Or Warm Springs QTRS 4 Paint/Flooring
Department of the Interior · U.S. Fish and Wildlife Service
Small business set-aside · OR
A newer version of this notice was posted Nov 19, 2026. It moves the due date from Nov 24, 2026 to Dec 1, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of the version posted Nov 9, 2026. The notice was amended Nov 19, 2026. The due date moved from Nov 24, 2026 to Dec 1, 2026. Check what else changed on SAM.gov.
Solicitation 140FF027Q0038 (with Amendment 0001) is a total small business set-aside for interior painting and laminate flooring at Quarters #4, Warm Springs National Fish Hatchery, Warm Springs, Oregon, for the U.S. Fish and Wildlife Service. It is one firm-fixed-price (FFP: one set price, whatever the work costs) purchase order, and the construction magnitude is under $25,000. The response due date is November 24, 2026 (passed), 5:00 PM Pacific, and a current Oregon Construction Contractors Board (CCB) license is required with the quote.
Who can bid
- Small business: the solicitation is set aside for small business concerns From 140FF027Q0038_TermsConditions_B-M_31pp.pdf
- Current and valid Oregon Construction Contractors Board (CCB) license, held by the prime or by the proposed subcontractor that will do the regulated work From B09_Amd1_RFQ140FF027Q0038_QA_3pp_0001.pdf
- Representations and certifications entered in SAM.gov, kept current From 140FF027Q0038_TermsConditions_B-M_31pp.pdf
How to submit: Email to nicole_johnson@ios.doi.gov, with all attachments in PDF or Microsoft Office formats, due November 24, 2026, 5:00 PM Pacific. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
- Serious: Small business only. Only small businesses can quote; the set-aside is total small business. From 140FF027Q0038_TermsConditions_B-M_31pp.pdf
- Serious: Oregon CCB license required with the quote. Without a current Oregon license held by you or a subcontractor you name, the quote is not complete and may not be considered. From B09_Amd1_RFQ140FF027Q0038_QA_3pp_0001.pdf
- Worth checking: Missing parts mean rejection. Leaving out any required item of the quote package, such as the license proof, schedule or amendment acknowledgment, means the quote is rejected. From 140FF027Q0038_TermsConditions_B-M_31pp.pdf
Show all 8Show fewer
- Worth checking: Davis-Bacon wage determination lacks painter and flooring classifications. Wage Determination OR20260009 applies, but the contractor must ask for added job classifications after award while you price all labor now, so wage rates may be unclear. From B09_Amd1_RFQ140FF027Q0038_QA_3pp_0001.pdf
- Minor: Bonds if the award is above $35,000. No bid bond is needed, but performance and payment bonds are required before award or work starts if the proposed award amount is above $35,000. From B09_Amd1_RFQ140FF027Q0038_QA_3pp_0001.pdf
- Minor: The site visit was Nov 10, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From B09_Amd1_RFQ140FF027Q0038_QA_3pp_0001.pdf
- Minor: Work hours limited to 8:00 AM to 3:30 PM, Monday through Friday. No weekend or federal holiday work; other hours need advance coordination with the Hatchery Manager, which affects the schedule you propose. From 140FF027Q0038_TermsConditions_B-M_31pp.pdf
- Minor: No lead or asbestos survey. The Government does not expect lead paint or asbestos, and quotes must not include abatement; work stops if suspected material turns up. From B09_Amd1_RFQ140FF027Q0038_QA_3pp_0001.pdf
Read from the notice and 8 attachments. Show which files.
