Combined Synopsis/Solicitation
Paint Services in support of the HC-144 Aircraft.
Department of Homeland Security · U.S. Coast Guard
AI summary Beta
This summary may miss requirements: 1 of 6 attachments weren't read (Attachment 2 - Schedule of Services.xlsx). Check the attachments on SAM.gov.
The U.S. Coast Guard Aviation Logistics Center (ALC) in Elizabeth City, NC wants the outsides of its HC-144 aircraft stripped and repainted (solicitation 70Z03827QL0000005). Only a prime contractor that owns and runs its own FAA-certified Part 145 paint facility and does all the paint work itself can be considered. The response due date is November 30, 2026, 4:00 PM Eastern, for one firm-fixed-price (FFP: one set price, whatever the work ends up costing) indefinite-delivery requirements contract, with a base year and four option years.
Who can bid (9)
- Prime contractor must own and operate an onsite FAA-certified Part 145 paint facility and perform all required paint services itself
- Facility must have access to an active runway that can handle a CN-235; aircraft arrive only by fly-in and fly-out From Questions and Answers Solicitation 70Z03827QL0000005 - A0002.pdf
- Onsite environmentally controlled paint facility with a dedicated space for the aircraft, plus equipment to tow, jack, weigh with load cells, and defuel and refuel the aircraft From Attachment 3 - Performance Work Statement - Updated.pdf
Show all 9Show fewer
- Quality system that meets ISO-9000-2001 or AS9100, or one the Coast Guard accepts From Attachment 3 - Performance Work Statement - Updated.pdf
- Experience applying VOC-compliant, high-solid paints as an FAA-certified Part 145 repair center From Attachment 3 - Performance Work Statement - Updated.pdf
- Past Performance rated Superior or Satisfactory From Attachment 1- Terms and Conditions.pdf
- Delivery rating of Superior or Satisfactory From Attachment 1- Terms and Conditions.pdf
- Access to or ability to obtain the Airbus CN-235 maintenance manuals and Air Force or Navy technical orders From Attachment 3 - Performance Work Statement - Updated.pdf
- Registration in the System for Award Management (SAM.gov), kept current From Attachment 1- Terms and Conditions.pdf
How to submit: Email to Steven.A.Goodwin@uscg.mil with 70Z03827QL0000005 in the subject line. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (11)
From the version posted Nov 18, 2026.
- Serious: Prime must own a Part 145 paint facility and do all paint work itself. A small business without its own FAA-certified paint facility cannot team or subcontract its way in. Offerors that do not meet this are not eligible for award.
- Serious: Facility needs a runway that can take a CN-235. Aircraft arrive only by fly-in and fly-out, so the paint facility must have access to an active runway that can handle the aircraft. From Questions and Answers Solicitation 70Z03827QL0000005 - A0002.pdf
- Serious: Past performance must rate Superior or Satisfactory. Offerors must send Past Performance Questionnaires. A Neutral rating (no record) is defined, but only Superior or Satisfactory is called eligible, so a newer firm may be shut out; ask the contracting officer. From Attachment 1- Terms and Conditions.pdf
Show all 11Show fewer
- Worth checking: Contractor bears up to $100,000 of aircraft loss per event. The Government self-insures aircraft in the open, in operation and in flight, but the contractor pays the first part of a loss, and those costs cannot be priced into the contract. From Attachment 3 - Performance Work Statement - Updated.pdf
- Worth checking: Option 1 time limit given as 16 days and as 24 days. The PWS says scuff sand and paint is due within 16 days of receipt in one place and 24 calendar days in the delivery schedule and evaluation text. Ask the contracting officer which governs. From Attachment 3 - Performance Work Statement - Updated.pdf
- Worth checking: Short fixed turnaround. De-paint must be done within 10 calendar days and paint within 17 calendar days of receiving the aircraft; the Coast Guard inspection days are part of the 17 days. From Attachment 3 - Performance Work Statement - Updated.pdf
- Worth checking: Airbus manuals are not supplied. The Coast Guard cannot provide the CN-235 manuals and will not write an authorization letter. A bidder asked and the Coast Guard answered it has no access, so the bidder must find its own access. From Attachment 3 - Performance Work Statement - Updated.pdf
- Worth checking: No payment when the Coast Guard delays an aircraft. If the Coast Guard delivers late or moves the schedule, there is no pay for idle facility time. From Questions and Answers Solicitation 70Z03827QL0000005 - A0002.pdf
- Worth checking: Price all five periods; notice says 5 option periods. Missing prices for any period can get a quote excluded. The notice asks for prices for 5 one-year option periods, while the terms describe a base year and four options. From Attachment 1- Terms and Conditions.pdf
- Minor: Warranty length not set. The PWS requires a warranty for paint failures but no minimum length; the Coast Guard says to provide the warranty with the quote. From Questions and Answers Solicitation 70Z03827QL0000005 - A0002.pdf
- Minor: Onsite visit to the Coast Guard center is optional. A bidder may request an onsite visit to the Aviation Logistics Center in Elizabeth City, NC; requests are due by the closing date.
Read from the notice and 5 attachments. 1 of 6 not read. Show which files.
- Attachment 3 - Performance Work Statement - Updated.pdf (read)
- Attachment 1- Terms and Conditions.pdf (read)
- Attachment 4 - Past Performance Questionnaire.pdf (read)
- Questions and Answers Solicitation 70Z03827QL0000005 - A0002.pdf (read)
- Solicitation 70Z03827QL0000005 - Amendment A0001 Questions and Answers .pdf (read)
- Attachment 2 - Schedule of Services.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
Full summary
What they want
- Scuff sand and repaint the aircraft's outside (Option 1), or strip paint from metal surfaces before depot maintenance and repaint after it (Option 2), following the Coast Guard's HC-144 paint drawings
- Finish in the set time after the aircraft arrives: 10 calendar days to strip, 17 calendar days to paint, and 24 calendar days for scuff-sand-and-paint (the PWS also says 16 days for that option)
- Defuel and refuel the aircraft, tow it, jack and weigh it with load cells, apply temporary aircraft numbers, and lubricate it after painting
- Do minor maintenance tied to painting, such as removing access panels, and tell the contracting officer about any damage beyond that
- Record and hand over paint products, batch numbers, temperature and humidity, paint thickness (goal of 300 micrometers or less) and a Certificate of Conformance
- Fix any defects the Coast Guard inspector finds at final inspection, done at your site; give a warranty for paint failures from workmanship
- Buy all paint removers, cleaners, primers and topcoats, and dispose of waste as the sole waste generator
- Other aircraft such as the C-130 would be added only by separate negotiation
- Contract type
- Firm-fixed-price indefinite-delivery requirements contract (the Government orders as needs arise); all quantities are estimates
- Period of performance
- One base year starting at award plus four one-year options, renewable at the Government's discretion; total not more than five years
- Place of performance
- Elizabeth City, NC, USA, as SAM.gov gives it. The PWS says inspection and acceptance are at the contractor's site, and aircraft arrive by fly-in and fly-out.
- Estimated value
- Not stated
- How they'll choose
- Best value: four factors in order of importance, and all non-price factors together are more important than price
- Offers due
- November 30, 2026, 4:00 PM Eastern
- How to submit
- Email to Steven.A.Goodwin@uscg.mil with 70Z03827QL0000005 in the subject line
What they'll judge offers on
- Technical Acceptability: meets all Performance Work Statement (PWS) requirements, acceptable turnaround time for paint, de-paint and scuff-sand-and-paint, and a thorough understanding of the work; rated Superior, Satisfactory, Marginal or Unsatisfactory
- Past Performance: rated Superior, Satisfactory, Marginal, Unsatisfactory or Neutral; only Superior or Satisfactory is eligible for award; uses Past Performance Questionnaires, Coast Guard records, and federal past performance systems (PPIRS, CPARS)
- Delivery: rated Superior, Satisfactory or Unsatisfactory against 10, 17 and 24 calendar days; only Superior or Satisfactory is eligible for award
- Price: priced lines (contract line item numbers, CLINs) for the base year and all option years; checked for completeness, fairness and unbalanced pricing
What to include when you submit
- Put the solicitation number, company name, address, telephone number, CAGE code and Unique Entity Identifier (UEI) on the quote
- Price every CLIN in Attachment 2 (Schedule of Services) for the base year and all option years; pricing missing for any period can get the quote excluded
- Show how you meet every PWS requirement, with a detailed explanation of any requirement you cannot accomplish; otherwise the Coast Guard assumes no exceptions
- Include your turnaround times for paint, de-paint, and scuff-sand-and-paint
- Send completed Past Performance Questionnaires (Attachment 4): for each contract, a customer contact, contract number and value, dates, work performed, delivery record and quality issues
- Send your paint warranty with the quote
- Send an uncontrolled copy of your Quality Manual with a mission statement; the Coast Guard prefers facility environmental control certifications, ISO or AS9100 certificates and the FAA Part 145 certificate with the proposal
- Include a statement of how far you agree with all terms, conditions and provisions and amendments
- Complete the representations and certifications in the terms (such as the responsibility matters certification), unless collected in SAM
- Hold your prices firm for 60 calendar days after the date offers are due
- Questions were due in writing by October 27, 2026 to Steven.A.Goodwin@uscg.mil
Current contractor
This is a follow-on requirement; the incumbent is King Aerospace Commercial Corporation. The current contract number is not available.
Not in the notice text
- The Schedule of Services (Attachment 2, a spreadsheet with the priced lines, quantities and unit of issue) is attached but not read; check it on SAM.gov before pricing.
- The estimated quantities of aircraft per year and the Government's estimate of the contract value are not stated in the text read
- The minimum length of the paint warranty is not stated
- How many past performance questionnaires to send is not stated
- Whether a Neutral past performance rating can be eligible for award is not clear
- The Service Contract Labor Standards clause is marked as included, but no wage determination appears in the text read
Notice details
Notice type, codes, versions and files
- Posted
- Nov 18, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- Aviation Logistics Center (ALC)(00038), Elizabeth City, NC
- Product/service code
- J016 · Maint/Repair/Rebuild of Equipment – Aircraft Components and Accessories
- Business type
- Transportation, logistics & vehicles (FedReady's grouping, from NAICS 488190)
- Versions
4 versions have been posted, newest first.
- Nov 18, 2026 · Amendment 0003 (this version)Due Nov 30, 2026 (changed)
- Oct 29, 2026 · Amendment 0002Due Nov 23, 2026
- Oct 23, 2026 · Amendment 0001Due Nov 23, 2026
- Oct 20, 2026 · Combined Synopsis/SolicitationDue Nov 23, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- Embraer A-29 Super Tucano aircraft On-Call SupportThe Air Force Test Center wants a firm-fixed-price (FFP: one set price) Basic Ordering Agreement (BOA: a standing agreement with a price list, used for on-call orders) for…
- T-6/T-34 Aircraft Maintenance and Contractor Logistics Support (CLS): Request for Proposal (RFP)
- SCARNG Regional Aviation Phase Support Center for AH-64E Aircraft Maintenance SupportOnly 8(a) firms can bid. The South Carolina Army National Guard wants AH-64E Apache helicopter maintenance support at its Army Aviation Support Facility #1 in Eastover, South…
- P-8A Platform Sustainment Support, Support Equipment Maintenance, Engineering Investigations and Integrated Maintenance AugmentationThe Naval Air Systems Command (NAVAIR) plans to award one contract to The Boeing Company, with no open competition, for P-8A Poseidon aircraft support.
- AH-64D/E Apache Contractor Field Service Representative (CFSR) Sensors SupportThe U.S. Army (Army Contracting Command-Redstone), for the Apache Attack Helicopter Project Management Office, wants a contractor to supply up to nine full-time contractor field…