Modernize Damen (Bldg. 1) Elevators Construction 537-24-101
Department of Veterans Affairs
SDVOSB set-aside · Chicago, IL
A newer version of this notice was posted Nov 17, 2026. It moves the due date from Oct 29, 2026 to Dec 9, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of the version posted Oct 5, 2026. The notice was amended Nov 17, 2026. The due date moved from Oct 29, 2026 to Dec 9, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 4 of 14 attachments weren't read (S06 - Pre-bid Site Visit Sign-in Sheet.pdf, S06 - Odgen Entrance Location.pdf and 2 more). Check the attachments on SAM.gov.
The VA (Network Contract Office 12, Great Lakes Acquisition Center) wants a contractor to modernize nine traction elevators (Damen elevators 1 through 8 plus the Morgue elevator) at Jesse Brown VA Medical Center in Chicago, IL. It is a sealed bid construction job set aside for certified Service-Disabled Veteran-Owned Small Businesses, with all work due within 542 calendar days of notice to proceed. The award goes to the lowest responsive bid, and bids are now due October 29, 2026 (passed).
Who can bid (10)
- Must be a certified Service-Disabled Veteran-Owned Small Business (SDVOSB) and listed as certified in the SBA Small Business Search database From S02 - 36C25226B0011 P.docx
- Must be listed as SDVOSB certified in SBA's Small Business Search (the old VetCert site is no longer used) From S02 - 36C25226B0011 P.docx
- Must be a small business under NAICS 238290 (size standard $22 million) From S02 - 36C25226B0011 P.docx
Show all 10Show fewer
- Bid guarantee on SF24 of at least 20 percent of the bid price, up to $3,000,000, submitted with the bid From S02 - 36C25226B0011 P.docx
- Payment and performance bonds, each equal to the contract value, after award From S02 - 36C25226B0011 P.docx
- Current SAM and SBA DSBS registrations, with proof included in the bid From S02 - 36C25226B0011 P.docx
- Comply with the limitations on subcontracting (VAAR 852.219-75) and include the certification in the bid; the VA may audit contractor records From S02 - 36C25226B0011 P.docx
- Acceptable safety and environmental record and Experience Modification Rate (EMR), documented in the bid From S02 - 36C25226B0011 P.docx
- Joint ventures must submit the JV agreement and proof of SDVOSB certification From S02 - 36C25226B0011 P.docx
- All contractor personnel must meet VA background investigation and PIV badging rules, and comply with the annual influenza vaccination directive (or hold an exemption) From S02 - 36C25226B0011 P.docx
How to submit: Sealed paper bid addressed to the Great Lakes Acquisition Center, 115 South 84th Street, Suite 101, Milwaukee, WI 53214-1476 (SF 1442 Block 8). The text read does not describe an electronic submission option., due October 29, 2026, 10:00 AM CDT (extended by Amendment 0006; earlier amendments moved it from September 21). What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (9)
- Serious: Large bid guarantee and full bonding. You need a surety to back a bid guarantee of up to $3 million plus 100 percent payment and performance bonds on a $10 to $20 million project, which many small firms cannot get. From S02 - 36C25226B0011 P.docx
- Serious: Missing paperwork makes the bid non-responsive. The solicitation says bids missing the SAM/DSBS proof, the VAAR 852.219-75 certification or JV proof are thrown out without evaluation, so the bid package must be checked item by item. From S02 - 36C25226B0011 P.docx
- Serious: Limits on subcontracting for a large elevator job. As an SDVOSB prime you must self-perform a required share of the work, which is hard on a specialized elevator modernization where much work normally goes to elevator subs; the percentage was not in the text read. From S02 - 36C25226B0011 P.docx
Show all 9Show fewer
- Serious: Work inside a live hospital with strict phasing. The hospital runs around the clock, so work is split into phases with dust and infection-control barriers, one-floor-at-a-time door replacement, scheduled outages and interim life safety measures, which raises cost and schedule risk.