- Sol_140FF027Q0038_Amd_0001.pdf (read)
- B09_Amd1_RFQ140FF027Q0038_QA_3pp_0001.pdf (read)
- Sol_140FF027Q0038.pdf (read)
- 140FF027Q0038_TermsConditions_B-M_31pp.pdf (read)
- Attch1_A04_SOW_WarmSpringsPaint-Flooring_261103_5pp_Redacted.pdf (read)
- Attch3_DBA_OR-20260009_5pp.pdf (read)
- Attch4_BidSchedule_1p.docx (read)
- Attch2_Photos_8pp.docx (read)
Full summary
What they want
- Prepare and paint the interior of Quarters #4 (walls, ceilings, doors, trim, closets, hallways, stairwell, bathrooms, basement, cold air returns), with eggshell on walls and ceilings and semi-gloss on doors and trim
- Use Benjamin Moore low-VOC paint or an approved equal, and a mold- and mildew-resistant primer in bathrooms
- Remove existing carpet, padding and tack strips and install Pergo waterproof, pet scratch resistant laminate flooring or an approved equal in the living room, dining room, hallway, hallway closets, entryway, stairs and downstairs landing
- Install stair nosing, transition strips, trim and new baseboards where needed
- Get paint colors and flooring color and finish approved by the Contracting Officer's Representative (COR) before applying or installing
- Furnish all labor, materials, equipment, supervision and disposal, pay for any permits, and clean up daily and at the end
- Give a one-year workmanship warranty from the date of Government acceptance
- Contract type
- Firm-fixed-price (FFP) construction purchase order under simplified acquisition procedures; Bid Schedule lists 2 lump-sum items (QTY 1 LS each)
- Period of performance
- Notice to proceed (NTP) expected within 30 calendar days after award; start within 30 calendar days after receiving it and finish within 60 calendar days after receiving it. Anticipated on-site window: January 19, 2027 through February 19, 2027
- Place of performance
- Warm Springs National Fish Hatchery, Quarters #4, 1 Fish Hatchery Road, Warm Springs, OR 97761
- Estimated value
- Magnitude of construction price range: less than $25,000 (a range, not the Government's exact estimate)
- How they'll choose
- Best value to the Government under simplified acquisition procedures (FAR Part 13); the Government may award to other than the lowest price or the highest technically rated
- Offers due
- November 24, 2026, 5:00 PM Pacific (from the version posted Nov 9, 2026; amended since)
- How to submit
- Email to nicole_johnson@ios.doi.gov, with all attachments in PDF or Microsoft Office formats
What they'll judge offers on
- Price: completed Bid Schedule (Attachment 4) with lump-sum prices
- Technical Understanding and Capability: (a) product information, specifications or brochures for the paint and flooring, (b) manufacturer warranty information, (c) proof of a current Oregon CCB license, (d) proposed schedule showing the work can be done within the required period
- Past Experience: references for up to three similar projects completed within the last three years; Contractor Performance Assessment Reporting System (CPARS) records are reviewed and rated satisfactory, unsatisfactory or neutral
What to include when you submit
- Send the completed Standard Form 1442 (SF 1442, the solicitation and offer form), blocks 14 through 20C, signed by someone with authority to bind the company
- Acknowledge Amendment 0001 with the quote (signed SF 30, the amendment form, or a letter or email naming the solicitation and amendment); a missing acknowledgment may keep the quote from being considered
- Send the lump-sum Bid Schedule (Attachment 4) with a price for each item, and name and address of any painting or flooring subcontractor
- Technical submission: product information for the paint and flooring, manufacturer warranty information, proof of a current Oregon CCB license, and a proposed schedule
- If a subcontractor holds the Oregon CCB license, name that subcontractor in the Bid Schedule and include a copy of the current license with the technical submission
- Past experience: references for up to three projects similar in size, scope and complexity completed within the last three years, with title, location and description of the work
- Say which entity did the work and its role for any subcontractor experience you submit
- Send representations and certifications under FAR 52.204-8, or state that they are already entered in SAM.gov
After award, you must have
- Performance and payment bonds are required only if the proposed award amount is above $35,000; no bid bond is required From B09_Amd1_RFQ140FF027Q0038_QA_3pp_0001.pdf:
No bid bond is required with the quotation.
- Current Certificate of Insurance on request and before on-site work starts; no coverage types or limits are set From B09_Amd1_RFQ140FF027Q0038_QA_3pp_0001.pdf:
The apparent successful quoter shall provide a current Certificate of Insurance…
Not in the notice text
- Wage rates for painter and soft-floor-laying classifications are not in Wage Determination OR20260009; they are set through a conformance process after award
- The Government's exact cost estimate is not given, only a range of less than $25,000
- The wage determination attachment (Attch3_DBA_OR-20260009_5pp.pdf) could not be read as text; check it on SAM.gov for the listed classifications and rates
- The photos attachment (Attch2_Photos_8pp.docx) shows only captions here; check the photos on SAM.gov for room conditions
Notice details
Notice type, codes, versions and files
- Posted
- Nov 9, 2026
- Notice type
- Solicitation
- Office
- FWS Contracting Activity, Falls Church, VA
- Product/service code
- Z2FA · Repair or Alteration of Family Housing Facilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236118)
- Versions
3 versions have been posted, newest first.
- Nov 19, 2026 · Amendment 0002Due Dec 1, 2026 (changed)
- Nov 9, 2026 · Amendment 0001 (this version)Due Nov 24, 2026
- Nov 3, 2026 · SolicitationDue Nov 24, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside