Opportunities › Notice

Sources Sought

USCG Station at Cape Disappointment

Department of Defense · Department of the Army

More open Army contracts

Plan my responseSaveSave adds it to My opportunities (free account). Log in
View on SAM.gov ↗

Email me about this notice. We'll email you if it's amended or awarded, and send two reminders: one a week before responses are due and one two days before.

No account needed. We'll send a link to confirm, and every email has a one-click stop. Want matches for your business too? Create a free account.

AI summaryThis is a sources sought notice (market research), not a request for proposals: the Army Corps of Engineers Portland District, for the U.S. Coast Guard (USCG), asks who could do repairs at USCG Station at Cape Disappointment. The work covers rockfall mitigation, replacing floating docks and the vessel haul-out, and fixing sediment build-up, with an approximate value of $50M to $100M. Formal responses are due before 3:00 PM PDT on November 26, 2026 (an amendment moved it to Nov 15, 2026, 3:00 PM PST · 6:00 PM Eastern). More in the summary

Market research, not a bid. Replying is free and tells Department of the Army who could do this work. Send a short reply to the contracting contact; no price is needed. See the contact

Contracting contact

Primary contactBrandon Lasich
brandon.m.lasich@usace.army.mil
Alternate contactJaren Bowman
Jaren.L.Bowman@usace.army.mil

Key facts

Response due
Due in 18 daysNov 15, 2026, 3:00 PM PST · 6:00 PM EasternAdd deadline to calendar
Solicitation number
W9127N27R2184
Place of performance
USCG Station at Cape Disappointment (the notice does not give a state) (from the AI summary)

AI summary Beta

Written by AI from the notice text. Check dates on SAM.gov.

Summary of the version posted Oct 23, 2026. The notice was amended Oct 27, 2026. The due date moved from Nov 26, 2026 to Nov 15, 2026. Check what else changed on SAM.gov.

This is a sources sought notice (market research), not a request for proposals: the Army Corps of Engineers Portland District, for the U.S. Coast Guard (USCG), asks who could do repairs at USCG Station at Cape Disappointment. The work covers rockfall mitigation, replacing floating docks and the vessel haul-out, and fixing sediment build-up, with an approximate value of $50M to $100M. Formal responses are due before 3:00 PM PDT on November 26, 2026.

Who can bid

  • Registered in the System for Award Management (SAM) for your size status to be considered, and kept current through source selection
  • Open to both large and small businesses, including 8(a), HUBZone, women-owned, service-disabled veteran-owned and veteran-owned firms; no set-aside is stated

How to submit: Online form (Microsoft Forms) for the question answers, plus an email with supporting documents to Brandon Lasich and Jaren Bowman, due November 26, 2026, before 3:00 PM PDT. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.

Things to watch (5)

SeriousWorth checkingMinor

  • Worth checking: Sources sought only. This is market research; it is not a request for proposals and does not obligate the Government to award a contract.
  • Worth checking: Large project: approximate value $50M to $100M. A project this size may call for large bonding and financial capacity; the notice does not say what is required.
  • Worth checking: Difficult marine and slope conditions. Work includes dock and breakwater construction near a Federal Channel with complex tidal currents, and rockfall work needing difficult access techniques.
Show all 5Show fewer
  • Worth checking: Dock operations continue during construction. Work must be phased around a working Coast Guard station, with phasing set by the Government.
  • Minor: Response limited to six pages. Answers go in an online form and the email adds supporting documents; the written response may not exceed six pages.

Read from the notice text only.

Full summary

What they want

  • Rockfall mitigation: tree removal, rock scaling, rock dowel installation, draped mesh removal and replacement, ringnet fence repair and a midslope attenuator system
  • Repair of a small landslide slump along the access road
  • Replace the floating docks in their current footprint with updated materials, replace or reuse piles, replace wave screens and the vessel haul-out facility, and upgrade electrical equipment
  • Coastal resilience and sedimentation fixes, with surveys, testing and coastal modeling to inform the design
  • Eel grass and submerged aquatic vegetation (SAV) surveys to inform the design
  • Keep dock operations running during construction, using phasing set by the government
  • Possible interim repairs on existing structures before new work is finished
Contract type
Not decided: the notice asks about design-build, progressive design-build and design-bid-build
Place of performance
USCG Station at Cape Disappointment (the notice does not give a state)
Estimated value
Approximate value of the project: $50M to $100M
Offers due
November 26, 2026, before 3:00 PM PDT (from the version posted Oct 23, 2026; amended since)
How to submit
Online form (Microsoft Forms) for the question answers, plus an email with supporting documents to Brandon Lasich and Jaren Bowman
Page limits
Response: 6 pages

What to include when you submit

  • Use the online form link in the notice for answers to the questions, and email supporting documents
  • Use the email subject "Response to questions on Cape Disappointment"
  • Email Brandon Lasich (Brandon.M.Lasich@usace.army.mil) and Jaren Bowman (jaren.l.bowman@usace.army.mil)
  • Say what your interest is in a design-build solicitation for the dock work, for the sedimentation work, and for a progressive design-build contract, with benefits and risks
  • List your capabilities to design and build a segmented breakwater and haul structure near a Federal Channel with complex tidal currents, sand movement and large storms
  • Say whether you have experience designing to USACE and USCG waterfront criteria and Unified Facilities Criteria (UFC)
  • List previous design-build work in similar complex environments and previous design-build dock work
  • Answer the rockfall, dock replacement and sedimentation questions about methods, equipment and sequence

Not in the notice text

  • The NAICS code is listed as TBD (to be determined) and the set-aside for any later solicitation is not stated
  • Whether there will be a site visit, and which wage rule (such as a Davis-Bacon wage determination) applies, are not stated
  • Contract type and how many contracts: the Government is asking industry about design-build, progressive design-build, design-bid-build and combining scope items
  • Bonding requirements, schedule, solicitation date and evaluation factors for any later solicitation
  • State or full address of the place of performance

Eligibility and how to respond

  • No set-aside. Any business can reply: this is market research, and no bid is being taken yet.
  • To respond, send a short reply to the contracting contact near the top of this page. No price is needed.

Notice details

Posted
Oct 27, 2026
Notice type
Sources Sought
Office
W071 ENDIST Portland, OR
Versions

2 versions have been posted, newest first.

  • Oct 27, 2026 · Amendment 0001 (this version)Due Nov 15, 2026 (changed)
  • Oct 23, 2026 · Sources SoughtDue Nov 26, 2026
Attachments

Checking SAM.gov for this notice's files…

See attachments on SAM.gov

Should you respond?

Usually yes, if you could do this work. The agency is asking who could do it before it writes the solicitation. A short reply (who you are, similar work you've done, how you'd approach it) costs nothing, and enough small businesses replying can get the work set aside for them.

How to answer a sources sought notice, with a free template

Create a free account

Past awards and competition

Who has won work like this before, the likely incumbent, and what similar contracts paid, from USAspending.gov.

Create a free account to see who won work like this

Before you respond

  • How to answer a sources sought notice

Terms on this notice: Sources sought notice

Full notice text from SAM.gov
10//27/2026: Update - The response due date has been changed to 15 November 2026. General. This is a SOURCES SOUGHT and is for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER RFO FAR SUBPART 5.1, PRESOLICITATION. This Sources Sought is to gain knowledge of the interest, capabilities, and qualifications of industry so the government can make informed business decisions. We are seeking responses from both large and small business members of industry to include: Small Business, Small Disadvantaged Businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Woman Owned Small Business (WOSB) to include Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) and Veteran Owned Small Business (VOSB). All interested parties are highly encouraged to respond. The North American Industrial Classification Code (NAICS) for this requirement is: TBD - The approximate value of Project will be $50M to $100M. Formal Sources Sought Response Due – before 3:00 pm PDT on 26 November 2026 2. Project Details and Background. The USCG Station at Cape Disappointment requires repairs, upgrades, and improvements to existing infrastructure and nearby areas to restore and retain full mission readiness. The Station is on an unstable sandbar which has experienced sediment migration into dock and adjacent waterway areas. Dock structures are failing and require repair/replacement. The vessel haul-out facility is currently inoperable due to sedimentation and requires the USCG to conduct frequent maintenance dredging. Haul-out structure is failing and requires replacement. Adjacent landscape features pose rockfall dangers above the engineering and maintenance buildings to people and property 3. Project Scope. Rockfall slope instability corrective measures: Anticipated rockfall mitigation will require corrective measures including but not limited to tree removal, rock scaling, rock dowel installation, draped mesh removal and replacement, removal and/or repair of an existing damaged ringnet fence, and installation of a midslope attenuator system. Rockfall mitigation will require difficult access techniques to reach the full height of the hazardous slope. Temporary protection of the facility and workers will be required. Repairs to damaged roadways, utilities or access pathways may be required. Repair of an existing small landslide slump along the access road is required. Final mitigation work will reduce rockfall risk to USCG personnel and facility. Waterfront structures and vessel haul-out: The waterfront structures require repairs and upgrades. Replacement of the existing floating docks is required; they will retain their current configuration (footprint) but utilize updated material specifications. Existing timber and steel piles will be either replaced, or reused with new floats, as part of this contract, depending on current condition. Geotechnical, civil, structural, mechanical, and electrical scope is included. Constraints include: Float A to be retained; guide piles at floating docks #2 and #4 to be replaced; wave screens to be replaced; electrical equipment to be upgraded; existing vessel haul-out facility to be replaced. Eel grass and SAV surveys are required to inform design. Dock operations are to be maintained during construction, per phasing to be outlined by the government. Coastal Resilience and Sedimentation Remediation: Due to the catastrophic loss of the protective coastal dune, the facility requires a comprehensive permanent solution to control massive sediment migration. Bathymetric surveys, geotechnical testing, and coastal modeling are required to inform viable design and permit alternatives. The design will utilize modern, resilient coastal engineering practices including Nature-Based Solutions (NBS), dynamic revetments, segmented offshore breakwaters/sills, and the beneficial reuse of dredged sediment wherever practicable. Construction may be implemented in functional phases to optimize funding and operational readiness. Shoreline protection repairs and upgrades are considered part of this category along with the Haul Out structure. Interim repair work: Interim repair work may be required on existing structures before new design and construction activity can be completed. If the need arises, USACE will provide USCG a description of the recommended repairs and a cost estimate. If USCG would like USACE to institute repairs, an updated agreement to define the scope will be established. 4. Submission Instructions. Formal responses to this Sources Sought notice must be submitted electronically via MSForms (link is here https://forms.osi.apps.mil/r/Aivta2iThu) for answers to Section 3 Questions above and via email with supporting documentation requested here in Section 4 Submission Instructions. Submit your email with SUBJECT: "Response to questions on Cape Disappointment". Please email to Brandon Lasich Brandon.M.Lasich@usace.army.mil and Jaren Bowman, at jaren.l.bowman@usace.army.mil Interested parties’ responses to this Sources Sought shall be limited to six (6) pages and shall include the following information: What is the interest in submitting a proposal for a Design Build solicitation for the dock work What would be the interest in submitting a bid for a Design Build solicitation for the Sedimentation mitigation work. What is the interest in submitting a proposal for a Progressive Design Build contract. Provide benefits and risks for Progressive Design Build for any of the scope items presented. What issues do you see with soliciting for construction contracts work as described in section 3. List the capabilities of your firm to do the design and construction of new segmented breakwater and haul structure working close to a Federal Channel, complex tidal currents and wave loading, complex movement of sand, and subject to large storm event What are the capabilities to design and construction for the renovation of new dock work. Do you have experience designing to USACE and/or USCG waterfront design criteria: USCG Configuration Standard Technical Orders relevant to this project scope UFC/USACE requirements relevant to this project scope Design for complex hydro loading conditions in shallow bays to USACE/UFC criteria. List previous design build work for doing work in complex environment where one had to consider the working close to a Federal Channel, complex tidal currents, complex movement of sand, subject to large storm events and is highly dynamic. List previous design build work for dock work. What issues do you see with the work. What issue do you see with design bid build. Provide input for benefits and negatives to separate construction contracts (for each scope item in Section 3), or a combination of scope items into 1 or 2 contracts. Rockfall Mitigation Specific Questions What construction methods are anticipated for the rock scaling, for rock dowels, mesh and attenuator installation? What is the general anticipated construction sequence to remove trees, scale rock and debris, install mitigation and make repairs to existing rockfall systems (to remain)? How will rock scaling be performed? What method(s) will prevent scaled rock and cut trees from damaging building, buried utilities? What are the anticipated types and size of equipment required to construct the rockfall systems - e.g. crane or helicopter size; wagon drill, crane mounted drill, or hand plugger; scale bar, air bag, or mechanical scaling, etc? List any constructability issues or concerns; e.g. accessibility, equipment footprints, scaling etc. What is the contractor’s experience with similar types of flexible midslope attenuator/geohazard mitigation on transportation, dam infrastructure or similar projects? During rockfall mitigation work, how fast can work stop, safely hold and clear road debris to allow USCG emergency responders full, safe access to execute rescue operations? Dock Replacement Specific Questions What construction method is anticipated to replace the dock pilings and boat haulout pier in a similar footprint? What is your experience in pile and dock removal and replacement in tightly controlled spaces (both in plan area around operating docks, and elevation limitations for installation of piles in clearance limited spaces), and relying on phased construction to maintain operations of the current facility during construction? Provide feedback for potential to fast track certain fabricated parts during the design phase to meet specific in water work windows (season, year). Are there items that can be queued up for fabrication earlier in the design phase while final details are still being finalized, in order to expedite lead times to meet installation windows? Sedimentation Specific Questions Anticipated method to transport riprap and/or jetty stone via land? Via water? Anticipated method to install riprap and/or jetty stone, based on land and/or water transport. What is the construction sequence for dredging, stone procurement, transport and placement of stone? 5. Disclaimer and Important Notes. a. This notice does not obligate the Government to award a contract. No reimbursement will be made for any costs associated with providing information in response to this Sources Sought or any follow-up information. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's capabilities to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or to provide feedback to respondents with respect to any information submitted. b. All interested firms must be registered in the System for Award Management (SAM) at https://www.sam.gov to have size status considered. You must remain current for the duration of the source selection process to be eligible for award of a Government contract.

Get new contracts like this one by email. Our free weekly contracts email, no account needed: we check SAM.gov every Monday morning (Eastern) and email you only when something new is posted, up to 10 still-open notices with due dates and set-asides.

We'll send a link to confirm first, and every email has a one-click stop.

FedReady

Opportunity data comes from SAM.gov's public Contract Opportunities extract. FedReady is an independent company and is not affiliated with SAM.gov or any government agency. Always confirm details on SAM.gov before responding.

The weekly contracts email sends new federal contracts in your line of work, free, no account needed. Get the weekly contracts email

FedReady

SearchGuidesHow it worksPricingAboutHow we check our dataCompare with other toolsHelp & contactAccessibilityTermsPrivacySecurityhello@fedready.us

Free tools

NAICS code lookupCAGE code and UEI lookupSBA size standard checkerHUBZone map checkerSAM registration status checkSCA bid price calculatorAll free tools

Research

Contracts by industryContracts by agencyRecent contract awardsExpiring contractsProcurement forecastsSubcontracting plansSBIR and STTRHUBZones by stateContractorsNAICS codesMonthly set-aside reportsSBA certificationsGlossaryVideos

© 2026 ZohaDigital LLC, the company behind FedReady, in Charlotte, North Carolina. All rights reserved.