Combined Synopsis/Solicitation
Construction-NUWCDIVNPT-Interior Renovations
Department of Defense · Department of the Navy
Small business set-aside · Newport, RI
A newer version of this notice was posted Nov 18, 2026. See the latest version.
AI summary Beta
Summary of another version of this notice: check what changed on SAM.gov. This summary may miss requirements: 7 of 10 attachments weren't read (Attachment_7_Generator usage log.pdf, Attachment_6_ Hazmat usage log.pdf and 5 more). Check the attachments on SAM.gov.
Solicitation N6660427Q0033: Naval Undersea Warfare Center Division Newport (NUWCDIVNPT) wants an interior renovation (the B68 Renovation Project) in Newport, RI, finished 120 calendar days after award. Only small businesses can quote. Only firms with an active cybersecurity certification (CMMC, the Cybersecurity Maturity Model Certification) and a NIST SP 800-171 score in SPRS (the Defense Department's supplier risk database) can get the restricted drawings and specifications. A bid guarantee of 20 percent of the bid price is required. The response due date is December 18, 2026, 2:00 PM Eastern.
Who can bid (10)
- Small business set-aside: only small businesses can quote From N6660427Q0033.pdf
- Be a small business under the NAICS 236220 size standard of $45 million From N6660427Q0033.pdf
- Active, certified CMMC Level 1 (or higher) status From N6660427Q0033.pdf
Show all 10Show fewer
- Current NIST SP 800-171 DoD Assessment score (completed within the last 3 years) posted in SPRS; also needed to get the restricted drawings and specifications From N6660427Q0033.pdf
- Bid guarantee of 20 percent of the bid price furnished with the offer (bid bond or other listed form) From N6660427Q0033.pdf
- Active SAM.gov registration (System for Award Management) and an active CAGE code, which must be given to request the restricted documents From Instructions for Access to Controlled Attachments.pdf
- Site Superintendent with at least 10 years of general construction experience, 5 of them as a primary superintendent on similar projects From N6660427Q0033.pdf
- Quality Control Manager with at least 5 years of experience and a valid USACE/NAVFAC Construction Quality Management for Contractors (CQM-C) certificate From N6660427Q0033.pdf
- Site Safety and Health Officer meeting EM 385-1-1 Level 2 standards plus an OSHA 30-Hour Construction Safety certificate from the last 5 years From N6660427Q0033.pdf
- Past performance: up to three recent, relevant projects as prime contractor (or major subcontractor); no record is rated Acceptable (Neutral) From N6660427Q0033.pdf
How to submit: Electronically by email to the contracting officer (Michael.N.Ouellette.civ@us.navy.mil) and contract specialist (Amy.K.Prisco.civ@us.navy.mil). What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (12)
From the version posted Nov 18, 2026.
- Serious: Small businesses only. Only small businesses under the $45 million size standard can quote; larger firms are shut out. From N6660427Q0033.pdf
- Serious: Drawings and specifications are restricted. The drawings, specifications, hazmat study and paint study can only be downloaded after the Government checks your CMMC and NIST scores in SPRS, so a firm without them cannot see the full scope.
- Serious: Cybersecurity certifications required to be eligible for award. A firm needs CMMC Level 1 or higher and a NIST SP 800-171 score posted in SPRS within the last 3 years; both are checked on the pass/fail cover page review. From N6660427Q0033.pdf
Show all 12Show fewer
- Serious: Bid guarantee of 20 percent required. A bid bond or similar guarantee for 20 percent of the bid price must come with the offer, and failing to provide it may cause rejection. From N6660427Q0033.pdf
- Worth checking: Performance and payment bonds after award. The winner must also furnish performance and payment bonds within 10 days of award, so surety credit has to be arranged beforehand. From N6660427Q0033.pdf
- Worth checking: Site visit on December 2, 2026 needs an approved visit request. Check-in is at 10:00 AM EST in the Building 80 lobby; attendees must pre-register by email and have an approved visit request, which takes 3-5 business days. The text doesn't call the visit mandatory.
- Worth checking: Three named key personnel, full-time on site. Site Superintendent, Quality Control Manager and Safety Officer need resumes and certificates, and must be on site full-time from the start of field work; missing or expired papers make the technical proposal Unacceptable. From N6660427Q0033.pdf
- Worth checking: Work inside an occupied military research facility. The work runs under base security rules with lead-based paint and asbestos controls, so access, utility outages and safety planning must be in the offer.
- Worth checking: Liquidated damages of $200 per day. Finishing late costs the contractor $200 for each calendar day of delay beyond the 120-day completion time. From N6660427Q0033.pdf
- Worth checking: Controlled and scanned attachments not read. The specification, drawings, hazmat study and paint study are controlled files, and the wage determination and usage logs are scanned files, so scope and wage rates here come from the notice only.
- Minor: Questions due 10 calendar days before the response due date. Questions must be in writing by email, and direct talks with Government technical staff are prohibited. From N6660427Q0033.pdf
- Minor: Priority-rated defense order. Any award is a DO-C2 rated order under the Defense Priorities and Allocations System, which carries extra rules the contractor must follow. From N6660427Q0033.pdf
Read from the notice and 3 attachments. 7 of 10 not read. Show which files.
- N6660427Q0033.pdf (read)
- Instructions for Access to Controlled Attachments.pdf (read)
- Attachment_8_Site Visit Instructions.pdf (read)
- Attachment_7_Generator usage log.pdf: not summarized: open it on SAM.gov
- Attachment_6_ Hazmat usage log.pdf: not summarized: open it on SAM.gov
- Attachment_3_Davis Bacon WD_10_1_26.pdf: not summarized: open it on SAM.gov
- Attachment_5_Paint Study Results.pdf: not read (access is restricted): request it on SAM.gov
- Attachment_4_Hazmat Study B68_Redacted.pdf: not read (access is restricted): request it on SAM.gov
- Attachment_2_Drawings_25031.pdf: not read (access is restricted): request it on SAM.gov
- Attachment_1_Specification.pdf: not read (access is restricted): request it on SAM.gov
Full summary
What they want
- Selective demolition inside an occupied military research building: remove suspended ceilings, flooring down to the concrete slab, interior doors and select partitions
- Build new metal stud partitions with Level 5 gypsum wallboard finish, acoustical ceilings with humidity-resistant tiles, and vinyl composition tile (VCT) flooring with vinyl cove base
- Install low/zero-VOC interior paint, heavy-duty interior double doors and interior window units
- Reconfigure heating and cooling (HVAC) supply diffusers and return grilles
- Upgrade electrical power: a 45 kVA transformer, a disconnect switch and branch panels, supporting baseboard convection heating, dimmable LED troffers (ceiling light fixtures), occupancy sensors and emergency egress lighting
- CLIN 0001 (contract line item number: one priced line of the order): the whole renovation as one lump-sum firm-fixed-price (FFP: one set price, whatever the work ends up costing)
- CLIN 0002: construction submittals, quality control plans, safety plans, environmental protection plans and as-built drawings, not priced separately
- Follow USACE EM 385-1-1 (Army Corps of Engineers safety manual), lead-based paint controls, asbestos awareness and base security access rules
- Contract type
- Firm-fixed-price (FFP) purchase order, completion basis; a DO-C2 rated order under the Defense Priorities and Allocations System (DPAS)
- Period of performance
- Construction completion 120 days after contract award
- Place of performance
- Naval Undersea Warfare Center Division Newport (NUWCDIVNPT), Newport, RI
- Estimated value
- Magnitude (price range) listed in the solicitation: between $100,000 and $250,000
- How they'll choose
- Lowest price technically acceptable (LPTA): lowest evaluated fair and reasonable price among offers rated Acceptable on every non-price factor; pass/fail cover page review first; award planned without discussions
- Offers due
- December 18, 2026, 2:00 PM Eastern
- How to submit
- Electronically by email to the contracting officer (Michael.N.Ouellette.civ@us.navy.mil) and contract specialist (Amy.K.Prisco.civ@us.navy.mil)
- Page limits
- Volume I (technical): 20 pages maximum, resumes and certifications excluded. Volume II (past performance and safety): maximum three project references, 8 pages total, safety records, OSHA logs and EMR certifications excluded. Volume III (price): no page limit.
What they'll judge offers on
- Cover page review (pass or fail): signed cover page with amendments acknowledged, active SAM registration under NAICS 236220, CMMC Level 1 or higher, NIST SP 800-171 score in SPRS not older than three years
- Factor 1, Technical Capability (Acceptable or Unacceptable; each subfactor must be Acceptable): (a) technical approach and quality control, (b) project schedule in Gantt chart format, (c) management, staffing and key personnel
- Factor 2, Past Performance and Safety (Acceptable or Unacceptable): up to three project references, workers' compensation experience modification rate (EMR), OSHA injury rates; no record earns Acceptable (Neutral)
- Factor 3, Price: completeness and price reasonableness of the single lump-sum price for CLIN 0001
What to include when you submit
- Send three volumes plus a cover page placed directly before Volume I: Volume I Technical Capability, Volume II Past Performance and Safety, Volume III Price
- Cover page: solicitation number, project title, amendment acknowledgments with number and date, legal name, headquarters and local branch addresses, website, phone, state of incorporation, CAGE code (Commercial and Government Entity code), SAM unique entity ID, taxpayer ID, CMMC unique identifiers (UIDs) from SPRS, contacts, and a signature by an official who can bind the company
- Files in Word, Excel or Adobe PDF; not password-protected; avoid zip or macro-enabled files; name each file with the offeror's name and volume designator
- Volume I: technical approach and quality control narrative covering site constraints, a Gantt chart project schedule within the 120-day period, and a management and staffing plan with an organizational chart
- Key personnel: resumes, registrations, licenses and certifications for the Site Superintendent, Quality Control Manager (QCM) and Site Safety and Health Officer (SSHO); a release and transition plan if they are on other projects
- Volume II: a maximum of three past performance references as prime contractor (or a major subcontractor that did at least 30% of the field work), with physical work performed within three years before the closing date, similar in scope, dollar value and complexity
- For each reference: contract number, contract type, award and final value, a narrative of the work, and contact details for the contracting officer, COR (contracting officer's representative) or project manager
- Safety records: EMR for the past three calendar years, OSHA Form 300A for three years, redacted OSHA Form 300 for the prior year and year to date, and DART (days away, restricted or transferred) rates; explain an EMR of 1.0 or higher or a DART rate of 3.4 or higher
- Volume III: completed solicitation pricing schedule with one all-inclusive firm-fixed-price for CLIN 0001, including the cost of CLIN 0002 submittals
- Include a bid guarantee equal to 20 percent of the bid price (bid bond, certified check or similar) with the offer
- Fill in all clauses and provisions that need offeror information
After award, you must have
- Performance and payment bonds within 10 days of award From N6660427Q0033.pdf:
The contractor shall furnish any required Performance and Payment Bonds within 10 Days…
- Insurance certificate approved by the contracting officer before physical work starts: workers' compensation, bodily injury of at least $500,000 per occurrence, and automobile liability From N6660427Q0033.pdf:
Bodily injury liability insurance coverage shall be written on the comprehensive form of…
Current contractor
Notice 12 says this is a new requirement, so there is no incumbent.
Not in the notice text
- The specification, drawings (Drawings # 25-031), hazmat study and paint study are controlled attachments on SAM.gov and weren't read; the Rhode Island Davis-Bacon wage determination (dated 1 October 2026) and the hazmat and generator usage logs are scanned files that weren't read.
- The construction wage rule is Davis-Bacon (the federal pay rule for construction workers); the actual wage rates are in a scanned attachment.
- The notice says to request access to the controlled files through SAM.gov, but it gives no date by which access must be requested.
- Whether the site visit is required isn't stated.
- Whether work can be done remotely isn't stated.
More to check before you bid
- The notice names requirements:
- The notice mentions CMMC, the Defense Department's cybersecurity certification. Check the level it asks for.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 17, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- NUWC Div Newport, RI
- Product/service code
- Z1AZ · Maintenance of Other Administrative Facilities and Service Buildings
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
3 versions have been posted, newest first.
- Nov 18, 2026 · Amendment 0002Due Dec 18, 2026
- Nov 17, 2026 · Amendment 0001Due Dec 18, 2026
- Nov 17, 2026 · Combined Synopsis/Solicitation (this version)Due Dec 18, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- NUWCDIVNPT-Construction-Vaporizer Enclosure (Design-Build)Naval Undersea Warfare Center Division Newport (NUWC Division Newport), Department of the Navy, wants a design-build contractor to enclose government liquid propane (LP) gas…
- Interior Office Renovation and Wall Removal - Offutt AFBSources sought notice FA7014-27-CP-0001 from the Department of the Air Force (55th Contracting Squadron) for market research only; it is not a solicitation.
- Building 262 Renovation, FLETC Glynco, GeorgiaThe Federal Law Enforcement Training Center (FLETC) at Glynco, Georgia wants a contractor to renovate Building 262 under solicitation 70LGLY27RSSB00001, one firm-fixed-price…
- Seawater Pump RenovationThe National Oceanic and Atmospheric Administration (NOAA), part of the Department of Commerce, wants a small business to replace the salt water pump system and its wiring at its…
- Design-Build Renovation of Building 164, Outdoor Recreation Center, Homestead Air Reserve Base, FloridaThe Department of the Air Force (contracting office FA6648 482 LSS LGC) wants a firm-fixed-price design-build contractor to renovate the Outdoor Recreation Center, Building 164,…