Solicitation
Mora-Adm New Camp Muir Guide BLDGS
Department of the Interior · National Park Service
Small business set-aside · WA
AI summary Beta
This summary may miss requirements: 7 of 19 attachments weren't read (B08_Attachment_6_LmtOnSubconRpt.xlsx, B08_Attachment_10_Camp_Muir_Asbestos_Report.pdf and 5 more). Check the attachments on SAM.gov.
Only small businesses can bid on this National Park Service construction job at Camp Muir, high on Mount Rainier in Washington. The work replaces an old modular building with two new steel-framed climbing shelters, plus demolition and site stabilization. Offers are due December 10, 2026, 12:00 PM Pacific for a firm-fixed-price contract (one set price, whatever the work ends up costing), with work from January 15, 2027 to January 14, 2028.
Who can bid (5)
- Total small business set-aside: only small businesses can bid (as listed in the SAM.gov fields; the solicitation text on this point was not read) From SAM.gov's set-aside field
- Bid bond (offer guarantee): the Government reviews the offeror's ability to obtain the appropriate bonding with Volume II; performance and payment bonds are listed in the contract clauses From Sol_140PP027R0015.pdf
- Up to 3 recent relevant projects of the prime, similar in size, scope, complexity and contract type From Sol_140PP027R0015.pdf
Show all 5Show fewer
- Key personnel: project manager, superintendent, safety specialist and quality control person, rated on qualifications, training and experience From Sol_140PP027R0015.pdf
- When more than one subcontractor is used, the site superintendent must be a salaried (W-2) employee of the prime contractor
Things to watch (10)
From the version posted Nov 18, 2026.
- Serious: Total small business set-aside. SAM.gov lists this as a total small business set-aside, so only small businesses can bid; the set-aside wording in the solicitation itself was not read.
- Serious: Bid bond and bonding. Volume II includes a bid bond, and the contract clauses list performance and payment bonds, so you need a surety (bond company) ready before you send your offer. From Sol_140PP027R0015.pdf
- Serious: Remote high-altitude site reached by helicopter or a long climb. Camp Muir is at 10,080 feet and is a long walk over snow from the nearest trail head; crews and materials depend on flights and weather. From B08_Attachment_9_Site_Visit_Transcript.pdf
Show all 10Show fewer
- Serious: Contractor pays for all aircraft support. The park does not supply helicopters or crews; your price must include all aviation costs. The specifications assume 9 helicopter days and the Government calls that a strong number. From B08_Attachment_9_Site_Visit_Transcript.pdf
- Worth checking: Helicopter limits. Amendment 0002 says two helicopters on the same day count as one project flight day but bill as two aircraft days, and total flight hours are still capped by the task order and daily pilot limits.
- Worth checking: Prime must have the project history and a W-2 superintendent. A subcontractor's experience cannot count as the prime's own, and the superintendent must be the prime's salaried employee when several subcontractors work on the job. From Sol_140PP027R0015.pdf
- Worth checking: Start date assumption corrected. Amendment 0001 says the September 1, 2026 notice to proceed in the schedule is an error and the estimated date is February 1, 2027; the period of performance runs from January 15, 2027 to January 14, 2028.
- Worth checking: The site visit was May 15, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From B08_Attachment_9_Site_Visit_Transcript.pdf
- Worth checking: Wilderness and wildlife rules. Environmental commitments limit helibase locations and aircraft types to protect threatened species, and heavy-lift helicopters are restricted; read the environmental commitments before pricing. From B08_Attachment_13_Camp_Muir_Environmental_Commitments_1.pdf
- Minor: Late-night noise and public access. Climbers arrive in the afternoon and start climbing around midnight, so crews need to control noise, and the site must stay open to guided climbing companies and the public. From B08_Attachment_1_Specifications.pdf
Read from the notice and 12 attachments. 7 of 19 not read. Show which files.
- Sol_140PP027R0015_Amd_0002.pdf (read)
- Sol_140PP027R0015_Amd_0001.pdf (read)
- Sol_140PP027R0015.pdf (read)
- B08_Attachment_1_Specifications.pdf (read)
- B08_Attachment_9_Site_Visit_Transcript.pdf (read)
- B08_Attachment_16_Specificaton_Comments_.pdf (read)
- B08_Attachment_13_Camp_Muir_Environmental_Commitments_1.pdf (read)
- B08_Attachment_11_RFI_Responses.pdf (read)
- B08_Attachment_13_Camp_Muir_Environmental_Commitments.pdf (read)
- B08_Attachment_14_Camp_Muir_-_Gabion_Memo.pdf (read)
- B08_Attachment_3_Product_Cut_Sheets.pdf (read)
- B08_Attachment_7_Construction_Contract_Administration.pdf (read)
- B08_Attachment_6_LmtOnSubconRpt.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- B08_Attachment_10_Camp_Muir_Asbestos_Report.pdf: not summarized: open it on SAM.gov
- B08_Attachment_5_WD_WA20260111_5_18_26.pdf: not summarized: open it on SAM.gov
- B08_Attachment_2_Drawings.pdf: not summarized: open it on SAM.gov
- B08_Attachment_15_2026_Quarry_Survey_Summary.pdf: not summarized: open it on SAM.gov
- B08_Attachment_4_Construction_Report.pdf: not summarized: open it on SAM.gov
- B08_Attachment_8_Past_Performance_Questionnaire.docx: not summarized: open it on SAM.gov
Full summary
What they want
- Remove the existing modular building, weather station tower and retaining wall at Camp Muir and dispose of them
- Excavate, stabilize the slope and install geotextile fabric and gabion baskets (wire baskets filled with stone)
- Build two new steel-framed climbing shelters with weather barriers, siding, windows and doors rated for harsh weather
- Install electrical conduits for a future photovoltaic (solar) system, plus grounding and lightning protection per the specifications
- Build and install interior bunks, storage shelving and tables in the shelters
- Plan and pay for all aircraft support: materials go up by helicopter, and the specifications assume 9 helicopter flight days
- Keep guided climbing companies and the public able to use the site during the work
- Contract type
- Firm-fixed-price; one lump sum line item (CLIN 00010, QTY 1 LS)
- Period of performance
- January 15, 2027 to January 14, 2028
- Place of performance
- Camp Muir, Mount Rainier National Park (MORA), Ashford, WA (Pierce County); the site is at 10,080 feet, reached on foot or by helicopter
- Estimated value
- Between $1,000,000 and $5,000,000 (the Government's estimated magnitude of the requirement)
- How they'll choose
- Best value: the Government picks the overall best value considering all factors and may pay more for a stronger offer. The three non-price factors together equal price in weight. Non-price factors are rated from Outstanding to Unacceptable; past performance gets a confidence rating.
- Offers due
- December 10, 2026, 12:00 PM Pacific
What they'll judge offers on
- Factor 1, Experience and Key Personnel: up to 3 recent similar projects, a narrative on managing subcontractors, team coordination, scheduling, communication, logistics and quality control, and the qualifications of the proposed project manager, superintendent, safety specialist and quality control person
- Factor 2, Technical Approach and Schedule: a realistic, efficient approach; a construction schedule with critical path, procurement lead times, trade coordination, on-site storage and staging, and risk mitigation
- Factor 3, Past Performance: recency, relevance and quality, using references, past performance surveys and other Government data
- Price: checked for fairness, reasonableness and unbalanced line items; the Section B price schedule is evaluated in Volume II
What to include when you submit
- Volume I (non-price): experience (up to 3 projects, with contract number and title, award and completion dates, customer and point of contact, scope and magnitude), narrative on managing subcontractors and quality control, key personnel, technical approach, construction schedule and past performance
- Volume II (business, responsibility and price): proposal cover letter, SF 1442 (Standard Form 1442, the construction solicitation, offer and award form), amendment acknowledgements, Section B price schedule, bid bond, Section K representations and certifications, subcontracting percentage worksheet
- Recent experience means currently ongoing or completed within the past 5 years of the solicitation close date; the prime must show the project history itself, because a subcontractor's experience cannot count as the prime's
- Acknowledge Amendments 0001 and 0002 on the SF 1442 or by separate letter or electronic communication that references the solicitation and amendment numbers
- Price every line item in the Section B schedule, including any option items; lump sum items need the total price only
- A past performance questionnaire (Attachment 8) is attached; how it is used was not read
- Include the cost of all helicopter and aviation support in your price
After award, you must have
- Structural steel fabricator: an experienced fabricator is acceptable in place of IAS AC172 accreditation if it uses AWS D1.1-qualified welders, documented quality-control procedures and independent third-party shop inspections
Not in the notice text
- Much of the solicitation was not read: Sections F to L (including wage rates, key personnel, seasonal shutdown, bonds, the site visit section and the submission instructions) and most of the specifications were left out here. Check the full documents on SAM.gov.
- Attached but not read: the drawings (Attachment 2), construction report (4), wage determination (5), limitation on subcontracting report (6), past performance questionnaire (8), asbestos report (10) and quarry survey summary (15).
- Which wage rule applies: the notice is construction (NAICS 236220), and a wage determination file is attached but was not read, so whether Davis-Bacon (the federal construction wage rule) applies is not confirmed here.
- Whether the pre-offer meeting on May 15, 2026 or any later site visit is required: Section L's site visit text was not read.
- How and where to submit offers, page limits and the question deadline are not given in the text that was read.
- Whether the bid bond amount and the performance and payment bond amounts are stated: the bond sections were not read.
- Whether the work can be done remotely is not stated.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 18, 2026
- Notice type
- Solicitation
- Office
- National Park Service Contracting Activity, Denver, CO
- Product/service code
- Y1QA · Construction of Restoration of Real Property (Public or Private)
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
3 versions have been posted, newest first.
- Nov 18, 2026 · Amendment 0002 (this version)Due Dec 10, 2026
- Nov 5, 2026 · Amendment 0001Due Dec 10, 2026
- Nov 3, 2026 · SolicitationDue Dec 10, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Joint Base Lewis McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3221 and 3222The Army Corps of Engineers Seattle District wants construction for Multi Domain Task Force Buildings 3221 and 3222 at Joint Base Lewis McChord in Washington.
- Repair Auto Maintenance Facility Bldg 575 (230040)Only the seven General MACC (multiple award construction contract) holders listed in the RFP can bid on this Camp Lejeune project to repair Auto Maintenance Facility Building 575.
- FY26 MCN P309, School Age Care Centers Replacement, Camp Foster and McTureous, Okinawa, JapanThe U.S. Army (Far East District, Japan office) is asking for sealed bids to build replacement School Age Care Centers on Camp Foster and Camp McTureous in Okinawa, Japan.