Solicitation
Or Warm Springs QTRS 4 Paint/Flooring
Department of the Interior · U.S. Fish and Wildlife Service
Small business set-aside · OR
AI summary Beta
Only small businesses can bid on this total small business set-aside. The Department of the Interior (U.S. Fish and Wildlife Service contracting office) wants interior painting and laminate flooring installed at Quarters #4, a vacant house at Warm Springs National Fish Hatchery, Oregon. The response due date is December 1, 2026, 5:00 PM Pacific, by email, and on-site work is planned for January 19, 2027 through February 19, 2027. A current Oregon Construction Contractors Board (CCB) license is needed, and a subcontractor may hold it.
Who can bid
- Small business; the set-aside is total small business From 140FF027Q0038_TermsConditions_B-M_31pp.pdf
- Current and valid Oregon Construction Contractors Board (CCB) license, held by the prime or by the subcontractor doing the regulated work From B09_Amd1_RFQ140FF027Q0038_QA_3pp_0001.pdf
- References for up to three similar projects completed within the last three years From B09_Amd1_RFQ140FF027Q0038_QA_3pp_0001.pdf
How to submit: Email to nicole_johnson@ios.doi.gov, with all attachments in PDF or Microsoft Office formats. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (9)
From the version posted Nov 19, 2026.
- Serious: Total small business set-aside. Only small businesses can bid; the size standard for this construction code is $45 million. From 140FF027Q0038_TermsConditions_B-M_31pp.pdf
- Serious: Oregon CCB license required. A quote without proof of a current Oregon CCB license is incomplete; a subcontractor's license can be used if named in the bid schedule. From B09_Amd1_RFQ140FF027Q0038_QA_3pp_0001.pdf
- Worth checking: Davis-Bacon wage determination lacks painter and soft-floor classifications. Wage Determination OR20260009 (Davis-Bacon: federal construction wage rates) omits these trades, so the winner starts a wage conformance process after award while quotes still price all labor. From B09_Amd1_RFQ140FF027Q0038_QA_3pp_0001.pdf
Show all 9Show fewer
- Worth checking: Five option items priced separately. Bidders price baseboard and trim replacement, two doors, and bedroom, kitchen and bathroom flooring as options; the Government may award any, all or none of them. From Amd2__Attch4_BidSchedule_Updated_Options_2pp_0002.docx
- Worth checking: No floor plans or measurements provided. Bidders must measure and estimate quantities themselves; the Government has no drawings or takeoffs. From Amd2_QA-2_140FF027Q0038-261119-Final_9pp_0002.pdf
- Worth checking: Built in 1978, no lead survey, no abatement. No lead-based paint inspection exists and quotes must not include hazardous-material abatement; work stops if suspected hazardous material is found. From Amd2_QA-2_140FF027Q0038-261119-Final_9pp_0002.pdf
- Worth checking: Bond rules above $35,000 differ between amendments. Amendment 0001 says applicable bonds are required above $35,000, while Amendment 0002 says payment protection from $35,000 to $150,000 and bonds above $150,000; ask the contracting officer which governs. From B09_Amd1_RFQ140FF027Q0038_QA_3pp_0001.pdf
- Minor: 60-day completion period and set work hours. Work must finish within 60 calendar days of the Notice to Proceed, with the expected on-site window January 19, 2027 through February 19, 2027, and regular hours are limited. From 140FF027Q0038_TermsConditions_B-M_31pp.pdf
- Minor: The site visit was Nov 10, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From Sol_140FF027Q0038.pdf
Read from the notice and 12 attachments. Show which files.
- Sol_140FF027Q0038_Amd_0002.pdf (read)
- Amd2_QA-2_140FF027Q0038-261119-Final_9pp_0002.pdf (read)
- Sol_140FF027Q0038_Amd_0001.pdf (read)
- B09_Amd1_RFQ140FF027Q0038_QA_3pp_0001.pdf (read)
- Sol_140FF027Q0038.pdf (read)
- 140FF027Q0038_TermsConditions_B-M_31pp.pdf (read)
- Amd2_A04_SOW_WarmSpringsPaint-Flooring_261119_Final_Redline_Redacted_7pp_0002.pdf (read)
- Attch1_A04_SOW_WarmSpringsPaint-Flooring_261103_5pp_Redacted.pdf (read)
- Amd2__Attch4_BidSchedule_Updated_Options_2pp_0002.docx (read)
- Attch3_DBA_OR-20260009_5pp.pdf (read)
- Attch4_BidSchedule_1p.docx (read)
- Attch2_Photos_8pp.docx (read)
Full summary
What they want
- Prepare and paint the interior of Quarters #4 (about 2,500 square feet): walls, ceilings, doors, trim, closets, hallways, stairwell, bathrooms, basement and cold air returns
- Leave out the garage, kitchen and bathroom cabinets and stair handrails
- Remove existing carpet in the living room, dining room, hallway, closets, entryway, stairs and landing, and install waterproof laminate flooring or approved equal
- Price separately: replacing baseboards and trim, two replacement interior doors, and flooring in the bedrooms, kitchen and bathrooms
- Supply all labor, materials, equipment and disposal; get any needed permits
- Give a one-year workmanship warranty from the date of Government acceptance
- Contract type
- Firm-fixed-price (FFP: one set price, whatever the work costs) construction purchase order under simplified acquisition procedures, with two base items and five separately priced option items
- Period of performance
- The Government expects to issue the Notice to Proceed (NTP) within 30 calendar days after award. Work must start within 30 calendar days and finish within 60 calendar days after the NTP. The expected on-site window is January 19, 2027 through February 19, 2027.
- Place of performance
- Warm Springs National Fish Hatchery, Quarters #4, 1 Fish Hatchery Road, Warm Springs, OR 97761
- Estimated value
- Magnitude of construction price range: less than $25,000. The Government says this is a general indication and not its budget, target price or a firm maximum.
- How they'll choose
- Best value to the Government considering technical, experience and price; the Government may compare quotes to each other and may award to other than the lowest price or the highest technical rating
- Offers due
- December 1, 2026, 5:00 PM Pacific
- How to submit
- Email to nicole_johnson@ios.doi.gov, with all attachments in PDF or Microsoft Office formats
What they'll judge offers on
- Technical Understanding and Capability: (a) product information for the paint and flooring, (b) manufacturer warranty information, (c) proof of a valid Oregon CCB license, (d) a proposed schedule showing the work fits the required period
- Past Experience: references for up to three similar projects from the last three years; Contractor Performance Assessment Reporting System (CPARS) records are reviewed and rated satisfactory, unsatisfactory or neutral, and no record counts as neutral
- Price: a completed bid schedule with unit prices and totals for each item
What to include when you submit
- Submit the completed Standard Form 1442 (SF 1442: the construction solicitation and offer form), blocks 14 through 20C, signed by an official who can bind the company
- Include signed amendments on Standard Form 30 (SF 30); acknowledge Amendments 0001 and 0002
- Complete the updated bid schedule (Attachment 4 with options): unit price and total for each of the 2 base items and 5 option items, in lump sum (LS)
- Name any painting or flooring subcontractor and its address in the bid schedule
- If using a subcontractor's Oregon CCB license, name the subcontractor in the bid schedule and include a copy of the current license
- Technical submission: product information or brochures for the paint and flooring, manufacturer warranty information, proof of a current Oregon CCB license, and a proposed schedule
- Send references and past performance information for up to three similar projects completed within the last three years, with the project title, location and work description
- For a subcontractor's experience, show which entity did the work and its role
- Send representations and certifications under FAR 52.204-8, or state that they are already in SAM.gov
- If you cannot use the Invoice Processing Platform (IPP) for invoices, send a written waiver request with the quote
After award, you must have
- Certificate of Insurance before on-site work starts; no specific coverage types or limits are set From B09_Amd1_RFQ140FF027Q0038_QA_3pp_0001.pdf:
The apparent successful quoter shall provide a current Certificate of Insurance upon request by the Contracting Officer and before commencement of on-site work.
- Payment protection or bonds if the award is above $35,000: payment protection from $35,000 up to $150,000, and performance and payment bonds above $150,000; none if $35,000 or less From Amd2_QA-2_140FF027Q0038-261119-Final_9pp_0002.pdf:
Performance and payment bonds are required for construction contracts exceeding $150,000 unless an authorized exception applies.
Not in the notice text
- The wage determination file (Attch3_DBA_OR-20260009_5pp.pdf) could not be read; check the rates on SAM.gov
- The relative importance of technical, experience and price is not stated beyond the order in Section M
- Part of 140FF027Q0038_TermsConditions_B-M_31pp.pdf (a middle section of representations and certifications) was left out of what was read
- The Government's budget is not given; the magnitude range of less than $25,000 is not a firm maximum
Notice details
Notice type, codes, versions and files
- Posted
- Nov 19, 2026
- Notice type
- Solicitation
- Office
- FWS Contracting Activity, Falls Church, VA
- Product/service code
- Z2FA · Repair or Alteration of Family Housing Facilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236118)
- Versions
3 versions have been posted, newest first.
- Nov 19, 2026 · Amendment 0002 (this version)Due Dec 1, 2026 (changed)
- Nov 9, 2026 · Amendment 0001Due Nov 24, 2026
- Nov 3, 2026 · SolicitationDue Nov 24, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside