Combined Synopsis/Solicitation
NUWCDIVNPT-Construction-Vaporizer Enclosure (Design-Build)
Department of Defense · Department of the Navy
Small business set-aside · Newport, RI
AI summary Beta
This summary may miss requirements: 2 of 6 attachments weren't read (Davis Bacon WD RI20260001_10_1_2026.pdf, Attachment_1_and _2_ Specification and Drawings- Design-Build (SOW).pdf). Check the attachments on SAM.gov.
Naval Undersea Warfare Center Division Newport (NUWC Division Newport), Department of the Navy, wants a design-build contractor to enclose government liquid propane (LP) gas vaporizer units in Newport, Rhode Island: a firm-fixed-price request for quotations (RFQ), solicitation N6660427Q0077 (written N66604-27-Q-0077 in the RFQ). It is a total small business set-aside; the response due date is December 17, 2026, 2:00 PM Eastern, and the RFQ also gives a September 25, 2026 (passed) date, so confirm which applies. A bid guarantee of 20 percent of the bid price and a posted cybersecurity record in the Supplier Performance Risk System (SPRS) are required, and the specifications are controlled documents.
Who can bid (6)
- Small business under NAICS 236220 ($45M size standard): total small business set-aside From N6660427Q0077.pdf
- Bid guarantee of 20 percent of the bid price, in the proper form (for example a bid bond), with the quote From N6660427Q0077.pdf
- Active SAM registration; to request the controlled specifications, an active CAGE code and the company's CMMC Unique Identifier (UID) or SPRS entry ID From N6660427Q0077.pdf
Show all 6Show fewer
- Cybersecurity record in SPRS: a current NIST SP 800-171 assessment score and a Cybersecurity Maturity Model Certification (CMMC) Final Level 1 (Self) assessment with annual affirmation, before award
- Key personnel: Superintendent (10 years of construction, 5 as superintendent), Quality Control Manager (5 years), Level 1 Site Safety and Health Officer, and a Lead Professional Engineer with an active, unrestricted license in the state where the work is done (or reciprocity before performance) and 5 years of design-build experience From N6660427Q0077.pdf
- Past performance: up to three similar projects within the last five years, in active industrial or hazardous environments From N6660427Q0077.pdf
How to submit: Email to Michael Ouellette (michael.n.ouellette.civ@us.navy.mil) and the alternate contact Alexander Olarte (alexander.olarte.civ@us.navy.mil); Microsoft Office or Adobe PDF files. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (10)
From the version posted Nov 17, 2026.
- Serious: SAM.gov and the solicitation disagree on the set-aside. SAM.gov lists a set-aside for small businesses, but the solicitation the AI read says no set-aside. Ask the contracting officer which applies before you bid.
- Serious: Controlled specifications and drawings: access request first. The specifications and drawings can be seen only after an access request in SAM.gov that gives an active CAGE code and the company's CMMC UID or SPRS entry ID, so a business without these can't price the job.
- Serious: Bid guarantee of 20 percent of the bid price. A bid guarantee must come with the quote or the quote may be rejected; a small business needs surety capacity or cash for it before bidding. From N6660427Q0077.pdf
Show all 10Show fewer
- Serious: SPRS cybersecurity record required before award. No award is made without a posted NIST SP 800-171 score in SPRS, and the RFQ also asks for a CMMC Unique Identifier from SPRS with the proposal.
- Serious: Four named key personnel with resumes and licenses. The quote must name a Superintendent, Quality Control Manager, Site Safety and Health Officer, and Lead Professional Engineer with proof of licenses; the engineer must be licensed in Rhode Island or able to get reciprocity before performance. From N6660427Q0077.pdf
- Worth checking: Site visit on December 2, 2026; visit request needed. Check-in is 11:30 AM EST in the Building 80 lobby; attendees must pre-register by email and have an approved Visit Request, which needs 7 business days. The RFQ does not say attendance is required. From Attachment_6_SITE VISIT INSTRUCTIONS .pdf
- Worth checking: Design price limited to 6 percent of construction cost. A quote whose design price (CLIN 0001) is over 6 percent of the estimated construction cost is unawardable, and a front-loaded design line may be rejected. From N6660427Q0077.pdf
- Worth checking: Hazardous site: LP gas, contaminated soil, Level D protective equipment. The work is in an active hazardous environment with contaminated soil handling under the Naval Station Soil Management Plan and strict safety standards, and the technical proposal must address them. From N6660427Q0077.pdf
- Minor: Date passed (Jul 30, 2026): Award date and wage determination date stated inconsistently. The RFQ gives an anticipated award date of January 2026, and describes the Davis-Bacon wage determination as dated July 30, 2026 in one place and 1/30/26 in the attachment list. From N6660427Q0077.pdf
- Minor: Design first, construction notice to proceed later. Only design starts at award; construction waits for Government approval of the 100% design and a separate written notice to proceed, and earlier work is at the contractor's risk. From N6660427Q0077.pdf
Read from the notice and 4 attachments. 2 of 6 not read. Show which files.
- N6660427Q0077.pdf (read)
- Attachment_6_SITE VISIT INSTRUCTIONS .pdf (read)
- Attachment_5 Generator Usage Log.pdf (read)
- Attachment_4- Hazmat Usage Log.pdf (read)
- Davis Bacon WD RI20260001_10_1_2026.pdf: not summarized: open it on SAM.gov
- Attachment_1_and _2_ Specification and Drawings- Design-Build (SOW).pdf: not read (access is restricted): request it on SAM.gov
Full summary
What they want
- CLIN 0001, 1 Job: firm-fixed-price design for the enclosure (concept, schematic, design-development, and final construction documents)
- CLIN 0002, 1 Job: build the enclosure per the approved final design (structural steel, foundation, ventilation, Class I Division 1 and 2 hazard-rated systems)
- CLIN 0003, 1 Lot: construction submittals, schedules, and reports (not separately priced)
- Finish construction within 180 days after the date of contract award
- Follow the Army Corps of Engineers safety manual EM 385-1-1, OSHA standards, NFPA 58, NFPA 70, NFPA 72, and ASME standards
- Manage contaminated soil under the Naval Station Soil Management Plan, with Level D protective equipment
- Design work is released first; no construction, site preparation, or material buying until the Government approves the 100% final design and issues a separate notice to proceed
- Contract type
- Firm-fixed-price (FFP): one set price, whatever the work ends up costing; completion basis; a rated order (DO) under the Defense Priorities and Allocations System
- Period of performance
- 180 days after date of contract award
- Place of performance
- Naval Undersea Warfare Center Division Newport (NUWCDIVNPT), Newport, RI
- Estimated value
- Magnitude of construction between $100,000 and $250,000, as the RFQ gives it
- How they'll choose
- Best value tradeoff: the Government may pay more for a better technical or past performance proposal, but not a significantly higher price for marginal technical superiority
- Offers due
- December 17, 2026, 2:00 PM Eastern
- How to submit
- Email to Michael Ouellette (michael.n.ouellette.civ@us.navy.mil) and the alternate contact Alexander Olarte (alexander.olarte.civ@us.navy.mil); Microsoft Office or Adobe PDF files
- Page limits
- Technical volume (Volume I): 30 pages
What they'll judge offers on
- Factor 1, Technical Capability (more important than Past Performance): (a) Design & Construction Approach, (b) Key Personnel Qualifications, (c) Environmental Management Plan; the three are equally important
- Factor 2, Past Performance & Corporate Safety: relevance, currency, and quality of references, plus safety record (experience modification rating, OSHA logs, citations)
- Factor 3, Price: reasonableness, balance between design and construction lines, and the 6 percent design fee limit; Factors 1 and 2 combined are significantly more important than price
What to include when you submit
- Send three separate volumes: Volume I Technical Proposal (no pricing), Volume II Past Performance (no pricing), Volume III Cost/Price Proposal
- Volume I: Design & Construction Approach, Key Personnel with resumes and proof of licenses and certifications (Superintendent, Quality Control Manager, Site Safety and Health Officer, Lead Professional Engineer), and a draft Environmental Management Plan
- Volume II: up to three past performance references for similar projects completed within the last five years, each with contract number, agency or customer, total contract value, period of performance, and a short description of the work
- Volume II: corporate safety record with current Experience Modification Rating (explain any rating of 1.00 or higher), OSHA Forms 300 and 300A for each calendar year 2021 through 2026, and any environmental, health, or safety citations since January 1, 2021 with the response and resolution (or a statement that there were none)
- Volume III: price for CLIN 0001 (design) and CLIN 0002 (construction) shown separately, with labor, materials, and subcontracting breakdowns and a schedule of values (SOV); design price may not exceed 6 percent of the estimated construction cost
- Provide a bid guarantee with the quote (20 percent of the bid price)
- Provide the CMMC Unique Identifier(s) (UID) from SPRS for the systems that will process Federal Contract Information, along with the proposal
- Fill in all clauses and provisions that need fill-in information
- Pre-register by email for the site visit and have an approved Visit Request on file to attend
After award, you must have
- Performance and payment bonds within 10 days of award From N6660427Q0077.pdf:
Note 11: The contractor shall furnish any required Performance and Payment Bonds within 10…
- Insurance approved by the contracting officer before physical work: workers' compensation and employer's liability of at least $100,000, bodily injury liability of at least $500,000 per occurrence, and automobile liability From N6660427Q0077.pdf:
(ii) Bodily injury liability insurance coverage shall be written on the comprehensive form of…
Current contractor
None: the RFQ says this is a new requirement.
Not in the notice text
- The specifications and drawings (Attachment 1 and 2) are controlled and the Davis-Bacon wage determination is a scanned PDF; both are attached but not read, so key requirements may be missing from this brief.
- Whether attendance at the December 2, 2026 site visit is required is not stated; the RFQ includes the site visit clause (FAR 52.237-1).
- Which response due date governs: the table and SAM.gov give December 17, 2026, while the request line says September 25, 2026.
- The wage rate details of the Rhode Island Davis-Bacon wage determination are in a scanned file that wasn't read.
- The safety office and environmental email contacts are to be provided at award.
More to check before you bid
- The notice names requirements:
- The notice mentions CMMC, the Defense Department's cybersecurity certification. Check the level it asks for.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 17, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- NUWC Div Newport, RI
- Product/service code
- Y1AZ · Construction of Other Administrative Facilities and Service Buildings
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside