Solicitation
CO OMAD 300(71) Minuteman Missile Access
Department of Transportation · Federal Highway Administration
Small business set-aside · Cheyenne, WY
A newer version of this notice was posted Nov 18, 2026. See the latest version.
AI summary Beta
Summary of another version of this notice: check what changed on SAM.gov. This summary may miss requirements: 2 of 8 attachments weren't read (CO OMAD 300(71) Culverts and Routes Schedule Sepererated.zip, CO OMAD 300(71) Plans_v2.pdf). Check the attachments on SAM.gov.
Sealed-bid construction job (solicitation 6982AF27B000010) set aside for small businesses only. The Federal Highway Administration's Central Federal Lands Division wants gravel added and culverts replaced on Minuteman Missile Access Roads near F.E. Warren Air Force Base, in Colorado, Nebraska and Wyoming. Paper bids only; the response due date is December 2, 2026, 2:00 PM Mountain. The Government's price range is $5,000,000 to $10,000,000.
Who can bid (5)
- Small business set-aside: only small businesses can bid From CO OMAD 300(71) 6982AF27B000010 IFB.pdf
- Small under the $45 million size standard for NAICS 237310 (average annual gross receipts over the past 5 years), with NAICS 237310 in the SAM.gov profile From CO OMAD 300(71) 6982AF27B000010 IFB.pdf
- Original bid bond (bid guarantee) submitted with the bid From CO OMAD 300(71) 6982AF27B000010 IFB.pdf
Show all 5Show fewer
- Active SAM.gov registration when the bid is submitted and at award From CO OMAD 300(71) 6982AF27B000010 IFB.pdf
- Insurance as set in Subsection 107.05 of the FP-24 (the Federal Highway Administration's standard specifications) From CO OMAD 300(71) 6982AF27B000010 IFB.pdf
How to submit: Paper bid in a sealed envelope delivered to Eric Grosskreuz, Federal Highway Administration, Central Federal Lands Division, 12300 W. Dakota Avenue, Lakewood, CO 80228; electronic bids are not accepted. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (7)
From the version posted Nov 18, 2026.
- Serious: Small businesses only. Only small businesses can bid; a business over the $45 million size standard cannot. From CO OMAD 300(71) 6982AF27B000010 IFB.pdf
- Serious: Paper bid with an original bid bond. Bids must be delivered on paper in a sealed envelope, and a copied or faxed bid bond makes the bid non-responsive. From CO OMAD 300(71) 6982AF27B000010 IFB.pdf
- Serious: Prices required for all three schedules. A bidder must price every item in Schedules A, B and C, and the Government awards only one schedule, starting with C and moving down if funds are short. From OMAD FY27_Pre Bid Conference_11122026 FINAL.pdf
Show all 7Show fewer
- Worth checking: Amendments must be acknowledged. Leaving an amendment off Item 19 of the form may get the bid rejected. From OMAD FY27_Pre Bid Conference_11122026 FINAL.pdf
- Worth checking: Performance and payment bonds after award. The winner must furnish performance and payment bonds within 10 calendar days of award, and work starts only after acceptable bonds are received. From CO OMAD 300(71) 6982AF27B000010 IFB.pdf
- Worth checking: Contractor finds its own gravel source. The Government has no preferred source, so the contractor must find a material source that meets the plans before pricing. From QnA CO OMAD 300(71) Minuteman Missile Access 11.17.26.pdf
- Minor: Questions were due Nov 19, 2026. Check the amendments for the agency's answers. From CO OMAD 300(71) 6982AF27B000010 IFB.pdf
Read from the notice and 6 attachments. 2 of 8 not read. Show which files.
- CO OMAD 300(71) 6982AF27B000010 IFB.pdf (read)
- FP-24 Standard Specifications for Construction FHWA Federal Hwy Projects.pdf (read)
- CO OMAD Interested Vendors List.pdf (read)
- QnA CO OMAD 300(71) Minuteman Missile Access 11.17.26.pdf (read)
- OMAD FY27_Pre Bid Conference_11122026 FINAL.pdf (read)
- Questions and Answers CO OMAD 300(71) Minuteman Missile Access.pdf (read)
- CO OMAD 300(71) Culverts and Routes Schedule Sepererated.zip: not read (the AI doesn't read this file type yet): open it on SAM.gov
- CO OMAD 300(71) Plans_v2.pdf: not read (it couldn't be opened): open it on SAM.gov
Full summary
What they want
- Recondition the existing gravel roads and add 4 inches of aggregate surface course, up to 24 feet wide with a 4% crown, all on the existing roadway bench
- Replace or remove culverts (pipe from 18-inch up, plus end sections), with subexcavation and embankment repairs
- Bid three cumulative schedules: A (29.02 miles), B (39.73 miles) and C (45.36 miles); only one schedule is awarded
- Aggregate surface course: 96,200.000 TON (A), 132,000.000 TON (B) and 150,300.000 TON (C); aggregate surface reconditioning: 29.250 MILE (A), 40.010 MILE (B) and 45.670 MILE (C)
- Provide quality control, testing, a construction schedule, soil erosion control, dust control watering, survey and staking of drainage structures, object markers and temporary traffic control
- After award: use the Government's Masterworks system for daily reports and pay notes, and attend its training session
- Contract type
- Sealed bid (invitation for bid, IFB) with a unit price for each pay item; only one of Schedules A, B or C is awarded
- Period of performance
- Work begins within 10 calendar days after the notice to proceed; the completion time is set in Special Contract Requirements (SCR) Section 108.01, which was not in the text read
- Place of performance
- Roads near Francis E. Warren Air Force Base in Logan and Weld counties (Colorado), Kimball county (Nebraska) and Laramie county (Wyoming) (SAM.gov: Cheyenne, WY)
- Estimated value
- $5,000,000 to $10,000,000 (the Government's price range for the project work)
- How they'll choose
- Lowest price: award to the lowest responsive, responsible bidder, subject to funds. The Government evaluates the Schedule C total first, then B, then A, depending on available funds
- Offers due
- December 2, 2026, 2:00 PM Mountain
- How to submit
- Paper bid in a sealed envelope delivered to Eric Grosskreuz, Federal Highway Administration, Central Federal Lands Division, 12300 W. Dakota Avenue, Lakewood, CO 80228; electronic bids are not accepted
What they'll judge offers on
- Price: total of Schedule C, then B, then A, depending on funds available at award
What to include when you submit
- Mark the sealed envelope with the bidder's name and address, the solicitation number, the project number and name, and the date and time bids are due
- Submit the signed Standard Form 1442 (the solicitation, offer and award form), pages A-1 and A-2, and the bid schedule pages
- Price every item in Schedule A, Schedule B and Schedule C; unit prices go to the nearest cent
- Include the completed authority-to-bind certificate, the Buy American Act and hazardous materials pages, the VETS-4212 declaration (the federal contractor veterans' employment report) and the Bidders' Information pages
- Include an original bid bond with original signatures and corporate seals; photocopies and faxed bonds make the bid non-responsive
- Acknowledge every amendment in Item 19 of the Standard Form 1442
- Keep the bid open for at least 60 calendar days after the response due date
After award, you must have
- Performance and payment bonds within 10 calendar days after award; the notice to proceed follows once acceptable bonds are received From CO OMAD 300(71) 6982AF27B000010 IFB.pdf:
Performance and Payment Bonds-Construction…
Current contractor
No incumbent is named.
Not in the notice text
- Parts of the bid package and the plans were not read: the middle of the invitation for bid (including the bid guarantee amount, the wage rate pages, the completion time in SCR Section 108.01, and the special contract requirements) and the plans (CO OMAD 300(71) Plans_v2.pdf, too large) are attached but not read
- Which wage rule applies: the bid package lists a Department of Labor construction wage rate requirement, but its pages were not in the text read, so whether a Davis-Bacon wage determination applies is not confirmed
- Whether there is a site visit: only a non-mandatory virtual pre-bid meeting on November 12, 2026 is described in the text read
- The number of calendar days allowed to finish the work, and the liquidated damages amount
- The bid guarantee amount; the text points to RFO Provision 52.228-1 and Subsection 102.03 of the FP-24
- What the expected amendment changes; none is attached to this notice
- A zip file of culvert and route files (CO OMAD 300(71) Culverts and Routes Schedule Sepererated.zip) is attached but not read
Notice details
Notice type, codes, versions and files
- Posted
- Nov 17, 2026
- Notice type
- Solicitation
- Office
- 6982AF Central Federal Lands Divisi, Lakewood, CO
- Product/service code
- Y1LB · Construction of Highways, Roads, Streets, Bridges, and Railways
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237310)
- Versions
5 versions have been posted, newest first.
- Nov 18, 2026 · Amendment 0004Due Dec 2, 2026
- Nov 17, 2026 · Amendment 0003 (this version)Due Dec 2, 2026
- Nov 13, 2026 · Amendment 0002Due Dec 2, 2026
- Oct 30, 2026 · Amendment 0001Due Dec 2, 2026
- Oct 27, 2026 · SolicitationDue Dec 2, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov