Solicitation
Mora-Adm New Camp Muir Guide BLDGS
Department of the Interior · National Park Service
Small business set-aside · WA
A newer version of this notice was posted Nov 18, 2026. See the latest version.
AI summary Beta
Summary of the version posted Nov 5, 2026. The notice was amended Nov 18, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 6 of 18 attachments weren't read (B08_Attachment_6_LmtOnSubconRpt.xlsx, B08_Attachment_10_Camp_Muir_Asbestos_Report.pdf and 4 more). Check the attachments on SAM.gov.
The National Park Service (NPS) wants a small business to tear down an old modular building at Camp Muir in Mount Rainier National Park, Washington, and build two new climbing shelters (solicitation 140PP027R0015). The job is one firm-fixed-price (FFP: one set price, whatever the work costs) lump sum, with a response due date of December 10, 2026, 12:00 PM Pacific. The site sits at 10,080 feet and is reached on foot or by helicopter, and the bidder pays for all flights.
Who can bid (4)
- Small business: this is a total small business set-aside
- Ability to get a bid bond (bid guarantee) and performance and payment bonds; the Government reviews this From Sol_140PP027R0015.pdf
- When using more than one subcontractor, the site superintendent must be a payroll (W-2) employee of the prime contractor From Sol_140PP027R0015_Amd_0001.pdf
Show all 4Show fewer
- Prime must show its own relevant project history; a subcontractor's experience does not count as the prime's From Sol_140PP027R0015_Amd_0001.pdf
Things to watch (10)
- Serious: Small business set-aside. Only small businesses can win this job; large firms cannot bid as the prime.
- Serious: Remote high-altitude site with helicopter costs on the bidder. The site is at 10,080 feet, reached by a long walk over snow, and the bidder must price all helicopter flights and crew management. From B08_Attachment_9_Site_Visit_Transcript.pdf
- Serious: Bid bond and project bonds. A bid guarantee and performance and payment bonds are part of the package; a firm that cannot get bonding may be rejected. From Sol_140PP027R0015.pdf
Show all 10Show fewer
- Worth checking: Helicopter flights are limited. A bidder asked about the specifications' assumed nine helicopter days, and NPS said it is concerned about aviation flights and treats the number as firm, so plan fewer lifts. From B08_Attachment_9_Site_Visit_Transcript.pdf
- Worth checking: Prime must have its own project history. A firm with no similar projects of its own cannot borrow a subcontractor's record for the experience factor. From Sol_140PP027R0015_Amd_0001.pdf
- Worth checking: Weed-free certification for imported materials. Rock and other materials need weed-free certification, with inspection time and heat treatment if a source is not certified; NPS said other sites may be considered. From B08_Attachment_13_Camp_Muir_Environmental_Commitments.pdf
- Worth checking: No night work and wildlife limits. Night construction is banned and flights and equipment noise are restricted, which limits crew scheduling. From B08_Attachment_13_Camp_Muir_Environmental_Commitments.pdf
- Worth checking: Key documents not read. The drawings, construction report, quarry survey, asbestos report, past performance questionnaire and subcontracting limit report were not read; check them on SAM.gov.
- Minor: The pre-proposal meeting was May 15, 2026. Check the amendments for slides, answers or an attendee list, and whether taking part was required.
- Minor: Notice to proceed date corrected. Amendment 0001 says the September 1, 2026 notice to proceed in the schedule is an error and gives an estimate of February 1, 2027.
Read from the notice and 12 attachments. 6 of 18 not read. Show which files.
- Sol_140PP027R0015_Amd_0001.pdf (read)
- Sol_140PP027R0015.pdf (read)
- B08_Attachment_1_Specifications.pdf (read)
- B08_Attachment_9_Site_Visit_Transcript.pdf (read)
- B08_Attachment_16_Specificaton_Comments_.pdf (read)
- B08_Attachment_13_Camp_Muir_Environmental_Commitments_1.pdf (read)
- B08_Attachment_11_RFI_Responses.pdf (read)
- B08_Attachment_13_Camp_Muir_Environmental_Commitments.pdf (read)
- B08_Attachment_14_Camp_Muir_-_Gabion_Memo.pdf (read)
- B08_Attachment_3_Product_Cut_Sheets.pdf (read)
- B08_Attachment_7_Construction_Contract_Administration.pdf (read)
- B08_Attachment_5_WD_WA20260111_5_18_26.pdf (read)
- B08_Attachment_6_LmtOnSubconRpt.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- B08_Attachment_10_Camp_Muir_Asbestos_Report.pdf: not summarized: open it on SAM.gov
- B08_Attachment_2_Drawings.pdf: not summarized: open it on SAM.gov
- B08_Attachment_15_2026_Quarry_Survey_Summary.pdf: not summarized: open it on SAM.gov
- B08_Attachment_4_Construction_Report.pdf: not summarized: open it on SAM.gov
- B08_Attachment_8_Past_Performance_Questionnaire.docx: not summarized: open it on SAM.gov
Full summary
What they want
- Remove the existing modular building, weather station tower and retaining wall at Camp Muir and dispose of them
- Excavate, stabilize the slope, and install geotextile fabric (a ground-separation fabric) and gabion baskets (wire baskets filled with rock)
- Build two new steel-framed climbing shelters with weather barriers, siding, windows and doors made for harsh weather
- Install electrical conduits for a future photovoltaic (solar power) system
- Build and install bunks, storage shelving and tables inside the shelters
- Fly or carry in all materials and crews, with all aviation costs in the bidder's price
- Meet park rules on weed-free imported materials, wildlife and noise
- Contract type
- Firm-fixed-price (FFP), one lump-sum (LS) line item for the whole project
- Period of performance
- January 15, 2027 to January 14, 2028 (Amendment 0001 sets an estimated notice to proceed of February 1, 2027)
- Place of performance
- Mount Rainier National Park (MORA), Pierce County, Washington (Camp Muir; park address Ashford, WA)
- Estimated value
- The solicitation gives an estimated magnitude (price range) of between $1,000,000 and $5,000,000
- How they'll choose
- Best value: the Government may pay more than the lowest price when the benefits are worth it. Non-price factors combined equal price in weight.
- Offers due
- December 10, 2026, 12:00 PM Pacific (from the version posted Nov 5, 2026; amended since)
What they'll judge offers on
- Factor 1, Experience and Key Personnel: up to three recent similar projects, a short narrative on managing subcontractors, and the project manager, superintendent, safety specialist and quality control staff
- Factor 2, Technical Approach and Schedule: construction schedule with critical path, procurement lead time, staging and risk steps
- Factor 3, Past Performance: how well the firm did on recent similar work, from surveys and government databases
- Price: checked for fairness, reasonableness and unbalanced line items (not rated)
What to include when you submit
- Volume I (non-price): Factor 1 experience with no more than three recent relevant projects, each with contract number and title, award and completion dates, customer and contact, scope and magnitude
- Recent means ongoing or completed within five years of the solicitation close date
- Include a short written narrative on managing subcontractors, team coordination, scheduling, communication, logistics and quality control (no form is provided)
- Name key personnel: project manager, superintendent, safety specialist and quality control
- Factor 2: send construction schedules and narratives showing the critical path, procurement lead time, trade coordination, on-site storage and staging, and finishing within the performance period
- Factor 3: past performance references; a past performance questionnaire is attached but was not read
- Volume II (business and price): proposal cover letter, completed Standard Form 1442 (SF 1442, the solicitation and offer form), and amendment acknowledgments
- Volume II also holds the Section B price schedule, bid bond, Section K representations and certifications, and the subcontracting percentage worksheet
- Acknowledge Amendment 0001 before the response due date, in one of the ways the amendment lists
- Prime must list its own projects: the prime's firm cannot count a subcontractor's experience as its own
After award, you must have
- Materials brought into the park must be certified weed free before use From B08_Attachment_13_Camp_Muir_Environmental_Commitments.pdf:
Weed free certification. All material sources and materials incorporated into the…
Not in the notice text
- Parts of the solicitation (Sections H, J and L, including how and where to submit, the site visit section, and key personnel and seasonal shutdown terms) were left out of the text read here; check the solicitation on SAM.gov
- The drawings, construction report, quarry survey summary, asbestos report (a scan), past performance questionnaire and subcontracting limit report are attached but were not read
- Whether a site visit is required: the text read does not say; the May 15, 2026 meeting did not go to the site
- How to send the offer (email or portal) and any page limits
- Bond amounts and the bid guarantee percentage
- Davis-Bacon wage determination WA20260111 is attached; its rates were only partly read
- Whether any remote or off-site work is allowed: the documents do not say
Notice details
Notice type, codes, versions and files
- Posted
- Nov 5, 2026
- Notice type
- Solicitation
- Office
- National Park Service Contracting Activity, Denver, CO
- Product/service code
- Y1QA · Construction of Restoration of Real Property (Public or Private)
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
3 versions have been posted, newest first.
- Nov 18, 2026 · Amendment 0002Due Dec 10, 2026
- Nov 5, 2026 · Amendment 0001 (this version)Due Dec 10, 2026
- Nov 3, 2026 · SolicitationDue Dec 10, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Joint Base Lewis McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3221 and 3222The Army Corps of Engineers Seattle District wants construction for Multi Domain Task Force Buildings 3221 and 3222 at Joint Base Lewis McChord in Washington.
- Repair Auto Maintenance Facility Bldg 575 (230040)Only the seven General MACC (multiple award construction contract) holders listed in the RFP can bid on this Camp Lejeune project to repair Auto Maintenance Facility Building 575.
- FY26 MCN P309, School Age Care Centers Replacement, Camp Foster and McTureous, Okinawa, JapanThe U.S. Army (Far East District, Japan office) is asking for sealed bids to build replacement School Age Care Centers on Camp Foster and Camp McTureous in Okinawa, Japan.