Presolicitation
ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1
Department of Transportation · Federal Highway Administration
A newer version of this notice was posted Nov 12, 2026. See the latest version.
This opportunity has closed (responses were due Nov 13, 2026)
Recent NAICS 237310 contract awards: who won →
These similar contracts are still open:
- NPS Repair or Alteration of Highways, Roads, Streets, Trails and Bridges MultipSources sought notice 140PP027R0017: the National Park Service Denver Service Center is asking small businesses for capability statements for a possible nationwide multiple-award…
- NM FLAP SR35(1) Grant County BridgesPresolicitation: the Federal Highway Administration's Central Federal Lands Division plans to rebuild three bridges and a concrete box culvert on State Route 35 near Mimbres,…
- UT NP ARCH 100(2) Bridges on Delicate Arch RoadSolicitation 6982AF27B000005: the Federal Highway Administration (Central Federal Lands Highway Division) wants a contractor to build three 100-foot-span concrete bridges, raise…
- WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8Western Federal Lands Highway Division (Federal Highway Administration) is asking for sealed bids on an invitation for bids (IFB), a sealed-bid construction buy, to repair Upper…
- AK FLAP ANCHORAGE 2021(1), Far North Bicentennial Park EnhancementsInvitation for bids (IFB: sealed bids, the lowest bid wins) 69056726B000012: the Federal Highway Administration (FHWA), Western Federal Lands Division, wants trail improvements…
AI summary Beta
Summary of the version posted Aug 20, 2026. The notice was amended Nov 12, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 1 of 3 attachments weren't read (ida-kooten8450-1_plan_pre-ad.pdf). Check the attachments on SAM.gov.
The Federal Highway Administration's Western Federal Lands Division plans to build a new single-span precast, prestressed concrete bridge (about 55 feet), realign and rebuild the road, and stabilize the rock slope on Yellowstone Trail Road, about 7.5 miles east of Coeur d'Alene, Idaho. The estimated price is $2 million to $5 million with tentative completion in Fall 2027. This presolicitation is for the Idaho, Montana, and Surrounding Areas multiple award task order contract (MATOC), so only the pre-selected MATOC prime contractors can bid; other firms can look for subcontracting work.
Who can bid (4)
- Limited competition: only MATOC holders can bid, not every business that meets the set-aside.
- Must be one of the Idaho, Montana, and Surrounding Areas MATOC prime contractors: ASCORP INC dba DEBCO Construction, Granite Construction, Hamilton Construction, M.A. Deatley Construction, MJ Hughes Construction, or Thompson Contracting
- Aggregate must come from commercial sources certified through the North American Weed Free Forage Program or a similar process approved by the Federal Highway Administration From Preliminary Letter_ID FLAP KOOTEN 8450(1).pdf
Show all 4Show fewer
- Set-aside: none stated in SAM.gov or the text
How to submit: Not yet issued; the Request for Proposal (specifications and plans) will be posted on SAM.gov. Follow the opportunity on SAM.gov to be notified.. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (4)
- Serious: Only MATOC holders can bid as prime. A small business that is not one of the six listed MATOC contractors cannot submit a proposal and can only pursue subcontract work with them.
- Worth checking: Solicitation timing differs between documents. The notice and project description say the solicitation is expected in Fall 2026, while the letter says documents will be available in winter 2026/2027. From Preliminary Letter_ID FLAP KOOTEN 8450(1).pdf
- Worth checking: Date passed (Oct 31, 2026): Site viewing window is limited. Offerors are encouraged (not required) to view the site in fall, access after October 31, 2026 may depend on weather, and no federal staff will lead tours. From Preliminary Letter_ID FLAP KOOTEN 8450(1).pdf
Show all 4Show fewer
- Minor: Specialized bridge and rock slope work. The work includes rock bolts, rock dowels, shotcrete, UHPC and temporary rockfall protection next to Interstate 90, which needs experienced subcontractors and careful traffic control.
Read from the notice and 2 attachments. 1 of 3 not read. Show which files.
- PROJECT DESCRIPTION_ID FLAP KOOTEN 8450(1).pdf (read)
- Preliminary Letter_ID FLAP KOOTEN 8450(1).pdf (read)
- ida-kooten8450-1_plan_pre-ad.pdf: not read (it couldn't be opened): open it on SAM.gov
Full summary
What they want
- Install a new single-span precast, prestressed concrete bridge, about 55 feet long, with concrete bridge railing
- Realign and reconstruct 0.20 miles of roadway, including aggregate base and asphalt concrete paving
- Stabilize the rock mass below the structure: rock bolts, rock dowels, reinforced shotcrete and temporary rockfall protection
- Ultra-high performance concrete (UHPC) work
- Guardrail, terminals, signs, pavement markings and temporary traffic control
- Erosion control, drainage and utility conduit items
- Contract type
- Firm-Fixed-Price Task Order Contract (task order under the MATOC), awarded under one bid schedule
- Period of performance
- Tentative completion date Fall 2027; the exact date will be in SF1442 Continuation, Block 11 when the solicitation is issued
- Place of performance
- Coeur d Alene, ID, USA (SAM.gov field). Notice text: Kootenai County, Idaho, Coeur d'Alene National Forest, 7.5 miles east of Coeur d'Alene, along Yellowstone Trail Road and Interstate 90
- Estimated value
- $2 million to $5 million (estimated price range)
- Contract vehicle
- Idaho, Montana, and Surrounding Areas MATOC (task order competed among the MATOC contract holders)
- How to submit
- Not yet issued; the Request for Proposal (specifications and plans) will be posted on SAM.gov. Follow the opportunity on SAM.gov to be notified.
What to include when you submit
- Only the six MATOC prime contractors listed in the letter may submit proposals
- Click "follow" on the SAM.gov opportunity page to be notified when solicitation documents are posted
- Technical questions by email to wfl.plans-spec@dot.gov; general questions to wfl.contracts@dot.gov or 360-619-7520
- Work will be solicited and awarded under one bid schedule
Not in the notice text
- Proposal due date, evaluation method and factors, and submission instructions (these come with the RFP, not yet posted)
- Exact solicitation release date (Fall 2026 versus winter 2026/2027) and exact completion date (SF1442 Block 11)
- Bonding, wage determination and other contract terms are not stated
- The preliminary plans (ida-kooten8450-1_plan_pre-ad.pdf) were too large and were not read
- Whether there's a site visit: this summary doesn't say. Check the solicitation and its amendments on SAM.gov.
Notice details
Notice type, codes, versions and files
- Posted
- Aug 20, 2026
- Notice type
- Presolicitation
- Office
- 690567 Western Federal Lands Div, Vancouver, WA
- Product/service code
- Y1LB · Construction of Highways, Roads, Streets, Bridges, and Railways
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237310)
- Versions
7 versions have been posted, newest first.
- Nov 12, 2026 · Amendment 0005Due Nov 13, 2026
- Nov 10, 2026 · Amendment 0004Due Nov 13, 2026
- Nov 9, 2026 · Amendment 0003Due Nov 13, 2026
- Nov 4, 2026 · Amendment 0002Due Nov 13, 2026
- Oct 29, 2026 · Amendment 0001Due Nov 13, 2026
- Oct 13, 2026 · SolicitationDue Nov 13, 2026
- Aug 20, 2026 · Presolicitation (this version)No date on SAM.gov
- Attachments