- Worth checking: Asbestos in floor mastic and an old, limited survey. The 2016 survey only tested flooring, found asbestos in some floor tile mastic in the Damen Building, and says anything untested must be treated as asbestos, so abatement cost and delays are possible. From S02 - Exhibit 3 537-24-101 SOW - Asbestos Survey Report.pdf
- Worth checking: Safety record and EMR screening. Bidders with more than three serious, or one repeat or willful, OSHA or any EPA violation in three years, or an EMR above 1.0, must explain it, and this feeds the responsibility decision. From S02 - 36C25226B0011 P.docx
- Worth checking: Date passed (Oct 29, 2026): Bid date changed six times and base documents show old dates. The original solicitation form and bid notices still say bids are due and opened September 21, 2026 in Milwaukee, but Amendment 0006 moves the due date to October 29, 2026 at 10:00 AM, so use the amendment and confirm the opening details with the Contracting Officer. From S02 - 36C25226B0011 P.docx
- Worth checking: The site visit was Sep 4, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From S02 - 36C25226B0011 P.docx
- Minor: Tight site security and logistics. No on-site parking, badge and vehicle authorization rules, and a two-day limit on stored materials make daily logistics harder and costlier. From S02 - Exhibit 2 - 537-24-101 - IFB Specifications.pdf
Read from the notice and 10 attachments. 4 of 14 not read. Show which files.
- S02 - Exhibit 2 - 537-24-101 - IFB Specifications.pdf (read)
- S02 - Exhibit 3 537-24-101 - SOW - SOC Floor Plan.pdf (read)
- S06 - 36C25226B0011 0006.pdf (read)
- S06 - 36C25226B0011 0005.pdf (read)
- S06 - 36C25226B0011 0004.pdf (read)
- S06 - 36C25226B0011 0003.pdf (read)
- S06 - 36C25226B0011 0002.pdf (read)
- S06 - 36C25226B0011 0001.pdf (read)
- S02 - 36C25226B0011 P.docx (read)
- S02 - Exhibit 3 537-24-101 SOW - Asbestos Survey Report.pdf (read)
- S06 - Pre-bid Site Visit Sign-in Sheet.pdf: not summarized: open it on SAM.gov
- S06 - Odgen Entrance Location.pdf: not summarized: open it on SAM.gov
- S02 - Exhibit 1 - 537-24-101 IFB Drawings.pdf: not read (it couldn't be opened): open it on SAM.gov
- S02 - Wage Determinations IL20260009 05182026.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Modernize Damen elevators 1 through 8 and the Morgue elevator (nine traction elevators in Building 1A) with new machinery, controllers, hoistway doors and hallway fixtures
- Selective demolition and removal of existing elevator equipment and related mechanical and electrical items
- Work in four phases so elevators stay in service in groups, with dust/infection-control barriers, hoistway cleaning, punch list and elevator inspections for each phase
- Related electrical work: new power distribution panel, emergency breakers, new ATS 1-1 selector panel and emergency wiring
- New sump pumps in elevator pits and upgrades to associated mechanical, electrical and communications systems
- Patch and repaint finishes at elevator lobbies and foyers, and alter partitions where new corridor devices are installed
- Fire alarm, sprinkler and controls tie-ins, plus commissioning, testing and VA staff training
- Provide all tools, materials, labor and supervision under one all-inclusive lump-sum base bid
- Contract type
- Sealed bid (IFB), construction; one all-inclusive lump-sum base bid (CLIN 0001); single award
- Period of performance
- 542 calendar days after receipt of the Notice to Proceed, covering preconstruction through post-substantial completion; no option periods stated
- Place of performance
- Jesse Brown VA Medical Center, 820 S. Damen Ave, Chicago, IL 60612 (Building 1A, an occupied hospital)
- Estimated value
- Project magnitude $10,000,000.00 to $20,000,000.00 (given as guidance, no longer a mandatory element)
- How they'll choose
- Sealed bid: award to the responsible bidder with the lowest responsive bid (price only, no technical tradeoff)
- Offers due
- October 29, 2026, 10:00 AM CDT (extended by Amendment 0006; earlier amendments moved it from September 21) (from the version posted Oct 5, 2026; amended since)
- How to submit
- Sealed paper bid addressed to the Great Lakes Acquisition Center, 115 South 84th Street, Suite 101, Milwaukee, WI 53214-1476 (SF 1442 Block 8). The text read does not describe an electronic submission option.
What they'll judge offers on
- Lowest price among responsive bids
- Responsiveness: required items must be in the bid (bid guarantee, SAM and SBA registry proof, VAAR 852.219-75 certification, JV paperwork if a JV)
- Responsibility: safety and environmental record and Experience Modification Rate (EMR), plus OSHA and EPA database checks
What to include when you submit
- Complete and sign the SF 1442 and fill in the bid price for CLIN 0001 (All-Inclusive Base Bid)
- Include a bid guarantee on form SF24 (at least 20 percent of the bid price, capped at $3,000,000) by the time set for opening
- Include proof of current SAM and SBA Dynamic Small Business Search (DSBS) registrations
- Include the VAAR 852.219-75 certification in the bid package
- Joint ventures must include a copy of the JV agreement and printed proof of SDVOSB certification
- Submit safety and environmental record information: certification about OSHA and EPA violations, current EMR on insurance carrier letterhead, and the Pre-Award Contractor Safety and Environmental Record Evaluation Form with OSHA 300 and 300A forms
- Fill in the contractor information sheet (company, signer, UEI, tax ID, past performance contact)
- Acknowledge Amendments 0001 through 0006
- Awardee must furnish a Payment Bond (SF25A) and Performance Bond (SF25) for the full contract value
- Questions were due in writing to the Contract Specialist and Contracting Officer by close of business September 4, 2026 (already passed); no phone inquiries
Not in the notice text
- The drawings (Exhibit 1) were too large to read, so the exact elevator scope, quantities and details on the drawings are not confirmed here
- Only the first and last part of the specifications (about 37,500 of 1,000,000 characters) was read, including only the start of the four-phase plan; elevator spec section 14 21 10, equipment requirements and any elevator contractor licensing or experience requirements are not confirmed
- The Davis-Bacon wage determination (IL20260009) is a scanned PDF and was not read, so wage rates are unknown
- Only part of the combined solicitation document was read (about 37,500 of 142,727 characters), so the middle sections, including some clauses and instructions, were not seen
- Number of bid copies, whether electronic submission is allowed, and where the October 29 bid opening takes place are not stated in the text read
- The percentage required under the limitations on subcontracting clause is not stated in the text read
- Liquidated damages, insurance minimums and the number of days to deliver bonds after award were not seen
- The site visit sign-in sheet and Ogden Entrance location documents are scanned PDFs and were not read
- No incumbent or prior contractor for the elevators is named
More to check before you bid
- Not certified through VetCert yet? Apply on VetCert (SBA), or start with the SDVOSB guide. More open service-disabled veteran-owned set-asides under NAICS 238290
Notice details
Notice type, codes, versions and files
- Posted
- Oct 5, 2026
- Notice type
- Solicitation
- Office
- 252-Network Contract Office 12 (36C252), Milwaukee, WI
- Product/service code
- Z1DA · Maintenance of Hospitals and Infirmaries
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 238290)
- Versions
9 versions have been posted, newest first.
- Nov 17, 2026 · AmendmentDue Dec 9, 2026 (changed)
- Oct 22, 2026 · AmendmentDue Nov 19, 2026 (changed)
- Oct 5, 2026 · Amendment 0008 (this version)Due Oct 29, 2026 (changed)
- Sep 24, 2026 · AmendmentDue Oct 21, 2026 (changed)
- Sep 18, 2026 · AmendmentDue Sep 29, 2026 (changed)
- Sep 14, 2026 · AmendmentDue Sep 24, 2026 (changed)
- Aug 31, 2026 · AmendmentDue Sep 21, 2026
- Aug 19, 2026 · AmendmentDue Sep 21, 2026
- Aug 18, 2026 · SolicitationDue Sep 21, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Open SDVOSB set-aside contracts
Terms on this notice: Solicitation, SDVOSB (service-disabled veteran-owned small business), Set-aside
Latest amendment note (Amendment 8) from SAM.gov
Similar open opportunities
- 537-26-101 Construction of Ogden Elevator Cab Interiors Jesse Brown VA Medical CenterOnly certified service-disabled veteran-owned small businesses (SDVOSB) can bid on this Department of Veterans Affairs presolicitation (an early notice before the bid request) to…
- WTX Elevator Inspections and Load Testing Services - Amended
- Replace Elevators at FDC MiamiThe Federal Bureau of Prisons plans a firm-fixed-price construction contract to replace four traction and six hydraulic elevators at the Federal Detention Center in Miami, FL. It…
- White City VA Medical Center Elevator Maintenance ServicesSolicitation 36C26027Q0121: the Department of Veterans Affairs (Network Contract Office 20) wants a contractor to maintain and repair the elevators at the White City VA Medical…
- FILA Elevator and vertical lift inspection serviceOnly small businesses can bid on this National Park Service request for quote (RFQ) for monthly inspection, testing and preventive maintenance of two elevators and one platform…