, 10:00 AM Mountain, with a bid guarantee due by then.
Who can bid
- Small business, under the total small business set-aside for NAICS 237110
- Bid guarantee (20 percent of the bid price or $2 million, whichever is less) in an accepted form, furnished by the time bids are opened From 140RR027B0004_R21_CL_Booster_Plant_solicitation_4Nov26_0001.pdf
- Active registration in the System for Award Management (SAM) From 140RR027B0004_R21_CL_Booster_Plant_solicitation_4Nov26_0001.pdf
How to submit: Email to Philoma Singer (philoma_singer@ios.doi.gov), or mail or hand delivery to Bureau of Reclamation, Four Corners Construction Office, 1235 La Plata Highway, Farmington, NM 87401. Bids are opened there, or on Microsoft Teams if not held in person.. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (10)
- Serious: Bid guarantee due with the bid. A bid bond or similar security of 20 percent of the bid price, up to $2 million, must be in place by bid opening, or the bid may be rejected. From 140RR027B0004_R21_CL_Booster_Plant_solicitation_4Nov26_0001.pdf
- Worth checking: All 64 priced lines on both schedules. Each contract line item number (CLIN) is one priced line of the order. A bid on only part of the price schedules is not considered, so the whole job must be priced. From Attachment_1_-_00_00_01A_Specifications_DZ_Booster_06162026_Final_654_pg.pdf
- Worth checking: The site visit was Nov 12, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From Sol_140RR027B0004_Amd_0001.pdf
Show all 10Show fewer
- Worth checking: Davis-Bacon wage rates apply. Davis-Bacon is the Department of Labor's minimum pay rule for construction workers. Wage determinations for Heavy and Building work in San Juan County are attached, so labor costs must meet them.
- Worth checking: Full-time survey, safety and quality control staff. The price must cover a full-time survey crew under a licensed surveyor, plus full-time safety and quality control representatives. Missing survey data has held up payments on past Reclamation jobs. From Sol_140RR027B0004.pdf
- Worth checking: New Mexico and Navajo Nation taxes. Gross receipts taxes may apply. They are reimbursed at the actual rate, but only with tax receipts, and are kept out of the total bid price. From 140RR027B0004_R21_CL_Booster_Plant_solicitation_4Nov26_0001.pdf
- Worth checking: Indian preference clauses listed. The contents list two Indian preference sections (H.5 and H.6). Their text was not read here, so check how they affect hiring or subcontracting. From 140RR027B0004_R21_CL_Booster_Plant_solicitation_4Nov26_0001.pdf
- Worth checking: Strict environmental compliance. Reclamation expects a dedicated team that knows the Clean Water Act and storm water pollution prevention plan (SWPPP) rules. Fixes for missed items come at no added cost. From 140RR027B0004_R21_CL_Booster_Plant_solicitation_4Nov26_0001.pdf
- Minor: Buy American rules for construction materials. The Buy American construction materials clause is in the contract, so material sourcing must be checked before pricing. From 140RR027B0004_R21_CL_Booster_Plant_solicitation_4Nov26_0001.pdf
- Minor: Protected species can pause work. Possible stop-work delays for protected species must be priced into the bid. Time or cost may be adjusted only if no other work area is available. From 140RR027B0004_R21_CL_Booster_Plant_solicitation_4Nov26_0001.pdf
Read from the notice and 8 attachments. 2 of 10 not read. Show which files.
- 140RR027B0004_R21_CL_Booster_Plant_solicitation_4Nov26_0001.pdf (read)
- 140R4027B0004_NGWSP_R21_CL_Booster_Plant_solicitation_2Nov26.pdf (read)
- Sol_140RR027B0004_Amd_0001.pdf (read)
- Sol_140RR027B0004.pdf (read)
- Attachment_1_-_00_00_01A_Specifications_DZ_Booster_06162026_Final_654_pg.pdf (read)
- Attachment_5_-_Construction_Contract_Administration.pdf (read)
- Attachment_3_-_NM20260040_Heavy_-_wage_determination_-_4_pages.pdf (read)
- Attachment_4_-_NM20260046_Building_-_wage_determination_-_4_pages.pdf (read)
- Reach_21_Booster_Site_Visit_meet_up_location_change_4Nov26_0001.pdf: not read (it couldn't be opened): open it on SAM.gov
- Attachment_2_-_00_00_02_100__DRAWINGS_34x22_20261027_rev_Final_97_pg.pdf: not read (it couldn't be opened): open it on SAM.gov
Full summary
What they want
- Build a pre-engineered concrete booster pump station with a concrete foundation pad, pipe encasement, yard pipe, fencing, electrical equipment, gravel surfacing and pipe connections (Price Schedule A).
- Install a secondary regulation tank at the Regulation Tank No. 3 site, with foundation, electrical equipment, yard pipe and pipe connections (Price Schedule B).
- Do erosion and scour work: a retaining wall, swale, runoff channel and site regrading, plus gravel surfacing at the Regulation Tank No. 3 site.
- Install supervisory control and data acquisition (SCADA) equipment, a radio communications system, and corrosion and cathodic protection systems.
- Test and commission the pump station and tanks, then deliver as-built and final drawings and operations and maintenance (O&M) manuals.
- Provide full-time safety, quality control and survey staff, with survey work directed by a licensed land surveyor.
- Control stormwater and other environmental impacts during construction, and halt work if protected species are found.
- Contract type
- Firm-fixed-price (FFP): one set price, whatever the work ends up costing. Sealed bid (invitation for bids) with lump-sum and estimated-quantity lines.
- Period of performance
- April 5, 2027 to May 22, 2028, as listed in the solicitation and amendment
- Place of performance
- About 26 miles south of Bloomfield, NM, off County Road 7575 near U.S. Highway 550, at the base of Huerfano Mesa in San Juan County, New Mexico
- Estimated value
- Between $10,000,000 and $25,000,000 (the notice's stated magnitude of the project)
- How they'll choose
- Sealed bid: award to the lowest-priced bid among responsible bidders that follow the solicitation and present proof of the bid guarantee
- Offers due
- January 25, 2027, 10:00 AM Mountain (from the version posted Nov 4, 2026; amended since)
- How to submit
- Email to Philoma Singer (philoma_singer@ios.doi.gov), or mail or hand delivery to Bureau of Reclamation, Four Corners Construction Office, 1235 La Plata Highway, Farmington, NM 87401. Bids are opened there, or on Microsoft Teams if not held in person.
What they'll judge offers on
- Price: lowest total bid price (lines 1 through 64, without Navajo Nation or New Mexico gross receipts tax amounts), checked for balanced pricing and for a fair and reasonable price
What to include when you submit
- Price every line, CLIN 1 through 64, on both Price Schedule A (prefabricated booster pump plant) and Price Schedule B (Regulating Tank 3). No offer is considered on only part of the schedules.
- Send a bid guarantee with the bid: 20 percent of the bid price or $2 million, whichever is less. Allowed forms are a bid bond, postal money order, certified check, cashier's check, irrevocable letter of credit, or certain U.S. Treasury bonds or notes.
- Show New Mexico Gross Receipts Tax and Navajo Nation tax as estimates. They are left out of the total bid price read at bid opening and are reimbursed later with proof of payment.
- Submit the bid under section 13(a) of Standard Form 1442 (SF 1442), the construction solicitation, offer and award form. The bidder must confirm the bid arrived by the response due date and time.
- Acknowledge Amendment 0001 before the response due date, by one of the ways the amendment lists.
- The contracting officer estimates the mobilization and preparatory work line should not exceed 5 percent of the total offered price.
- Subcontractors cannot send partial proposals to the Government. They propose to prime contractors.
After award, you must have
- Full-time survey support under a registered professional land surveyor licensed in New Mexico, where the work is done From 140RR027B0004_R21_CL_Booster_Plant_solicitation_4Nov26_0001.pdf:
The Contractor is expected to provide fulltime survey support…
Not in the notice text
- The middle of both posted solicitation PDFs (Sections B through K, with the contract clauses), most of the 654-page specifications, the 97-page drawings and a site visit meet-up change file are attached on SAM.gov but were not fully read here. Check them there.
- Whether performance and payment bonds are required after award, how many days the contractor has to finish after notice to proceed, and the liquidated damages rate are not shown in the text read; check SF 1442 and Section F on SAM.gov.
- The deadline for questions is not given in the text read; ask the contract specialist.
- Whether the site visit is required is not stated; the text calls it an organized site visit and asks bidders to contact Philoma Singer to be added to the attendee list.
- The effect of the Indian preference clauses (H.5 and H.6) on hiring and subcontracting is in the full contract text, which was not read.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 4, 2026
- Notice type
- Solicitation
- Office
- Upper Colorado Regional Office, Salt Lake City, UT
- Product/service code
- Y1KZ · Construction of Other Conservation and Development Facilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237110)
- Versions
3 versions have been posted, newest first.
- Nov 16, 2026 · Amendment 0002Due Jan 25, 2027
- Nov 4, 2026 · Amendment 0001 (this version)Due Jan 25, 2027
- Nov 2, 2026 · SolicitationDue Jan 25, 2027
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant UpgradesSolicitation 6973GH-27-R-00005 is a total small business set-aside: only small businesses can bid.
- Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP)The Army Corps of Engineers (Louisville District) wants a contractor to demolish and build a wastewater treatment plant (WWTP) at Rough River Lake.
- Design-Bid-Build (DBB) Phase III Groundwater Treatment Plant Construction, Nwirp Bethpage, Wantagh, New YorkThe Navy (NAVFAC Mid-Atlantic) plans to issue Request for Proposals (RFP) N4008527R0048 for a design-bid-build groundwater treatment plant at the former Naval Weapons Industrial…
- USACE SPK DBB Construction - Calaveras Wastewater Treatment Plant Improvements - Copperopolis, CAThe Army Corps of Engineers Sacramento District is asking contractors whether they can build upgrades to the Copper Cove Wastewater Treatment Plant in Copperopolis, CA, for the…
- P210 Electric Power Plant and Electrical Distribution System at Chabelley Airfield, DjiboutiPresolicitation N6247027R0001 (also written N62470-27-R-0001): the Navy's NAVFAC Atlantic plans a full and open request for proposals (RFP) for a firm-fixed-price (FFP: one set…